Analysis and Treatment of Leakage for High Pressure Evaporator of Waste Heat Boiler in CCPP (Combined Cycle Power Plant)
收藏切换
PDF
Ping Li, Yu-jing Li, Hai-gang Zhang, Xiao-min Meng
Science & Technology of Baotou Steel | 2024, 50(3) : 1 - 4
Less
收藏切换
Science & Technology of Baotou Steel | 2024, 50(3): 1-4
Expert Forum
Analysis and Treatment of Leakage for High Pressure Evaporator of Waste Heat Boiler in CCPP (Combined Cycle Power Plant)
Full
Ping Li, Yu-jing Li, Hai-gang Zhang, Xiao-min Meng
Affiliations
  • Power Supply General Plant of Inner Mongolia Baotou Steel Union Co., Ltd., Baotou 014010, Inner Mongolia Autonomous Region, China
Published: 2024-06-25
Outline
收藏切换

As an efficient energy conversion system, the combined cycle power plant (CCPP) is widely used in such industrial fields as iron and steel. As the core component of CCPP, stable operation of waste heat boiler directly affects efficiency and safety of the entire unit. In the paper, the in-depth study aiming at frequent leak problem at the upper part of high pressure evaporator of supporting waste heat boiler facing flue gas in gas turbine unit of a steel plant is carried out as well as the leakage causes are analyzed to be that the deposit sediment in its lower header causes water flow rate in evaporator tube to be decreased so that impingement corrosion of steam water mixture is generated. Meanwhile, the phenomenon of “flue gas corridor” in local area of furnace exacerbates the corrosion process. For these problems, such measures as replacing leaking pipe section, reforming periodic discharge pipe system of lower header to improve efficiency of pollution discharge, repairing and perfecting gas baffle to reduce formation of “flue gas corridor”, optimizing periodic pollution discharge operations as well as formulating periodic plans of inspection and maintenance are taken to effectively solve the leak problem for high pressure evaporator so that the stability and safety of equipment are improved.

combined cycle power plant  /  waste heat boiler  /  high pressure evaporator  /  analysis of leakage  /  treatment scheme
Ping Li, Yu-jing Li, Hai-gang Zhang, Xiao-min Meng. Analysis and Treatment of Leakage for High Pressure Evaporator of Waste Heat Boiler in CCPP (Combined Cycle Power Plant)[J]. Science & Technology of Baotou Steel, 2024 , 50 (3) : 1 -4 .
Year 2024 volume 50 Issue 3
PDF
109
51
Cite this Article
BibTeX
Article Info
  • Receive Date:2024-02-25
  • Online Date:2025-10-24
  • Published:2024-06-25
Article Data
Affiliations
History
  • Received:2024-02-25
Affiliations
    Power Supply General Plant of Inner Mongolia Baotou Steel Union Co., Ltd., Baotou 014010, Inner Mongolia Autonomous Region, China
References
Share
https://castjournals.cast.org.cn/joweb/bgkj/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT