收藏切换
Application of Mechanized Upward Drift Filling Mining Method in a Soft, Fractured and Thick Large Orebodies of a Gold Mine
收藏切换
Yu Wang1, 2, 3, Jiubo Liao1, 2, 3, Xihao Li1, 2, 3
Mining Research and Development | 2026, 46(8) : 87 - 95
Less
收藏切换
Mining Research and Development | 2026, 46(8): 87-95
Application of Mechanized Upward Drift Filling Mining Method in a Soft, Fractured and Thick Large Orebodies of a Gold Mine
Full
Yu Wang1, 2, 3, Jiubo Liao1, 2, 3, Xihao Li1, 2, 3
Affiliations
  • 1.Changsha Institute of Mining Research Co., Ltd., Changsha, Hunan 410012, China
  • 2.State Key Laboratory of Safety Technology of Metal Mines, Changsha, Hunan 410012, China
  • 3.Hunan Research Center of Mine Geological Disaster Prevention and Environmental Recycling Technology, Changsha, Hunan 410012, China
Published: 2026-08-25
Outline
收藏切换

Based on the occurrence characteristics of the soft, fractured, and thick large orebodies in a gold mine, the mechanized upward drift filling mining method was recommended. Six sets of stope structural parameters were designed through an orthogonal experiment, and the FLAC3D numerical simulation software was utilized to analyse the stope stability. The simulation results indicate that the compressive and tensile stresses in the stope are mainly concentrated at the top and bottom corners of the sidewalls, and both exhibit a symmetrical distribution. The displacement values of the stope roof, floor, and hanging wall surrounding rock increase with the increase of the drift width and drift height, but the overall displacement values are relatively small. On the premise of ensuring the safety and stability of the stope, larger stope structural parameters are preferentially selected to improve the technical and economic indicators. Therefore, Scheme 3 (with both the drift width and drift height being 5 m) is determined as the optimal stope layout scheme. The field application results indicate that when the mechanized upward drift filling mining method is adopted for extraction, the stope production capacity reaches 220 t/d, and the development and cutting ratio is 24.5 m3/kt. Furthermore, the ore loss rate is 6.2%, and the dilution rate is 8.3%, achieving favourable technical and economic benefits.

Mechanized upward drift filling mining method  /  Stoping process  /  Stope structural parameter  /  Stability analysis  /  Numerical simulation
王宇, 廖九波, 李熙浩. 机械化上向进路充填采矿法在某金矿软弱破碎厚大矿体中的应用. 矿业研究与开发, 2026 , 46 (8) : 87 -95 .
Yu Wang, Jiubo Liao, Xihao Li. Application of Mechanized Upward Drift Filling Mining Method in a Soft, Fractured and Thick Large Orebodies of a Gold Mine[J]. Mining Research and Development, 2026 , 46 (8) : 87 -95 .
Year 2026 volume 46 Issue 8
57
13
Cite this Article
BibTeX
Article Info
  • Receive Date:2025-07-15
  • Online Date:2026-10-27
  • Published:2026-08-25
Article Data
Affiliations
History
  • Received:2025-07-15
Affiliations
    1.Changsha Institute of Mining Research Co., Ltd., Changsha, Hunan 410012, China
    2.State Key Laboratory of Safety Technology of Metal Mines, Changsha, Hunan 410012, China
    3.Hunan Research Center of Mine Geological Disaster Prevention and Environmental Recycling Technology, Changsha, Hunan 410012, China
References
Share
https://castjournals.cast.org.cn/joweb/kyyjykf/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT