收藏切换
Production Line Vehicle Scheduling Problem Based on Plant Simulation
收藏切换
PDF
Hao-ran LIU1, 2, Song-kai LIU2, *, Bin CHEN1
Science Technology and Engineering | 2025, 25(6) : 2406 - 2418
Less
收藏切换
Science Technology and Engineering | 2025, 25(6): 2406-2418
Papers·Automation and Computational Technology
Production Line Vehicle Scheduling Problem Based on Plant Simulation
Full
Hao-ran LIU1, 2, Song-kai LIU2, *, Bin CHEN1
Affiliations
  • 1 Shenyang University of Chemical Technology School of Information Engineering, Shenyang 110142, China
  • 2 Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang 110016, China
Published: 2025-02-28 doi: 10.12404/j.issn.1671-1815.2401271
Outline
收藏切换

With China’s Manufacturing 2025 Plan, the military industry to implement the unmanned production line, and AGV (automated guided vehicle) as a fully automated production line of the main logistics carrier, the scheduling of its strengths and weaknesses directly determines the capacity and efficiency of the entire production line. Due to the security requirements of military industrial places, wireless communication and other means cannot be used, and only point-to-point optical communication can be used, which also worsens the real-time communication of AGVs. Based on Plant Simulation software, a simulation system model was established, the real-time data interaction channel between the logistics simulation software and the field controller was opened, the synchronous operation of the simulation system and the reality was realized, and the seamless connection between the logistics simulation software and the field controller was completed, which effectively solves the difficult problem of poor real-time AGV scheduling caused by the lack of wireless power in the military industry. Experiments have proven that this method effectively simplifies the difficulty of writing the scheduling system and improves the overall real-time performance of the system by 0.058 seconds. Compared with the traditional method, the writing time is shortened by 9.7 times, and the debugging time is even shorter by 22 times. This study lays the foundation for the realization of full automation of military production lines and provides technical support for the use of pulsation production lines in hazardous places.

AGV scheduling  /  Plant Simulation  /  discrete simulation  /  real time performance  /  intelligent dispatching
Hao-ran LIU, Song-kai LIU, Bin CHEN. Production Line Vehicle Scheduling Problem Based on Plant Simulation[J]. Science Technology and Engineering, 2025 , 25 (6) : 2406 -2418 . DOI: 10.12404/j.issn.1671-1815.2401271
Year 2025 volume 25 Issue 6
PDF
443
217
Cite this Article
BibTeX
Article Info
doi: 10.12404/j.issn.1671-1815.2401271
  • Receive Date:2024-02-27
  • Online Date:2025-07-27
  • Published:2025-02-28
Article Data
Affiliations
History
  • Received:2024-02-27
  • Revised:2024-11-28
Affiliations
    1 Shenyang University of Chemical Technology School of Information Engineering, Shenyang 110142, China
    2 Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang 110016, China
References
Share
https://castjournals.cast.org.cn/joweb/kxjsygc/EN/10.12404/j.issn.1671-1815.2401271
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT