收藏切换
Research on Horizontal Lateral Medium-Deep Hole Blasting Mining Technology
收藏切换
Yang Zhang1, Xu Zheng1, Zhijie Zheng2, 3, Dan Huang2, 3
Mining Research and Development | 2026, 46(8) : 123 - 131
Less
收藏切换
Mining Research and Development | 2026, 46(8): 123-131
Research on Horizontal Lateral Medium-Deep Hole Blasting Mining Technology
Full
Yang Zhang1, Xu Zheng1, Zhijie Zheng2, 3, Dan Huang2, 3
Affiliations
  • 1.Xinjiang Kalatongke Mining Co., Ltd., Fuyun, Xinjiang 836107, China
  • 2.BGRIMM Technology Group Co., Ltd., Beijing 100160, China
  • 3.National Center for International Joint Research on Green Metal Mining, Beijing 102628, China
Published: 2026-08-25
Outline
收藏切换

To realize safe and efficient mining in a copper-nickel mine in Xinjiang, a horizontal lateral medium-deep hole blasting mining technology was proposed. Firstly, blasting parameters are preliminarily determined by the empirical analogy method: the blast hole diameter is 65 mm, the minimum resistance line is 1.625-2.275 m, the hole spacing is 1.300-2.275 m, continuous in-hole charging is adopted, the unit explosive consumption is 0.35-0.5 kg/t, and the millisecond delay initiation interval is 25 ms. Interval stemming is adopted for blast holes, with stemming lengths of 1 m and 2 m respectively. Subsequently, the LS-DYNA finite element software was used to carry out numerical simulation analysis on horizontal lateral medium-deep hole blasting. The numerical simulation results show that rock can be effectively broken by blasting and the stability of backfill roof can be guaranteed when the minimum resistance line is 1.5 m and the hole spacing is 1.0-1.5 m. Finally, field verification tests were carried out. The results show that the shape of the drift stope after blasting is relatively regular. The predicted overbreak and underbreak volume is less than 10%, No oversize blocks or fine ore are generated, and the backfill roof remains intact, achieving favorable blasting performance.

Horizontal lateral medium-deep hole blasting  /  Downward cut-and-fill cemented mining method  /  Blasting parameter  /  Numerical simulation
张洋, 郑旭, 郑志杰, 黄丹. 水平侧向中深孔爆破采矿技术研究. 矿业研究与开发, 2026 , 46 (8) : 123 -131 .
Yang Zhang, Xu Zheng, Zhijie Zheng, Dan Huang. Research on Horizontal Lateral Medium-Deep Hole Blasting Mining Technology[J]. Mining Research and Development, 2026 , 46 (8) : 123 -131 .
Year 2026 volume 46 Issue 8
54
13
Cite this Article
BibTeX
Article Info
  • Receive Date:2025-05-30
  • Online Date:2026-10-27
  • Published:2026-08-25
Article Data
Affiliations
History
  • Received:2025-05-30
Funding
Affiliations
    1.Xinjiang Kalatongke Mining Co., Ltd., Fuyun, Xinjiang 836107, China
    2.BGRIMM Technology Group Co., Ltd., Beijing 100160, China
    3.National Center for International Joint Research on Green Metal Mining, Beijing 102628, China
References
Share
https://castjournals.cast.org.cn/joweb/kyyjykf/EN/
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT