A Reservoir Scheduling Benefit-risk Equilibrium Optimization Model Considering Runoff Uncertainty and Its Application
1.China Yangtze Power Co., Ltd., Yichang 443002, China
2a.School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
2b.Hubei Key Laboratory of Digital River Basin Science and Technology, Huazhong University of Science and Technology, Wuhan 430074, China
2c.Institute of Water Resources and Hydropower, Huazhong University of Science and Technology, Wuhan 430074, China
3.Hubei Key Laboratory of Intelligent Yangtze River and Hydropower Science, Yichang 443002, China
收起