Seismic response of integrated underground-aboveground structure system and simplified analysis methods for drift ratio and vertical displacement
aResearch Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
bZhejiang Huadong Geotechnical Investigation & Design Institute Co., Ltd., Hangzhou 310030, China
cGuangzhou Design Institute Group Co., Ltd., Guangzhou 510030, China
dGuangzhou Municipal Construction Group Co., Ltd., Guangzhou 510030, China
eDepartment of Hydraulic Engineering, State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China
收起