收藏切换
Practices and Insights of Tokyo Metro Underground Station Platform Renovation
收藏切换
Zhenbo WANG
Urban Rapid Rail Transit | 2025, 38(6) : 140 - 147
Less
收藏切换
Urban Rapid Rail Transit | 2025, 38(6): 140-147
• Overseas Rapid Rail Transit •
Practices and Insights of Tokyo Metro Underground Station Platform Renovation
Full
Zhenbo WANG
Affiliations
  • Technical Center of Shanghai Shentong Metro Group Co., Ltd., Shanghai 201103
Published: 2025-12-10 doi: 10.3969/j.issn.1672-6073.2025.06.018
Outline
收藏切换

To the lack of technologies and practical experience in non-suspension renovation of underground station platforms under non-reserved conditions in China, a study is conducted on the civil engineering renovation situation and the platform renovation practices of Tokyo Metro underground stations. Firstly, through statistics, the spatiotemporal distribution characteristics of Tokyo Metro stations that have undergone civil engineering renovation are analyzed, and the influence of laying method and reserved conditions on the timing and construction duration of renovation is explored. Subsequently, the process for civil engineering renovation of Tokyo Metro underground stations is delineated. Finally, based on specific cases, the main objectives and key points of platform extension, platform widening, platform addition and comprehensive platform renovation are analyzed, and relevant insights for the construction of metro stations in China are summarized. The study results show that about 15.1% of the current 259 underground stations of Tokyo Metro have undergone civil engineering renovation, which is a considerable number. The civil engineering renovation construction steps of underground stations usually follow “from outside to inside, build new first and then demolish old”. For the underground stations of Tokyo Metro, only platform extension may have reserved platform extension space based on the length of future train formation, whereas platform renovations under non-reserved conditions prioritize minimizing renovation scale, demonstrating that underground lines need to pay attention to reservation design with high cost-effectiveness and the underground station platform renovation under no reserved conditions needs to emphasize targeting. The long-term station renovation project needs to strengthen risk warning and dynamic control. Station-city integration requires balancing station passenger flow carrying capacity with surrounding land development intensity. The study findings can provide reference for the design and renovation of underground station platforms in China.

urban rail transit  /  Tokyo Metro  /  station civil engineering renovation  /  underground station  /  platform renovation
王镇波. 东京地铁地下车站站台改造做法及启示. 都市快轨交通, 2025 , 38 (6) : 140 -147 . DOI: 10.3969/j.issn.1672-6073.2025.06.018
Zhenbo WANG. Practices and Insights of Tokyo Metro Underground Station Platform Renovation[J]. Urban Rapid Rail Transit, 2025 , 38 (6) : 140 -147 . DOI: 10.3969/j.issn.1672-6073.2025.06.018
Year 2025 volume 38 Issue 6
83
18
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2025.06.018
  • Receive Date:2025-05-12
  • Online Date:2026-10-19
  • Published:2025-12-10
Article Data
Affiliations
History
  • Received:2025-05-12
  • Revised:2025-08-01
Funding
Affiliations
    Technical Center of Shanghai Shentong Metro Group Co., Ltd., Shanghai 201103
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2025.06.018
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT