收藏切换
Metro Train Rescheduling Based on Earthquake Early Warning Information
收藏切换
Bin XIANG1, Zhaohui LI1, Kexin SHI2, Yicheng ZHOU2, Datian ZHOU3, Yihui WANG2
Urban Rapid Rail Transit | 2025, 38(6) : 125 - 131
Less
收藏切换
Urban Rapid Rail Transit | 2025, 38(6): 125-131
• Operation Management •
Metro Train Rescheduling Based on Earthquake Early Warning Information
Full
Bin XIANG1, Zhaohui LI1, Kexin SHI2, Yicheng ZHOU2, Datian ZHOU3, Yihui WANG2
Affiliations
  • 1.Kunming Metro Construction Management Co., Ltd., Kunming 650051
  • 2.School of Automation and Intelligence, Beijing Jiaotong University, Beijing 100044
  • 3.School of Electronc and Information Engineering, Beijing Jiaotong University, Beijing 100044
Published: 2025-12-10 doi: 10.3969/j.issn.1672-6073.2025.06.016
Outline
收藏切换

In response to seismic events that render certain metro sections impassable or subject to speed restrictions, this study proposes an optimization model for metro train emergency rescheduling based on Earthquake Early Warning (EEW) information. The model proactively adjusts existing train operation plans before the earthquake occurs, upon receiving EEW alerts. It incorporates constraints such as arrival and departure time constraints, headway constraints, rolling stock circulation constraints, and earthquake impact-related constraints. The objective function aims to minimize the deviation between actual and ideal train headways, the number of skipped station stops, and the time trains operate within hazardous zones after the earthquake. A linearization method is used to convert the model into a Mixed-Integer Linear Programming (MILP) formulation. To verify the effectiveness of the proposed model under various earthquake scenarios, a case study is conducted using actual operational data from Line 6 of the Kunming Metro on a typical working day. The results show that the model can generate emergency train rescheduling plans based on EEW information under different earthquake intensities and affected areas. Different rescheduling strategies are adopted depending on the location of the train at the time of receiving the EEW alert. When speed restrictions are imposed due to the earthquake, a greater increase in inter-station running time leads to a more significant impact on train operations.

urban rail transit  /  earthquake early warning  /  train emergency rescheduling  /  mixed-integer linear programming  /  optimization model
向滨, 李朝晖, 史可昕, 周奕成, 周达天, 王义惠. 基于地震预警信息的地铁列车应急调度. 都市快轨交通, 2025 , 38 (6) : 125 -131 . DOI: 10.3969/j.issn.1672-6073.2025.06.016
Bin XIANG, Zhaohui LI, Kexin SHI, Yicheng ZHOU, Datian ZHOU, Yihui WANG. Metro Train Rescheduling Based on Earthquake Early Warning Information[J]. Urban Rapid Rail Transit, 2025 , 38 (6) : 125 -131 . DOI: 10.3969/j.issn.1672-6073.2025.06.016
Year 2025 volume 38 Issue 6
82
16
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2025.06.016
  • Receive Date:2024-12-25
  • Online Date:2026-10-19
  • Published:2025-12-10
Article Data
Affiliations
History
  • Received:2024-12-25
  • Revised:2025-07-18
Funding
Affiliations
    1.Kunming Metro Construction Management Co., Ltd., Kunming 650051
    2.School of Automation and Intelligence, Beijing Jiaotong University, Beijing 100044
    3.School of Electronc and Information Engineering, Beijing Jiaotong University, Beijing 100044
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2025.06.016
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT