Research on Detection and Treatment Schemes for Collapsed Loose Areas in Kalatongke Copper-Nickel Mine
收藏切换
Yajun WANG1, 2, Yin CHEN3, Jinhai LIU3, Jintao LU4, Gang CAO1, 2, Yunwei ZHANG3, Shouqiang LI3
Mining Research and Development | 2025, 45(12) : 91 - 97
Less
收藏切换
Mining Research and Development | 2025, 45(12): 91-97
Research on Detection and Treatment Schemes for Collapsed Loose Areas in Kalatongke Copper-Nickel Mine
Full
Yajun WANG1, 2, Yin CHEN3, Jinhai LIU3, Jintao LU4, Gang CAO1, 2, Yunwei ZHANG3, Shouqiang LI3
Affiliations
  • 1.Changsha Institute of Mining Research Co., Ltd., Changsha, Hunan 410012, China
  • 2.State Key Laboratory of Metal Mine Safety Technology, Changsha, Hunan 410012, China
  • 3.Xinjiang Kalatongke Mining Co., Ltd., Altay Prefecture, Xinjiang 836100, China
  • 4.Research Centre, Ministry of Emergency Management, PRC, Beijing 100013, China
Published: 2025-12-25
Outline
收藏切换

After the 1# orebody of Kalatongke Copper-Nickel Mine was mined by the caving method, a large collapsed loose area was formed. This collapased loose area has deteriorated the mining environment of the upper ore and rock, so that the resources are difficult to be effectively recovered, and the safety of vertical shafts faces a threat. To conduct in-depth detection and treatment of this area, the loose boundary was initially determined through geological drilling and TRT advanced detection in the early stage. Due to channel blockage, traditional detection equipment could hardly access the target area. The C-ALS Gyro endoscopic three-dimensional scanning system was used to conduct detailed detection of the potential area, which clarified the location, shape and volume of the large loose area. It was found that this area only exists locally, and the overall collapse scope tends to be stable. By comparing three treatment schemes including waste rock backfilling treatment, caving surrounding rock treatment and cemented filling treatment, a comprehensive analysis of the advantages and disadvantages of each scheme was conducted. In accordance with the treatment principles, it was determined to adopt the cemented filling treatment scheme. The actual treatment effect shows that the cemented filling treatment scheme enhances regional stability, increases the resource recovery rate by approximately 30%, improves the safety guarantee level, reduces environmental impact.

Collapsed loose area  /  Geological drilling  /  TRT advanced detection  /  Endoscopic three-dimensional scanning  /  Cemented filling
王亚军, 陈寅, 刘金海, 鲁金涛, 曹港, 张云韦, 李守强. 喀拉通克铜镍矿塌陷松散区探测与治理方案研究. 矿业研究与开发, 2025 , 45 (12) : 91 -97 .
Yajun WANG, Yin CHEN, Jinhai LIU, Jintao LU, Gang CAO, Yunwei ZHANG, Shouqiang LI. Research on Detection and Treatment Schemes for Collapsed Loose Areas in Kalatongke Copper-Nickel Mine[J]. Mining Research and Development, 2025 , 45 (12) : 91 -97 .
Year 2025 volume 45 Issue 12
94
44
Cite this Article
BibTeX
Article Info
  • Receive Date:2024-12-02
  • Online Date:2026-10-28
  • Published:2025-12-25
Article Data
Affiliations
History
  • Received:2024-12-02
Funding
Affiliations
    1.Changsha Institute of Mining Research Co., Ltd., Changsha, Hunan 410012, China
    2.State Key Laboratory of Metal Mine Safety Technology, Changsha, Hunan 410012, China
    3.Xinjiang Kalatongke Mining Co., Ltd., Altay Prefecture, Xinjiang 836100, China
    4.Research Centre, Ministry of Emergency Management, PRC, Beijing 100013, China
References
Share
https://castjournals.cast.org.cn/joweb/kyyjykf/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT