For Guxian hydro-junction project, concrete volume is huge, and the construction period is tight, construction technology and parallel planning are key problems in the construction of high RCC gravity dam. Therefore, the simulation technology of discrete event system was introduced to establish the construction simulation model in line with the dam type characteristics of the dam to simulate and calculate the construction process of concrete partition, parallel and jump warehouse. After multi-scheme simulation, the flat inclined layer technology and the corresponding warehouse surface partition scheme were recommended, and the warehouse surface control criteria were put forward. It provides all-round data support for Guxian project, and its simulation model can be used as a reference for other similar projects.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |