The maximum operating speed of urban rail expresses is 160 km/h. As the main technical parameters of the gauge in the current national standards do not cover this speed, this study uses theoretical analysis and dynamic simulation methods to research the gauge system and calculation methods. The calculation formulas in the Standard of Metro Gauges (CJJ 962003) were adjusted to be suitable for the 160km/h express project. The optimal structure gauges of the station, tunnel, and bridge were formulated in combination with the express project characteristics based on research on the basic gauge parameters. 1) Compared with the stopping condition, when the train passed the station at 100 km/h, the distance between the station platform and the central line of the track was 1,600 mm. 2) The size of the circular tunnel section was determined by the space requirement for equipment layout in the urban rail express project. When the flexible overhead contact system was used, the optimal tunnel diameter was 7.5 m (the gauge diameter was 7.2 m). When the rigid overhead contact system was used, the optimal tunnel diameter was 7.1 m (the gauge diameter was 6.8 m).
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |