Study on pitting behavior of low pressure cylinder material in initial condensation zone of steam turbine in peak load regulation unit
1.East China Electric Power Test and Research Institute, China Datang Group Science and Technology Research Institute Co., Ltd., Hefei 230088, China
2.Guangdong Datang International Chaozhou Power Generation Co., Ltd., Chaozhou 521021, China
3.Guangdong Datang International Leizhou Power Generation Co., Ltd., Zhanjiang 524255, China
4.Datang Boiler and Pressure Vessel Inspection Center Co., Ltd., Hefei 230088, China
5.Datang Sanya Future Energy Research Institute Co., Ltd., Sanya 572024, China
收起