Aiming at the optimal dispatching problem of cascade hydropower stations in the lower reaches of the Jinshajiang River during the drawdown period, based on the analysis of the reservoir water balance, water level, discharge flow rate, and unit output, a daily-scale refined scheduling model was established by maximizing the total power generation of cascaded reservoirs and considering the actual scheduling requirements. The model was solved using the DPSA-POA algorithm. The effectiveness of the model and solution method was verified by the actual case. The results show that the proposed scheduling model can make full use of water resources and maximize the power generation in the drawdown period under the premise of ensuring the safe operation of each reservoir. Thus, it provides theoretical basis and technical support for the refined scheduling management of the cascaded reservoirs.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |