收藏切换
Transit-Oriented Development (TOD): Planning and Implementation of Public Rail Facilities
收藏切换
PDF
Chunsen WANG, Min XING, Qiyang KANG, Tipeng XIAO
Urban Rapid Rail Transit | 2024, 37(5) : 7 - 12
Less
收藏切换
Urban Rapid Rail Transit | 2024, 37(5): 7-12
Forum of Rapid Rail Transit
Transit-Oriented Development (TOD): Planning and Implementation of Public Rail Facilities
Full
Chunsen WANG, Min XING, Qiyang KANG, Tipeng XIAO
Affiliations
  • Guangzhou Metro Design & Research Institute Co., Ltd. Guangzhou 510010
doi: 10.3969/j.issn.1672-6073.2024.05.002
Outline
收藏切换

With the rapid pace of urban development, the speed of urban rail transit systems in various cities is gradually increasing. The transitoriented development (TOD) model, which focuses on the comprehensive development centered around public rail facilities, has been widely adopted. This has led to a rise in the number of transfer stations and integrated transport hubs. The TOD approach in domestic rail transit is becoming more diverse, and the integration of station cities helps rail transit TOD reach new levels. Largescale rail transit TOD projects generally require planning in the early stages of the project based on advanced planning and coordinated design methods, which are more conducive to the implementation of the main body to create a comprehensive transportation hub project with core characteristics in the area. This study focuses on the mismatch between the core development area of Dongguan and the timing of rail transit construction there. It summarizes the practical path from early planning to implementation based on line networks and detailed planning research and innovatively proposes the construction of public rail facility coconstruction engineering. Advanced planning, coordinated design, and integrated construction models have introduced new design concepts. The research results indicate that the construction of public rail facilities according to the underground space model has solved the problem of urban, comprehensive hub locations being unable to be developed synchronously because of their inability to initiate and implement rail transit projects, provides new research directions for subsequent project development, design, and implementation, and provides successful cases for government decisionmaking.

urban rail transit  /  integrated hub  /  line network planning  /  co-construction engineering  /  transit-oriented development (TOD)
Chunsen WANG, Min XING, Qiyang KANG, Tipeng XIAO. Transit-Oriented Development (TOD): Planning and Implementation of Public Rail Facilities[J]. Urban Rapid Rail Transit, 2024 , 37 (5) : 7 -12 . DOI: 10.3969/j.issn.1672-6073.2024.05.002
Year 2024 volume 37 Issue 5
PDF
281
115
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2024.05.002
  • Receive Date:2023-12-26
  • Online Date:2025-07-09
Article Data
Affiliations
History
  • Received:2023-12-26
  • Revised:2024-06-17
Funding
Affiliations
    Guangzhou Metro Design & Research Institute Co., Ltd. Guangzhou 510010
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2024.05.002
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT