收藏切换
Selection of Filling Mining Scheme and Optimization of Stope Structure Parameters of an Iron Deposit
收藏切换
Linfang MEI1, Peng DENG2, Zhiyi HE1, Shaobo MAO1, Weidong SONG2
Mining Research and Development | 2025, 45(2) : 25 - 32
Less
收藏切换
Mining Research and Development | 2025, 45(2): 25-32
Selection of Filling Mining Scheme and Optimization of Stope Structure Parameters of an Iron Deposit
Full
Linfang MEI1, Peng DENG2, Zhiyi HE1, Shaobo MAO1, Weidong SONG2
Affiliations
  • 1.Wisco Resources Group Co., Ltd., Huangshi, Hubei 435006, China
  • 2.School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China
Published: 2025-02-25
Outline
收藏切换

In order to select the best filling mining scheme and to optimize stope structure parameters of a high-value iron deposit, combined with the mining technical conditions of the deposit in the stage of −120 m to −180 m, the selection of mining scheme was regarded as a typical fuzzy decision problem. The analytic hierarchy process was used to obtain the weights of 11 indexes, and the fuzzy mathematics was used for comprehensive evaluation. The mining scheme of this iron deposit was selected as the sublevel drilling stage open stoping with subsequent filling method. Based on numerical simulation, four groups of stope structural parameters of the preferred mining scheme were optimized. The simulation results are concluded as follows. Firstly, in the process of mining, the tensile failure of each scheme is obvious, and the stress concentration occurs at the junction of the pillar and the roof. The maximum horizontal displacement of the central monitoring point at two sides of the stope and the maximum vertical displacement of the central monitoring point at the roof are 9.4 mm and 9.6 mm, respectively. Secondly, in the process of pillar mining, the shear failure of each scheme is obvious, and the maximum vertical displacement of the stope roof center in scheme Ⅱ is 28.0 mm. From the perspective of safety and economy, the optimal stope structure parameters of an iron mine are 15 m room width and 15 m pillar width. The scheme and the optimized stope structure parameters have achieved good economic benefits in mine production.

High-value iron deposit  /  Fuzzy comprehensive evaluation  /  Numerical simulation  /  Optimization of stope structure parameters
梅林芳, 邓朋, 何志义, 毛少波, 宋卫东. 某铁矿床充填采矿方案优选及采场结构参数优化. 矿业研究与开发, 2025 , 45 (2) : 25 -32 .
Linfang MEI, Peng DENG, Zhiyi HE, Shaobo MAO, Weidong SONG. Selection of Filling Mining Scheme and Optimization of Stope Structure Parameters of an Iron Deposit[J]. Mining Research and Development, 2025 , 45 (2) : 25 -32 .
Year 2025 volume 45 Issue 2
61
30
Cite this Article
BibTeX
Article Info
  • Receive Date:2024-03-08
  • Online Date:2026-10-29
  • Published:2025-02-25
Article Data
Affiliations
History
  • Received:2024-03-08
Affiliations
    1.Wisco Resources Group Co., Ltd., Huangshi, Hubei 435006, China
    2.School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China
References
Share
https://castjournals.cast.org.cn/joweb/kyyjykf/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT