收藏切换
Comprehensive Analysis of Flood Discharge Hydraulics Prototype Observation of Danjiangkou Dam Heightening Project
收藏切换
PDF
Rong ZHOU1, Sheng-fan LIU2, Hai-cong YANG3
Water Resources and Power | 2023, 41(10) : 58 - 61
Less
收藏切换
Water Resources and Power | 2023, 41(10): 58-61
HYDROLOGICAL FORECAST AND OPTIMAL SCHEDULING
Comprehensive Analysis of Flood Discharge Hydraulics Prototype Observation of Danjiangkou Dam Heightening Project
Full
Rong ZHOU1, Sheng-fan LIU2, Hai-cong YANG3
Affiliations
  • 1.South-to-North Water Diversion Middle Route Water Source Co., Ltd., Danjiangkou 442700, China
  • 2.Changjiang River Scientific Research Institute, Wuhan 430010, China
  • 3.Hanjiang Water Resources and Hydropower (Group) Co., Ltd., Wuhan 430048, China
Published: 2023-10-25 doi: 10.20040/j.cnki.1000-7709.2023.20230066
Outline
收藏切换

Danjiangkou Dam is a control project for the development and protection of the Hanjiang River basin, and is also a water source project for the Middle Route Project of the South-to-North Water Transfer Project. The dam operation safety is the support and guarantee of the national strategy. After the dam heightening, the operating water head will increase, and there may be cavitation, and the downstream scour pit will move upward during the flood discharge process. In order to master the mechanical characteristics of flood discharge after heightening the dam and evaluate the safety of flood discharge structures, the parameters such as bottom flow velocity, dynamic water pressure, flow cavitation noise, and scouring under the dam are mainly observed by means of field hydraulic prototype observation, and the results of previous studies are analyzed. The observation parameters under the design water level are within the safe range. Aiming at the problem that the water tongue of the surface hole impacts the middle wall, the opening order of the flood discharge orifice is optimized. The causes of the scour holes in the flow channel and side wall after the flood season are analyzed and the treatment suggestions are put forward. The problems found and treatment measures can provide reference for similar projects.

Danjiangkou Dam  /  hydraulics  /  prototype observation  /  optimal scheduling
Rong ZHOU, Sheng-fan LIU, Hai-cong YANG. Comprehensive Analysis of Flood Discharge Hydraulics Prototype Observation of Danjiangkou Dam Heightening Project[J]. Water Resources and Power, 2023 , 41 (10) : 58 -61 . DOI: 10.20040/j.cnki.1000-7709.2023.20230066
Year 2023 volume 41 Issue 10
PDF
82
7
Cite this Article
BibTeX
Article Info
doi: 10.20040/j.cnki.1000-7709.2023.20230066
  • Receive Date:2023-01-13
  • Online Date:2026-01-28
  • Published:2023-10-25
Article Data
Affiliations
History
  • Received:2023-01-13
  • Revised:2023-02-14
Affiliations
    1.South-to-North Water Diversion Middle Route Water Source Co., Ltd., Danjiangkou 442700, China
    2.Changjiang River Scientific Research Institute, Wuhan 430010, China
    3.Hanjiang Water Resources and Hydropower (Group) Co., Ltd., Wuhan 430048, China
References
Share
https://castjournals.cast.org.cn/joweb/sdnykx/EN/10.20040/j.cnki.1000-7709.2023.20230066
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT