Science & Technology Review
|
2016, 34(18): 251-257
• Articles •
Hydrodynamic performance research of offshore oil and gas exploitation TLP
Full
GUO Ting1, QIN Hongde1, LI Xiaoyong2, WANG Chong1
Affiliations
1. Colloge of Shipbuilding Engineering, Harbin Engineering University, Harbin 150001, China;
2. China Mingyang Wind Power Group Limited, Zhongshan 528400, China
Published: 2016-09-28
doi: 10.3981/j.issn.1000-7857.2016.18.034
Outline
The offshore oil and gas exploitation TLP's hydrodynamic performance is computed, and analyzed by using 3-D potential theory, API of wind and JONSWAP of wave in terms of hydrodynamic coefficients, 1st-order wave load, 1st-order motion response and 2ndorder difference frequency wave load. The results indicate that the 1st-order wave load on TLP of the out-of-plane presents a rapid decreasing trend with the increase of wave frequency. Heave/roll/pitch reach their peaks at the wave frequency 0.4 rad/s, the heave displacement is no more than 5% of water depth and the roll angle less than 5°. It is shown that TLP can effectively avoid wave/wind frequency concentrated areas, and safely work in variety of sea conditions. The 2nd-order difference frequency wave load in the y direction is about 4 times as large as the force in the x direction. Compared with the 1st-order wave loads, the 2nd-order difference frequency wave load is relatively small, but the damage for TLP can not be ignored.
offshore oil and gas exploitation tension leg platform (TLP)
/
1st-order wave load
/
1st-order motion response
/
2nd-order difference frequency wave load
郭霆, 秦洪德, 李晓勇, 王翀.
海洋油气开采张力腿平台的水动力性能.
科技导报,
2016
, 34
(18)
: 251
-257
.
DOI: 10.3981/j.issn.1000-7857.2016.18.034
GUO Ting, QIN Hongde, LI Xiaoyong, WANG Chong.
Hydrodynamic performance research of offshore oil and gas exploitation TLP[J].
Science & Technology Review,
2016
, 34
(18)
: 251
-257
.
DOI: 10.3981/j.issn.1000-7857.2016.18.034
Year 2016 volume 34 Issue 18
PDF
466
101
Cite this Article
BibTeX
Article Info
doi: 10.3981/j.issn.1000-7857.2016.18.034
- Receive Date:2015-09-30
- Online Date:2016-10-21
- Published:2016-09-28