Mining Sequence and Stability During Transition from Open-Pit to Underground Mining in Miaochong Iron Mine
收藏切换
Quan JIANG1, Jielin LI2, Yongfei YE1, Jianhui QIU2
Mining and Metallurgical Engineering | 2025, 45(6) : 8 - 13
Less
收藏切换
Mining and Metallurgical Engineering | 2025, 45(6): 8-13
• MINING •
Mining Sequence and Stability During Transition from Open-Pit to Underground Mining in Miaochong Iron Mine
Full
Quan JIANG1, Jielin LI2, Yongfei YE1, Jianhui QIU2
Affiliations
  • 1.Zhongye Changtian International Engineering Co., Ltd., Changsha 410025, Hunan, China
  • 2.School of Resources and Safety Engineering, Central South University, Changsha 410083, Hunan, China
doi: 10.3969/j.issn.0253-6099.2025.06.002
Outline
收藏切换

To meet the requirements during a 2-year transition period from open-pit to underground mining in Miaochong Iron Mine, its productivity continuity and mining stability were analyzed. Based on ore reserve estimation, Panel ① and Panel ② at the southern end of the roadway at midsection (370 m) of ore body are decided to be an initial mining plan for the transition period. Then, a model including ore bodies, rock formation, open-pit mine and underground roadways is built with FLAC3D software, which is then adopted to analyze the displacement, stress and plastic zone distribution characteristics of the open-pit and roadways at the midsection (370 m) during the transition period. The results show that the ore quantities in Panel ① and Panel ② at the midsection (370 m) during the transition period can ensure production capacity requirement, but also is sufficient for subsequent mining. It is found that the overall displacement of the open-pit and roadways at the midsection (370 m) is less than 5 mm, and compressive stress becomes dominant in the stress distribution, which is far lower than the stress resistance of the rock mass. There is no large-scale continuous plastic zone, indicating good stability and small impact by mining disturbance. In practical production, it is recommended that a segmented millisecond blasting should be adopted to achieve a staggered blasting operation between open-pit and underground mine. Besides, efforts should be intensified in monitoring open-pit slope and underground roadways to ensure safe production during the transition from open-pit to underground mining.

transition from open-pit to underground mining  /  transition period  /  mining sequence  /  productivity continuity  /  collaborative mining  /  numerical simulation  /  stope stability
蒋权, 李杰林, 叶永飞, 邱剑辉. 庙冲铁矿露天转地下开采过渡期协同开采顺序及稳定性研究. 矿冶工程杂志, 2025 , 45 (6) : 8 -13 . DOI: 10.3969/j.issn.0253-6099.2025.06.002
Quan JIANG, Jielin LI, Yongfei YE, Jianhui QIU. Mining Sequence and Stability During Transition from Open-Pit to Underground Mining in Miaochong Iron Mine[J]. Mining and Metallurgical Engineering, 2025 , 45 (6) : 8 -13 . DOI: 10.3969/j.issn.0253-6099.2025.06.002
Year 2025 volume 45 Issue 6
113
29
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.0253-6099.2025.06.002
  • Receive Date:2025-07-12
  • Online Date:2026-10-08
Article Data
Affiliations
History
  • Received:2025-07-12
Funding
Affiliations
    1.Zhongye Changtian International Engineering Co., Ltd., Changsha 410025, Hunan, China
    2.School of Resources and Safety Engineering, Central South University, Changsha 410083, Hunan, China
References
Share
https://castjournals.cast.org.cn/joweb/kygczz/EN/10.3969/j.issn.0253-6099.2025.06.002
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT