收藏切换
Field Test of Water Filling Technology of Impervious Gravel Soil for 300 m Height Earth Core Rockfill Dam
收藏切换
PDF
Yong GUO1, Jian-bo ZHANG1, Sheng ZHANG1, Yong-fu HU2, Zhao-ying WANG2
Water Resources and Power | 2023, 41(2) : 100 - 102
Less
收藏切换
Water Resources and Power | 2023, 41(2): 100-102
DAM SAFETY AND MONITORING
Field Test of Water Filling Technology of Impervious Gravel Soil for 300 m Height Earth Core Rockfill Dam
Full
Yong GUO1, Jian-bo ZHANG1, Sheng ZHANG1, Yong-fu HU2, Zhao-ying WANG2
Affiliations
  • 1.HydroChina Guiyang Engineering Corporation, Guiyang 550081, China
  • 2.Huaneng Lancang River Hydropower Inc., Kunming 650214, China
Published: 2023-02-25 doi: 10.20040/j.cnki.1000-7709.2023.20220919
Outline
收藏切换

Aiming at the low natural moisture content of natural wide graded gravel anti-seepage soil material in 300 m level high core wall rockfill dam, field contrast test between the process of “belt conveyor filling water + stacker heap + bin stuffy material” and the process of “layered paving + pipe network water + bin stuffy material” was carried out to verify the rationality and feasibility of the relevant filling water process. The test results show that the combination process of belt conveyor with water is superior to the pipe network stratified water process, mainly manifested that the belt conveyor automatic water system can achieve real-time, efficient and accurate automatic water filling soil; After water replenishment, the soil material is transported by the belt and piled by the stacker, which can realize automatic and uniform piling. After adding water to soil material, the moisture content inside the soil material is basically stable during 3-4 days of smother, and the time required for smother is short. This paper also put forward the improvement measures of water filling process of belt conveyor. The improved process of "water filling of belt conveyor + stoker + silo boring" can provide reference for soil water content adjustment of similar earth-rock dam.

300 m grade earth core rockfill dam  /  natural broad-graded gravel soil  /  impervious soil material modification  /  increase of water content  /  technical process
Yong GUO, Jian-bo ZHANG, Sheng ZHANG, Yong-fu HU, Zhao-ying WANG. Field Test of Water Filling Technology of Impervious Gravel Soil for 300 m Height Earth Core Rockfill Dam[J]. Water Resources and Power, 2023 , 41 (2) : 100 -102 . DOI: 10.20040/j.cnki.1000-7709.2023.20220919
Year 2023 volume 41 Issue 2
PDF
131
35
Cite this Article
BibTeX
Article Info
doi: 10.20040/j.cnki.1000-7709.2023.20220919
  • Receive Date:2022-05-05
  • Online Date:2026-01-27
  • Published:2023-02-25
Article Data
Affiliations
History
  • Received:2022-05-05
  • Revised:2022-05-23
Affiliations
    1.HydroChina Guiyang Engineering Corporation, Guiyang 550081, China
    2.Huaneng Lancang River Hydropower Inc., Kunming 650214, China
References
Share
https://castjournals.cast.org.cn/joweb/sdnykx/EN/10.20040/j.cnki.1000-7709.2023.20220919
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT