The traditional triple network integration evaluation system only considers the 'presence or absence' of rail connection facilities while ignoring the 'quality' of their operation. This limitation prevents proper evaluation of connection inconveniences caused by supplydemand mismatches and poor travel experiences. This study develops a comprehensive evaluation system for "railbusslow travel” integration by: retaining select indicators of “facility availability", introducing new indicators for "supplydemand matching” and “user experience”, as well as proposing key resource allocation methods across facility, network, and operational integration. The research results show that the optimized evaluation system effectively ensures convenience, comfort, and safety in rail connections. The findings provide valuable theoretical and practical references for systematically improving triple network integration in medium and large cities.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |