收藏切换
Research on Key Construction Technologies of Subway Shield Tunneling Through Existing Building Anchor Cables Groups: Taking Shenyang Metro Line 3 as an Example
收藏切换
Yudong TIAN
Urban Rapid Rail Transit | 2025, 38(6) : 63 - 71
Less
收藏切换
Urban Rapid Rail Transit | 2025, 38(6): 63-71
• Civil Engineering Technology •
Research on Key Construction Technologies of Subway Shield Tunneling Through Existing Building Anchor Cables Groups: Taking Shenyang Metro Line 3 as an Example
Full
Yudong TIAN
Affiliations
  • China Railway 15TH Bureau Group Corporation Limited, Beijing 100083
Published: 2025-12-10 doi: 10.3969/j.issn.1672-6073.2025.06.009
Outline
收藏切换

Based on the shield tunneling subway crossing through the existing anchor cable group between Wenfu Road Station and Fuming Street Station of Shenyang Subway Line 3 as the background. The paper analyzed various treatment schemes for shield tunneling through anchor cable areas. Through comprehensive comparison of technology, economy, and construction period, combined with the actual project conditions, a scheme was proposed involving the mining primary lining method to excavate tunnels, remove intruding anchor cables, backfill with mortar, and subsequently conduct shield tunneling. Numerical model analyses were performed for various construction stages, and comparative analyses were conducted by integrating on-site monitoring data. The results show that the mining primary lining method can effectively remove anchor cables, and mortar backfilling eliminates obstacles and hidden dangers for subsequent shield construction. The shield advancement proceeded normally without requiring chamber opening. The surface deformation data from construction monitoring is slightly larger than that from numerical analysis, but the deformation patterns are basically consistent, both showing a trend of larger values in the middle and smaller values towards the edges. Engineering practice has proven that the method is safe and reliable, and it can provide a reference for similar projects.

urban rail transit  /  shield tunneling  /  anchor cable intrusion  /  anchor cable removal  /  primary lining of mining method  /  mortar back-filling  /  shield tunneling
田予东. 盾构穿越既有建筑锚索群关键技术研究——以沈阳地铁3号线为例. 都市快轨交通, 2025 , 38 (6) : 63 -71 . DOI: 10.3969/j.issn.1672-6073.2025.06.009
Yudong TIAN. Research on Key Construction Technologies of Subway Shield Tunneling Through Existing Building Anchor Cables Groups: Taking Shenyang Metro Line 3 as an Example[J]. Urban Rapid Rail Transit, 2025 , 38 (6) : 63 -71 . DOI: 10.3969/j.issn.1672-6073.2025.06.009
Year 2025 volume 38 Issue 6
81
16
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2025.06.009
  • Receive Date:2025-01-01
  • Online Date:2026-10-19
  • Published:2025-12-10
Article Data
Affiliations
History
  • Received:2025-01-01
  • Revised:2025-07-15
Funding
Affiliations
    China Railway 15TH Bureau Group Corporation Limited, Beijing 100083
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2025.06.009
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT