收藏切换
Communication Systems Upgrade Scheme for Existing Subway Station Transfer Transformation
收藏切换
PDF
Haiying LIANG1, 2, Yujie WANG3
Urban Rapid Rail Transit | 2024, 37(1) : 44 - 48
Less
收藏切换
Urban Rapid Rail Transit | 2024, 37(1): 44-48
Upgrading of Existing Lines of Urban Rail Transit: A Featured Topic
Communication Systems Upgrade Scheme for Existing Subway Station Transfer Transformation
Full
Haiying LIANG1, 2, Yujie WANG3
Affiliations
  • 1 Beijing MTR Construction Administration Corporation Beijing 100068
  • 2 Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit Beijing 100068
  • 3 Beijing No.4 Municipal Construction Engineering Co., Ltd. Beijing 100037
doi: 10.3969/j.issn.1672-6073.2024.01.007
Outline
收藏切换

As subway construction in China continues, the network operation mode of subway emerges, and more transfer nodes are created. Due to planning and other factors, the earlierbuilt subway lines did not reserve future transfer access conditions. Thus, when new lines are built, the existing stations often undergo transfer transformation and upgrading along with the new stations. Among the key tasks involved, the communication transmission system transformation and upgrading is crucial. The communication system is the traffic nerve of urban rail, which consists of public security communication system, civil communication system, and special communication system. It supports the information exchange between the control center and the stations and vehicles, and provides stable communication service for passengers. This paper examines the communication room transformation and communication capacity expansion requirements resulting from the transfer station transformation under the existing line operation conditions, and proposes the enhanced MSTP construction scheme for public security transmission system and the backbone transmission system OTN construction scheme. Xitucheng Station of Beijing Metro Line 10 intersects with the newly built metro Changnan Line, and the transfer station changes in building structure and function have raised new requirements for the communication system equipment deployment and upgrade. This paper applies the design scheme to the transfer project, verifies the rationality of the proposed scheme, and the research results offer an application reference scheme for the communication system upgrade of the existing station transfer transformation.

transformation of the existing station  /  transfer node  /  communication systems
Haiying LIANG, Yujie WANG. Communication Systems Upgrade Scheme for Existing Subway Station Transfer Transformation[J]. Urban Rapid Rail Transit, 2024 , 37 (1) : 44 -48 . DOI: 10.3969/j.issn.1672-6073.2024.01.007
Year 2024 volume 37 Issue 1
PDF
704
334
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2024.01.007
  • Receive Date:2023-05-09
  • Online Date:2025-07-09
Article Data
Affiliations
History
  • Received:2023-05-09
  • Revised:2024-01-04
Funding
Affiliations
    1 Beijing MTR Construction Administration Corporation Beijing 100068
    2 Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit Beijing 100068
    3 Beijing No.4 Municipal Construction Engineering Co., Ltd. Beijing 100037
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2024.01.007
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT