Optimization of Stope Structure Parameters of “Arch Bridge Method” Mining Scheme in a Gold Mine
收藏切换
Peng ZHANG1, Botao WANG1, Chaoyang BAI1, 2, Shuanping LIU1, Xingming ZHANG1, Peng DENG2
Mining Research and Development | 2025, 45(8) : 14 - 21
Less
收藏切换
Mining Research and Development | 2025, 45(8): 14-21
Optimization of Stope Structure Parameters of “Arch Bridge Method” Mining Scheme in a Gold Mine
Full
Peng ZHANG1, Botao WANG1, Chaoyang BAI1, 2, Shuanping LIU1, Xingming ZHANG1, Peng DENG2
Affiliations
  • 1.Shaanxi Taibai Gold Mining Co., Ltd., Baoji, Shaanxi 721000, China
  • 2.School of Civil and Resources Engineering, University of Science and Technology Beijing, Beijing 100083, China
Published: 2025-08-25
Outline
收藏切换

To solve the mining problem of orebody under the main transport roadway in the middle section of 790 m of a gold mine, an “Arch Bridge Method” mining scheme was put forward. The top pillar and interval pillar of the stope were simplified into a mechanical model, and the safety thickness of the top pillar under two constraints of fixed support and simple support was calculated as 7.09 m using the Reissner thick plate theory. The rationality of the “Arch Bridge Method” of 6 m width isolation interval pillar was verified using the Bieniawski pillar strength calculation formula. The “Arch Bridge Method” mining scheme with the interval pillar width of 6 m and the top pillar thickness of 6 m, 8 m, 10 m and 12 m respectively was designed. The FLAC3D numerical simulation software was used to simulate the influences of the width of the interval pillar and the thickness of the top pillar on the stability of the stope and the main transport roadway. The results show that based on the analysis of the stress field, displacement field, and plastic zone in the stope, the optimal thickness of top pillar for the “Arch Bridge Method” mining scheme is determined to be 10 meters. In the subsequent production practice, the loss rate, dilution rate and ore grade of the “Arch Bridge Method” mining scheme are similar to those of the upward horizontal layered filling mining method in the same stage. The production capacity of the stope is increased by 94.4%, and the transportation capacity of 900 t/d in the main transport roadway of 790 m is maintained, which provides a solution for the same mine problems.

“Arch Bridge Method” mining  /  Stope structure parameter  /  Safety thickness of top pillar  /  Reissner thick plate theory  /  Numerical simulation
张鹏, 王博涛, 白朝阳, 刘拴平, 张星明, 邓朋. 某金矿“拱桥法”开采方案采场结构参数优化. 矿业研究与开发, 2025 , 45 (8) : 14 -21 .
Peng ZHANG, Botao WANG, Chaoyang BAI, Shuanping LIU, Xingming ZHANG, Peng DENG. Optimization of Stope Structure Parameters of “Arch Bridge Method” Mining Scheme in a Gold Mine[J]. Mining Research and Development, 2025 , 45 (8) : 14 -21 .
Year 2025 volume 45 Issue 8
72
37
Cite this Article
BibTeX
Article Info
  • Receive Date:2024-09-06
  • Online Date:2026-10-28
  • Published:2025-08-25
Article Data
Affiliations
History
  • Received:2024-09-06
Affiliations
    1.Shaanxi Taibai Gold Mining Co., Ltd., Baoji, Shaanxi 721000, China
    2.School of Civil and Resources Engineering, University of Science and Technology Beijing, Beijing 100083, China
References
Share
https://castjournals.cast.org.cn/joweb/kyyjykf/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT