Home Latest Articles
Latest Articles
  • Wang Jijun, Zhang Huanxin, Shi Cheng, Wang Meng
    Railway Sciences. 2024, 3(4): 437-452.
    Purpose

    Temperature is an important load for a ballastless track. However, little research has been conducted on the dynamic responses when a train travels on a ballastless track under the temperature gradient. The dynamic responses under different temperature gradients of the slab are theoretically investigated in this work.

    Design/methodology/approach

    Considering the moving train, the temperature gradient of the slab, and the gravity of the slab track, a dynamic model for a high-speed train that runs along the CRTS Ⅲ slab track on subgrade is developed by a nonlinear coupled way in Abaqus.

    Findings

    The results are as follows: (1) The upward transmission of the periodic deformation of the slab causes periodic track irregularity. (2) Because of the geometric constraint of limiting structures, the maximum bending stresses of the slab occur near the end of the slab under positive temperature gradients, but in the middle of the slab under negative temperature gradients. (3) The periodic deformation of the slab can induce periodic changes in the interlayer stiffness and contact status, leading to a large vibration of the slab. Because of the vibration-reduction capacity of the fastener and the larger mass of the concrete base, the accelerations of both the slab and concrete base are far less than the acceleration of the rail.

    Originality/value

    This study reveals the influence mechanism of temperature gradient-induced periodic deformation in the dynamic responses of the train-track system, and it also provides a guide for the safe service of CRTS Ⅲ slab track.

  • Jingcheng Wen, Yihao Qin, Ye Bai, Xiaoqing Dong
    Railway Sciences. 2024, 3(4): 469-479.
    Purpose

    Express freight transportation is in rapid development currently. Owing to the higher speed of express freight train, the deformation of the bridge deck worsens the railway line condition under the action of wind and train moving load when the train runs over a long-span bridge. Besides, the blunt car body of vehicle has poor aerodynamic characteristics, bringing a greater challenge on the running stability in the crosswind.

    Design/methodology/approach

    In this study, the aerodynamic force coefficients of express freight vehicles on the bridge are measured by scale model wind tunnel test. The dynamic model of the train-long-span steel truss bridge coupling system is established, and the dynamic response as well as the running safety of vehicle are evaluated.

    Findings

    The results show that wind speed has a significant influence on running safety, which is mainly reflected in the over-limitation of wheel unloading rate. The wind speed limit decreases with train speed, and it reduces to 18.83 m/s when the train speed is 160 km/h.

    Originality/value

    This study deepens the theoretical understanding of the interaction between vehicles and bridges and proposes new methods for analyzing similar engineering problems. It also provides a new theoretical basis for the safety assessment of express freight trains.

  • Lin Li, Jiushan Wang, Shilu Xiao
    Railway Sciences. 2024, 3(4): 480-502.
    Purpose

    The aim of this work is to research and design an expert diagnosis system for rail vehicle driven by data mechanism models.

    Design/methodology/approach

    The expert diagnosis system utilizes statistical and deep learning methods to model the real-time status and historical data features of rail vehicle. Based on data mechanism models, it predicts the lifespan of key components, evaluates the health status of the vehicle and achieves intelligent monitoring and diagnosis of rail vehicle.

    Findings

    The actual operation effect of this system shows that it has improved the intelligent level of the rail vehicle monitoring system, which helps operators to monitor the operation of vehicle online, predict potential risks and faults of vehicle and ensure the smooth and safe operation of vehicle.

    Originality/value

    This system improves the efficiency of rail vehicle operation, scheduling and maintenance through intelligent monitoring and diagnosis of rail vehicle.

  • Shaoni Zhou, Zhitian Zhou, Chenxia Kang
    Railway Sciences. 2024, 3(4): 530-539.
    Purpose

    Following the regional restructuring, the number of joint-venture railway companies in which the Group participates has significantly increased. This paper aims to explore the challenges faced by China Railway Group in managing participation in joint-venture railway companies. The study seeks to propose specific approaches to ensure the effective management of these companies, thereby maximizing the benefits of the regional restructuring and supporting the development of a strong transportation country and a modern infrastructure system.

    Design/methodology/approach

    Based on the change in the shareholding relationship between China Railway Group and the joint-venture railway companies, and considering the current situation of the regional restructuring of these companies, as well as the insights from existing literature and typical case studies, this paper proposes some specific paths for effective management of joint-stock railway companies which China Railway Group participated in.

    Findings

    The problems in participation management are the unclear dual leadership role of the party committee, the lack of discourse power, the lack of synergy between shareholders, the increasing risk of sustainable operation of the loss-making companies and the role of dispatched personnel is not fully played. Based on the theories, combined with the existing research and practical cases, the paper proposed specific approaches, such as perfecting top-level system design, maintaining the discourse power, carrying out differentiated management, arranging personnel rationally, arranging shareholders synergy, and innovating methods to provide references for China Railway Group's subsequent management of joint venture railway companies.

    Originality/value

    This paper contributes to the existing literature by providing a comprehensive analysis of the challenges faced by China Railway Group in managing participation in joint-venture railway companies following the regional restructuring. The study offers novel insights and practical recommendations for addressing these challenges. The findings can serve as valuable references for China Railway Group's subsequent management of joint-venture railway companies which participated in, as well as for other state-owned enterprises facing similar challenges in managing their joint ventures.

  • Yanhao Sun, Tao Zhang, Shuxin Ding, Zhiming Yuan, Shengliang Yang
    Railway Sciences. 2024, 3(3): 388-410.
    Purpose

    In order to solve the problem of inaccurate calculation of index weights, subjectivity and uncertainty of index assessment in the risk assessment process, this study aims to propose a scientific and reasonable centralized traffic control (CTC) system risk assessment method.

    Design/methodology/approach

    First, system-theoretic process analysis (STPA) is used to conduct risk analysis on the CTC system and constructs risk assessment indexes based on this analysis. Then, to enhance the accuracy of weight calculation, the fuzzy analytical hierarchy process (FAHP), fuzzy decision-making trial and evaluation laboratory (FDEMATEL) and entropy weight method are employed to calculate the subjective weight, relative weight and objective weight of each index. These three types of weights are combined using game theory to obtain the combined weight for each index. To reduce subjectivity and uncertainty in the assessment process, the backward cloud generator method is utilized to obtain the numerical character (NC) of the cloud model for each index. The NCs of the indexes are then weighted to derive the comprehensive cloud for risk assessment of the CTC system. This cloud model is used to obtain the CTC system's comprehensive risk assessment. The model's similarity measurement method gauges the likeness between the comprehensive risk assessment cloud and the risk standard cloud. Finally, this process yields the risk assessment results for the CTC system.

    Findings

    The cloud model can handle the subjectivity and fuzziness in the risk assessment process well. The cloud model-based risk assessment method was applied to the CTC system risk assessment of a railway group and achieved good results.

    Originality/value

    This study provides a cloud model-based method for risk assessment of CTC systems, which accurately calculates the weight of risk indexes and uses cloud models to reduce uncertainty and subjectivity in the assessment, achieving effective risk assessment of CTC systems. It can provide a reference and theoretical basis for risk management of the CTC system.

  • Mohammed Y. Fattah, Mahmood R. Mahmood, Mohammed F. Aswad
    Railway Sciences. 2024, 3(3): 311-331.
    Purpose

    The main objective of the present research is to investigate the benefits of using geogrid reinforcement in minimizing the rate of deterioration of ballasted rail track geometry resting on soft clay and to explore the effect of load amplitude, load frequency, presence of geogrid layer in ballast layer and ballast layer thickness on the behavior of track system. These variables are studied both experimentally and numerically. This paper examines the effect of geogrid reinforced ballast laying on a layer of clayey soil as a subgrade layer, where a half full scale railway tests are conducted as well as a theoretical analysis is performed.

    Design/methodology/approach

    The experimental tests work consists of laboratory model tests to investigate the reduction in the compressibility and stress distribution induced in soft clay under a ballast railway reinforced by geogrid reinforcement subjected to dynamic load. Experimental model based on an approximate half scale for general rail track engineering practice is adopted in this study which is used in Iraqi railways. The investigated parameters are load amplitude, load frequency and presence of geogrid reinforcement layer. A half full-scale railway was constructed for carrying out the tests, which consists of two rails 800 mm in length with three wooden sleepers (900 mm × 90 mm × 90 mm). The ballast was overlying 500 mm thick clay layer. The tests were carried out with and without geogrid reinforcement, the tests were carried out in a well tied steel box of 1.5 m length × 1mwidth × 1 m height. A series of laboratory tests were conducted to investigate the response of the ballast and the clay layers where the ballast was reinforced by a geogrid. Settlement in ballast and clay, was measured in reinforced and unreinforced ballast cases. In addition to the laboratory tests, the application of numerical analysis was made by using the finite element program PLAXIS 3D 2013.

    Findings

    It was concluded that the settlement increased with increasing the simulated train load amplitude, there is a sharp increase in settlement up to the cycle 500 and after that, there is a gradual increase to level out between, 2,500 and 4,500 cycles depending on the load frequency. There is a little increase in the induced settlement when the load amplitude increased from 0.5 to 1 ton, but it is higher when the load amplitude increased to 2 ton, the increase in settlement depends on the geogrid existence and the other studied parameters. Both experimental and numerical results showed the same behavior. The effect of load frequency on the settlement ratio is almost constant after 500 cycles. In general, for reinforced cases, the effect of load frequency on the settlement ratio is very small ranging between 0.5 and 2% compared with the unreinforced case.

    Originality/value

    Increasing the ballast layer thickness from 20 cm to 30 cm leads to decrease the settlement by about 50%. This ascertains the efficiency of ballast in spreading the waves induced by the track.

  • Changhai Tian, Shoushuai Zhang
    Railway Sciences. 2024, 3(3): 344-366.
    Purpose

    The design goal for the tracking interval of high-speed railway trains in China is 3 min, but it is difficult to achieve, and it is widely believed that it is mainly limited by the tracking interval of train arrivals. If the train arrival tracking interval can be compressed, it will be beneficial for China's high-speed railway to achieve a 3-min train tracking interval. The goal of this article is to study how to compress the train arrival tracking interval.

    Design/methodology/approach

    By simulating the process of dense train groups arriving at the station and stopping, the headway between train arrivals at the station was calculated, and the pattern of train arrival headway was obtained, changing the traditional understanding that the train arrival headway is considered the main factor limiting the headway of trains.

    Findings

    When the running speed of trains is high, the headway between trains is short, the length of the station approach throat area is considerable and frequent train arrivals at the station, the arrival headway for the first group or several groups of trains will exceed the headway, but the subsequent sets of trains will have a headway equal to the arrival headway. This convergence characteristic is obtained by appropriately increasing the running time.

    Originality/value

    According to this pattern, there is no need to overly emphasize the impact of train arrival headway on the headway. This plays an important role in compressing train headway and improving high-speed railway capacity.

  • Yajing Zheng, Dekun Zhang
    Railway Sciences. 2024, 3(3): 332-343.
    Purpose

    The purpose of this paper is to eliminate the fluctuations in train arrival and departure times caused by skewed distributions in interval operation times. These fluctuations arise from random origin and process factors during interval operations and can accumulate over multiple intervals. The aim is to enhance the robustness of high-speed rail station arrival and departure track utilization schemes.

    Design/methodology/approach

    To achieve this objective, the paper simulates actual train operations, incorporating the fluctuations in interval operation times into the utilization of arrival and departure tracks at the station. The Monte Carlo simulation method is adopted to solve this problem. This approach transforms a nonlinear model, which includes constraints from probability distribution functions and is difficult to solve directly, into a linear programming model that is easier to handle. The method then linearly weights two objectives to optimize the solution.

    Findings

    Through the application of Monte Carlo simulation, the study successfully converts the complex nonlinear model with probability distribution function constraints into a manageable linear programming model. By continuously adjusting the weighting coefficients of the linear objectives, the method is able to optimize the Pareto solution. Notably, this approach does not require extensive scene data to obtain a satisfactory Pareto solution set.

    Originality/value

    The paper contributes to the field by introducing a novel method for optimizing high-speed rail station arrival and departure track utilization in the presence of fluctuations in interval operation times. The use of Monte Carlo simulation to transform the problem into a tractable linear programming model represents a significant advancement. Furthermore, the method's ability to produce satisfactory Pareto solutions without relying on extensive data sets adds to its practical value and applicability in real-world scenarios.

  • Sri Viknesh Permalu, Karthigesu Nagarajoo
    Railway Sciences. 2024, 3(3): 265-278.
    Purpose

    In an increasingly interconnected world, transportation infrastructure has emerged as a critical determinant of economic growth and global competitiveness. High-speed rail (HSR), characterized by its exceptional speed and efficiency, has garnered widespread attention as a transformative mode of transportation that transcends borders and fosters economic development. The Kuala Lumpur - Singapore (KL-SG) HSR project stands as a prominent exemplar of this paradigm, symbolizing the potential of HSR to serve as a catalyst for national economic advancement.

    Design/methodology/approach

    This paper is prepared to provide an insight into the benefits and advantages of HSR based on proven case studies and references from global HSRs, including China, Spain, France and Japan.

    Findings

    The findings that have been obtained focus on enhanced connectivity and accessibility, attracting foreign direct investment, revitalizing regional economies, urban development and city regeneration, boosting tourism and cultural exchange, human capital development, regional integration and environmental and sustainability benefits.

    Originality/value

    The KL-SG HSR, linking Kuala Lumpur and Singapore, epitomizes the potential for HSR to be a transformative agent in the realm of economic development. This project encapsulates the aspirations of two dynamic Southeast Asian economies, united in their pursuit of sustainable growth, enhanced connectivity and global competitiveness. By scrutinizing the KL-SG High-Speed Rail through the lens of economic benchmarking, a deeper understanding emerges of how such projects can drive progress in areas such as cross-border trade, tourism, urban development and technological innovation.

  • Rong Zhang, Qi Li
    Railway Sciences. 2024, 3(3): 295-310.
    Purpose

    The China-Europe Railway Express (CR Express) in Chongqing has operated regularly and undergone large-scale development. Its impact on Chongqing's economic growth has become increasingly evident, necessitating further research in this field.

    Design/methodology/approach

    This study employs the opening of CR Express as a quasi-natural experiment, designating Chongqing, which inaugurated the CR Express in 2011, as the treatment group. 13 provinces and cities that had not yet opened the CR Express until 2017 were selected as the control group. Utilizing panel data from 14 provinces across China spanning from 2006 to 2017, the synthetic control method (SCM) is employed to synthetically construct Chongqing. To quantify the difference in economic development levels between Chongqing with the operation of the CR express and Chongqing without its operation. Key metrics such as gross domestic product (GDP), per capita GDP, total retail sales of consumer goods, import and export value and the proportions of the secondary and tertiary industries are employed to measure urban economic development capabilities. Chongqing is designated as the experimental group, and a double-difference model is constructed to regress the operation of the CR Express against economic development capabilities. Robustness tests are conducted to validate the analytical results.

    Findings

    The results indicate that, compared to provinces without the operation of the CR Express, the initiation of the CR Express in Chongqing significantly enhances the economic development level of the city. The opening of the CR Express exhibits a pronounced positive impact on Chongqing's economic development, and these findings remain robust and effective even after parallel trend tests and placebo tests.

    Originality/value

    The study represents an expansion of the theoretical framework. In contrast to previous studies that relied on a single indicator such as GDP, this study selects six indicators from the dimensions of economy, trade and industry to measure regional economic development capabilities. Furthermore, employing the grey relational analysis method, the study screens these indicators, thereby providing a theoretical basis for the selection of indicators for measuring regional economic development capabilities.