Analysis of the three-dimensional in-situ stress state and underground cavern stability of a pumped storage hydropower station in Xinjiang, China
1Institute of Geomechanics, Chinese Academy of Geological Sciences, Beijing 100081, China
2College of Geosciences and Surveying Engineering, China University of Mining and Technology, Beijing 100083, China
3China United Engineering Corporation Limited, Hangzhou 310051, Zhejiang, China
4Northwest Engineering Corporation Limited, Xi’an 710065, Shaanxi, China
收起