The stope highway of Baiyunebo Iron Mine is constructed with gravel grading materials, a lot of dust and exhaust gas are produced during the operation of mine-cars and sprinklers, which not only cause great damage to personal and environment, but also have security risks when the heavily-loaded sprinklers go down the slope. Through research and analysis of the fixed highway running condition in Baiyunebo Iron Mine, a set of electric control spraying system of the stope is built to complete the watering dust suppression of the fixed highway and realize the safety production and environmental protection of the highway in the mine stope.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |