In this article, the construction technology of synchronous sliding for steel box girder of Lanzhou Chaijiaxia Yellow River Bridge is comprehensively summarized. The construction scheme of “assemble on both shores, incremental launching toward each other and accumulate sliding section by section” is systematically proposed through researching the synchronous sliding technology for steel box girder. Moreover, such technical problems as the sliding route, setting of temporary piers, assembly of sections for girder of slippage and length of steel launching nose are solved through the BIM (building information modeling) technology. The control measures for key technologies of sliding construction are sorted out in this paper, which could provide references for sliding constructions of girder for cross-river cable-stayed bridge under complicated conditions.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |