收藏切换
Fast Protection and Fault Isolation Method for Load-Switch-Based Medium-Voltage Ring Networks in Urban Regional Railways
收藏切换
Chutian ZHANG
Urban Rapid Rail Transit | 2026, 39(2) : 135 - 145
Less
收藏切换
Urban Rapid Rail Transit | 2026, 39(2): 135-145
• Electrical and Mechanical Engineering •
Fast Protection and Fault Isolation Method for Load-Switch-Based Medium-Voltage Ring Networks in Urban Regional Railways
Full
Chutian ZHANG
Affiliations
  • China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063
doi: 10.3969/j.issn.1672-6073.2026.02.017
Outline
收藏切换

To address the problem of insufficient operating speed caused by step-by-step setting coordination in traditional definite-time overcurrent protection for load-switch-based medium-voltage ring networks in urban regional railways, this paper proposes a fast protection method based on differential current. The fault section is identified using the fault characteristics of differential current, and the fault information is transmitted to the master station via the GOOSE network. The master station then controls the tripping of the outgoing circuit breaker at the substation to achieve rapid fault clearance. At the same time, the outgoing current of the substation is monitored. When the outgoing current drops below the preset threshold, a command is sent via the GOOSE network to control the tripping of the load switches on both sides of the fault section, completing the fault isolation. After fault isolation, the circuit breaker at the substation outgoing line and normally open point are closed to restore power supply to the healthy area. Simulation results show that under different fault types, locations, and transition resistances, the proposed method can achieve rapid protection operation and effective fault isolation, significantly improving protection speed and providing a reliable guarantee for the safe and stable operation of the load-switch-based medium-voltage ring network in urban regional railway systems based on load switches.

urban regional railway  /  medium-voltage ring network  /  load switch  /  protection method  /  fault isolation
章楚添. 基于负荷开关的市域铁路中压环网快速保护与故障隔离方法. 都市快轨交通, 2026 , 39 (2) : 135 -145 . DOI: 10.3969/j.issn.1672-6073.2026.02.017
Chutian ZHANG. Fast Protection and Fault Isolation Method for Load-Switch-Based Medium-Voltage Ring Networks in Urban Regional Railways[J]. Urban Rapid Rail Transit, 2026 , 39 (2) : 135 -145 . DOI: 10.3969/j.issn.1672-6073.2026.02.017
Year 2026 volume 39 Issue 2
122
24
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2026.02.017
  • Receive Date:2025-05-15
  • Online Date:2026-09-20
Article Data
Affiliations
History
  • Received:2025-05-15
  • Revised:2026-01-08
Funding
Affiliations
    China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2026.02.017
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT