收藏切换
Mine Energy Scheduling Method Integrating Source-Load Uncertainty and Multi-Level Collaboration
收藏切换
Guangchao Liu
Mining Research and Development | 2026, 46(8) : 278 - 287
Less
收藏切换
Mining Research and Development | 2026, 46(8): 278-287
Mine Energy Scheduling Method Integrating Source-Load Uncertainty and Multi-Level Collaboration
Full
Guangchao Liu
Affiliations
  • Henan College of Industry and Information Technology, Jiaozuo, Henan 454000, China
Published: 2026-08-25
Outline
收藏切换

In view of the mining integrated energy system suffers from multiple source-load uncertainties including fluctuating wind and photovoltaic output, dynamic variation of mine production load and unstable associated energy output after the integration of new energy such as wind power and photovoltaic power, which greatly increases scheduling complexity and makes it difficult to guarantee energy efficiency, a scheduling method integrating uncertainty analysis and multi-level collaboration optimization was proposed. Firstly, an energy flow model covering source-grid-load-storage was constructed, and a multi-scale source-load uncertainty interval model was established to quantify fluctuation risks. Secondly, a multi-time scale collaborative scheduling framework of day-ahead, intra-day slow layer and intra-day fast layer was designed, and the NSGA-Ⅱ algorithm was improved by adopting a time series segmentation strategy to realize the global optimization of operational cost and energy efficiency. Simulation results based on the integrated energy system of Datong Mining Area show that the system operation cost is reduced to 170 500 yuan, the renewable energy utilization rate is increased to 89.1%, the carbon emission is decreased to 6.83 t, the load tracking error is cut down to 18.9 kW, and the peak shaving rate reaches 17.2%. In addition, the average single-time period solution time of the scheduling method based on series segmentation NSGA-Ⅱ is only 7.0 ms, which is significantly superior to that of traditional methods. The research results verify the effectiveness of the energy scheduling method integrating source-load uncertainty and multi-level collaboration in improving the operational efficiency, energy conservation and emission reduction level of mine energy systems. Feasible scheduling strategies and algorithm support are provided for the efficient and low-carbon operation of mining integrated energy systems under complex uncertain conditions.

Mining integrated energy system  /  Source-load uncertainty  /  Multi-time scale optimization  /  Multi-level collaboration  /  Energy scheduling
刘广超. 融合源荷不确定性与多级协同的矿山能源调度方法. 矿业研究与开发, 2026 , 46 (8) : 278 -287 .
Guangchao Liu. Mine Energy Scheduling Method Integrating Source-Load Uncertainty and Multi-Level Collaboration[J]. Mining Research and Development, 2026 , 46 (8) : 278 -287 .
Year 2026 volume 46 Issue 8
55
11
Cite this Article
BibTeX
Article Info
  • Receive Date:2026-04-15
  • Online Date:2026-10-27
  • Published:2026-08-25
Article Data
Affiliations
History
  • Received:2026-04-15
Funding
Affiliations
    Henan College of Industry and Information Technology, Jiaozuo, Henan 454000, China
References
Share
https://castjournals.cast.org.cn/joweb/kyyjykf/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT