收藏切换
Construction of Time Sequence Matching and Disposal Model of Main Alarm Information Rules of Hydropower Centralized Control Platform Based on Python Data Visualization
收藏切换
PDF
Yong-bing SHA1, Fei-ming CHEN1, De-qin CAO1, Tao WANG1, Hui WU1, Xiong HE2
Water Resources and Power | 2023, 41(5) : 182 - 186
Less
收藏切换
Water Resources and Power | 2023, 41(5): 182-186
ELECTROMECHANICS AND CONTROL ENGINEERING
Construction of Time Sequence Matching and Disposal Model of Main Alarm Information Rules of Hydropower Centralized Control Platform Based on Python Data Visualization
Full
Yong-bing SHA1, Fei-ming CHEN1, De-qin CAO1, Tao WANG1, Hui WU1, Xiong HE2
Affiliations
  • 1.Wuling Power Corporation Ltd., Changsha 410000, China
  • 2.Hunan Wuling Power Technology Co., Ltd., Changsha 410004, China
Published: 2023-05-25 doi: 10.20040/j.cnki.1000-7709.2023.20220566
Outline
收藏切换

In order to realize the timing matching and disposing of the main alarm information of the hydropower centralized control platform, a timing matching and disposing model was constructed based on Python data visualization. The model transmitted the fault information of hydropower station equipment to the receiver of hydropower centralized control platform by using communication server, and the fault alarm sequence was generated. After matching the main fault alarm information according to the time sequence matching rules in the domain expert matching rule base, state function and state change function were used to analyze the time sequence characteristics. Then the mapping table was used to describe the timing characteristics of the main alarm information. After analyzing the timing characteristics of the main alarm information, the timing matching and disposal of the main alarm information in the hydropower centralized control platform were realized. Experimental results show that the model has good visualization ability of main alarm information, and the coverage rate of main alarm information crawled by the model is up to 98.99%. The model has higher Pearson correlation coefficient and better ability to deal with the main alarm information.

Python  /  data visualization  /  hydropower centralized control platform  /  information rules  /  timing matching  /  disposal model
Yong-bing SHA, Fei-ming CHEN, De-qin CAO, Tao WANG, Hui WU, Xiong HE. Construction of Time Sequence Matching and Disposal Model of Main Alarm Information Rules of Hydropower Centralized Control Platform Based on Python Data Visualization[J]. Water Resources and Power, 2023 , 41 (5) : 182 -186 . DOI: 10.20040/j.cnki.1000-7709.2023.20220566
Year 2023 volume 41 Issue 5
PDF
121
37
Cite this Article
BibTeX
Article Info
doi: 10.20040/j.cnki.1000-7709.2023.20220566
  • Receive Date:2022-03-23
  • Online Date:2026-01-28
  • Published:2023-05-25
Article Data
Affiliations
History
  • Received:2022-03-23
  • Revised:2022-08-12
Funding
Affiliations
    1.Wuling Power Corporation Ltd., Changsha 410000, China
    2.Hunan Wuling Power Technology Co., Ltd., Changsha 410004, China
References
Share
https://castjournals.cast.org.cn/joweb/sdnykx/EN/10.20040/j.cnki.1000-7709.2023.20220566
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT