收藏切换
Burn Cut Design with Ultra-Deep Central Hole for Fractured Surrounding Rock
收藏切换
Jia LUO1, 2, Hao ZHANG1, 2, Pengfei GAO1, 2
Mining and Metallurgical Engineering | 2026, 46(4) : 67 - 73
Less
收藏切换
Mining and Metallurgical Engineering | 2026, 46(4): 67-73
• MINING •
Burn Cut Design with Ultra-Deep Central Hole for Fractured Surrounding Rock
Full
Jia LUO1, 2, Hao ZHANG1, 2, Pengfei GAO1, 2
Affiliations
  • 1.Hunan Nonferrous Metals Research Institute Co., Ltd., Changsha 410100, Hunan, China
  • 2.Hunan Provincial Key Laboratory of Comprehensive Utilization of Complex Copper-Lead-Zinc Associated Metal Resources, Changsha 410100, Hunan, China
doi: 10.3969/j.issn.0253-6099.2026.04.009
Outline
收藏切换

Aiming at the problems of low blasthole utilization rate, high specific explosive consumption, high detonator consumption, and irregular roadway forming during the excavation of roadways with fractured surrounding rock in a gold mine, an optimization method for burn cut parameters by adopting ultra-deep central hole is proposed. The optimized rock-breaking mechanism is revealed by triple synergistic effect, including enhanced rock throwing via central hole charging, stress wave guidance through large empty-hole spacing, and bottom pre-fragmentation. A three-dimensional cut blasting model is established using ANSYS/LS-DYNA software to simulate four working conditions featuring a 200 mm ultra-deep central hole and enhanced bottom charge, with empty-hole spacings of 130 mm, 160 mm, 190 mm, and 220 mm. By analyzing the effective stress distribution, cut-cavity dimensions, rock-throwing process, and energy variation under different working conditions, the optimal empty-hole spacing is finally determined to be 160 mm. Field test results show that the optimized blasting scheme increases the blasthole utilization rate from 87% to 95.8%-97.8%, reduces explosive consumption by 13.3% and detonator consumption by 14.29%, and controls the over-excavation of two roadway sidewalls within 100 mm. Such findings can provide a theoretical basis and technical reference for similar roadway excavation engineering in fractured surrounding rock.

roadway excavation  /  roadway blasting  /  burn cut  /  blasting for advancement  /  ultra-deep central hole  /  fractured surrounding rock  /  numerical simulation  /  over excavation
罗佳, 张豪, 高鹏飞. 基于中心孔超深的破碎围岩直眼掏槽爆破技术研究. 矿冶工程杂志, 2026 , 46 (4) : 67 -73 . DOI: 10.3969/j.issn.0253-6099.2026.04.009
Jia LUO, Hao ZHANG, Pengfei GAO. Burn Cut Design with Ultra-Deep Central Hole for Fractured Surrounding Rock[J]. Mining and Metallurgical Engineering, 2026 , 46 (4) : 67 -73 . DOI: 10.3969/j.issn.0253-6099.2026.04.009
Year 2026 volume 46 Issue 4
120
27
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.0253-6099.2026.04.009
  • Receive Date:2026-02-07
  • Online Date:2026-10-08
Article Data
Affiliations
History
  • Received:2026-02-07
Affiliations
    1.Hunan Nonferrous Metals Research Institute Co., Ltd., Changsha 410100, Hunan, China
    2.Hunan Provincial Key Laboratory of Comprehensive Utilization of Complex Copper-Lead-Zinc Associated Metal Resources, Changsha 410100, Hunan, China
References
Share
https://castjournals.cast.org.cn/joweb/kygczz/EN/10.3969/j.issn.0253-6099.2026.04.009
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT