Science & Technology Review
|
2018, 36(7): 80-87
• Articles •
System engineering research method for equipment maintenance task allocation and scheduling in wartime
Full
ZAN Xiang, CHEN Chunliang, ZHANG Shixin, LIU Yan, WU Tonghan
Affiliations
Department of Equipment Support and Remanufacturing, Academy of Army Armored Force, Beijing 100072, China
Published: 2018-04-13
doi: 10.3981/j.issn.1000-7857.2018.07.012
Outline
Equipment maintenance task allocation and scheduling in wartime is an important part of equipment maintenance to meet the challenge of information warfare. To reflect the characteristics of equipment maintenance task allocation and scheduling, a systemic structure is established, including process dimension, logical dimension and knowledge dimension based on Hall three-dimension structure theory. Five important processes, five basic steps, and related technology and method are defined in the system structure. On this basis, task priority sorting, task allocation and task scheduling are confirmed as the key problems through the basic process of equipment maintenance task allocation and scheduling. And the target, restrain conditions, input conditions, output conditions and research focus are analyzed for each key problem.
equipment maintenance
/
task allocation and scheduling
/
Hall three-dimension structure theory
/
system engineering
昝翔, 陈春良, 张仕新, 刘彦, 吴同晗.
战时装备维修任务分配与调度的系统工程研究方法.
科技导报,
2018
, 36
(7)
: 80
-87
.
DOI: 10.3981/j.issn.1000-7857.2018.07.012
ZAN Xiang, CHEN Chunliang, ZHANG Shixin, LIU Yan, WU Tonghan.
System engineering research method for equipment maintenance task allocation and scheduling in wartime[J].
Science & Technology Review,
2018
, 36
(7)
: 80
-87
.
DOI: 10.3981/j.issn.1000-7857.2018.07.012
Year 2018 volume 36 Issue 7
PDF
690
167
Cite this Article
BibTeX
Article Info
doi: 10.3981/j.issn.1000-7857.2018.07.012
- Receive Date:2017-11-09
- Online Date:2018-04-27
- Published:2018-04-13