Research on Advanced Mining of High-Grade Pillars and Construction of Artificial False Roof in a Copper-Nickel Mine
收藏切换
Fukang FENG1, 2, Tianzi YANG3, Dongrui LIU1, 2, Xiangyang GAI3, Lei MA3
Mining Research and Development | 2026, 46(1) : 79 - 89
Less
收藏切换
Mining Research and Development | 2026, 46(1): 79-89
Research on Advanced Mining of High-Grade Pillars and Construction of Artificial False Roof in a Copper-Nickel Mine
Full
Fukang FENG1, 2, Tianzi YANG3, Dongrui LIU1, 2, Xiangyang GAI3, Lei MA3
Affiliations
  • 1.Changsha Institute of Mining Research Co., Ltd., Changsha, Hunan 410012, China
  • 2.National Engineering Research Center for Metal Mining, Changsha, Hunan 410012, China
  • 3.Hami Hexin Mining Co., Ltd., Hami, Xinjiang 839000, China
Published: 2026-01-25
Outline
收藏切换

In response to the mining technical problems of high-grade pillars caused by insufficient preparation in mining levels and stopes, as well as significant fluctuations in ore output grade in a copper-nickel mine, three mining methods were proposed, namely panel mechanized upward drift filling mining method, downward drift filling mining method, and combined mining method of upward drift and strip medium-length hole. The panel mechanized upward drift filling mining method was determined to be the optimal solution with comparative analysis of the advantages, disadvantages, technical and economic indexes of these methods. The classical Janssen theory of granular pressure was used to calculate the overburden load of pillars. The mechanical models of simply supported beam and soft support weak plate were adopted to analyze the relationship between the thickness of artificial false roof and the maximum compressive stress. By comprehensively considering the construction form of artificial false roof and the mechanical properties of cementitious materials, the filling and construction parameters of artificial false roof were determined as follows: the thickness of the artificial false roof is 7.0 m, and the 28-day strength of the filling body is 4.5 MPa. To address the quality, safety and cost problems in the construction of artificial false roof, by optimizing the construction plan, the Optimization Scheme Ⅰ was confirmed as the optimal solution, that is, the artificial false roof serves as the direct roof of the 10 m roof pillar in the lower stope. The artificial false roof adopted a reinforcement design scheme of bottom reinforcement, waist reinforcement and top reinforcement combined. Application results show that the proposed pillar mining scheme is practical and feasible. The panel production capacity of pillar stopes increases to 276 t/d, the pillar recovery rate reaches 82%, and the stope ground pressure activities remain stable. The construction technology of artificial false roof is highly operable, safe and reliable. This scheme has realized the safe and efficient recovery of pillar resources, providing technical reference for pillar mining in similar mines.

High-grade pillar  /  Advanced mining  /  Artificial false roof  /  Mechanical model  /  Scheme optimization  /  Reinforcement design
冯福康, 杨甜滋, 刘东锐, 盖向阳, 马磊. 某铜镍矿高品位底柱超前回采与人工假顶构筑研究. 矿业研究与开发, 2026 , 46 (1) : 79 -89 .
Fukang FENG, Tianzi YANG, Dongrui LIU, Xiangyang GAI, Lei MA. Research on Advanced Mining of High-Grade Pillars and Construction of Artificial False Roof in a Copper-Nickel Mine[J]. Mining Research and Development, 2026 , 46 (1) : 79 -89 .
Year 2026 volume 46 Issue 1
71
21
Cite this Article
BibTeX
Article Info
  • Receive Date:2025-01-11
  • Online Date:2026-10-29
  • Published:2026-01-25
Article Data
Affiliations
History
  • Received:2025-01-11
Funding
Affiliations
    1.Changsha Institute of Mining Research Co., Ltd., Changsha, Hunan 410012, China
    2.National Engineering Research Center for Metal Mining, Changsha, Hunan 410012, China
    3.Hami Hexin Mining Co., Ltd., Hami, Xinjiang 839000, China
References
Share
https://castjournals.cast.org.cn/joweb/kyyjykf/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT