The construction forms of overlapping sections of shield tunnels are complicated, so it is urgent to investigate the response rules of existing buildings to the disturbance of tunnel construction, so as to reduce the potential construction risks. In this paper, the finite element method was used to simulate the influence of mud-water shield machine on the existing building foundation when the superimposed shield tunnel was driven. First, the down tunnel was excavated, then the up tunnel was excavated, and the concrete influence of this sequence on the stability of the foundation was studied. The simulation results are compared with the field monitoring data to verify the reliability of the model. The results show that the foundation bottom continues to settle when the tunnel is excavated. When the tunnel is excavated, the settlement of the foundation slows down and a slight uplift occurs. After the completion of the ascending tunnel, the settlement at the bottom of the foundation presents a linear distribution. In addition, the vertical load increases on the basis of the main influence of the stacked tunnel under the existing buildings, which makes the lining stress and deformation increase. The research results will provide design and reference value for cascade tunnel engineering.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |