Science & Technology Review
|
2015, 33(9): 59-63
• Articles •
The method of multi well deliverability forecasting based on the geophysical logging information and the limited well testing data
Full
ZHU Lei
Affiliations
CNOOC Research Institute, Beijing 100028, China
Published: 2015-05-13
doi: 10.3981/j.issn.1000-7857.2015.09.010
Outline
Due to the limited well test data, it is difficult to obtain effective information about deliverability in some wells. In this paper, the calibration factor of deliverability is introduced and the calculation methods of the influencing factors are studied, to establish a deliverability forecasting method. The geophysical logging static information is first calibrated by the dynamic data of the well test. Then the deliverability of the whole field is forecasted by the calibrated static data. The seismic data, the geophysical logging data at the beginning of exploration and production, and the well test dynamic data of few important wells are made the best use in this method. This method is applied in some wells in the M gas field. The forcasting deliverability results agree well with the actual deliverability. The calculation precision of the new method is high enough to meet the demand of the project design.
geophysical logging
/
well test
/
static data
/
dynamic data
/
deliverability forecast
/
calibration factor
朱磊.
基于物探测井信息及有限试井资料的多井产能预测方法.
科技导报,
2015
, 33
(9)
: 59
-63
.
DOI: 10.3981/j.issn.1000-7857.2015.09.010
ZHU Lei.
The method of multi well deliverability forecasting based on the geophysical logging information and the limited well testing data[J].
Science & Technology Review,
2015
, 33
(9)
: 59
-63
.
DOI: 10.3981/j.issn.1000-7857.2015.09.010
Year 2015 volume 33 Issue 9
PDF
557
221
Cite this Article
BibTeX
Article Info
doi: 10.3981/j.issn.1000-7857.2015.09.010
- Receive Date:2014-10-31
- Online Date:2015-05-15
- Published:2015-05-13