Comparative Study on Synchronous Close-Proximity Construction of a Shield Tunnel Underpassing a Ventilation Shaft
收藏切换
Yonghui HE1, Chunsen WANG1, Yusheng SHEN2
Urban Rapid Rail Transit | 2025, 38(5) : 93 - 102
Less
收藏切换
Urban Rapid Rail Transit | 2025, 38(5): 93-102
• Civil Engineering Technology •
Comparative Study on Synchronous Close-Proximity Construction of a Shield Tunnel Underpassing a Ventilation Shaft
Full
Yonghui HE1, Chunsen WANG1, Yusheng SHEN2
Affiliations
  • 1.Guangzhou Metro Design & Research Institute Co., Ltd., Dongguan, Guangdong 523123
  • 2.School of civil engineering, Southwest Jiaotong University, Chengdu 610031
Published: 2025-10-10 doi: 10.3969/j.issn.1672-6073.2025.05.012
Outline
收藏切换

To address the technical challenges of the synchronous close-proximity construction during the shield tunneling of Line 1 of the Dongguan Rail Transit in Guangdong Province, an analysis was conducted on the impact of the construction sequence of the shield tunnel and the intermediate ventilation shaft. A construction plan was proposed that would minimize impact and maximize economic benefits. Based on the actual site conditions, three construction plans were put forward: (1) involves constructing the ventilation shaft after the shield has passed through, (2) involves the shield passing through after the construction of the shaft's base slab is completed, (3) involves the shield passing through after the main construction of the shaft is completed. Through numerical simulation, the impact of different construction schemes on surface vertical displacement, wall-top horizontal displacement, wall-top vertical displacement, and support axial force was analyzed. From the perspective of impact and economic benefits, the optimal construction plan has been determined. Finally, the impact of the selected scheme and the reliability of numerical simulation were verified through field monitoring data. The research results indicate that the surface settlement and structural deformation are minimal after the main construction of the air shaft is completed and the shield machine passes through, although the construction period is longer. After the completion of the air shaft base slab construction, the construction period for the shield machine to pass through again and for the air shaft construction to be carried out after the shield machine passes through are similar, but the surface settlement and structural deformation are smaller after the shield machine passes through again following the completion of the air shaft base slab construction. This option also has higher economic benefits and is the preferred construction plan. The results of on-site monitoring indicate that all monitoring data are within the controlled range, the selected construction plan is safe and feasible, and the impact of construction is minimal. The measured data were in good agreement with the numerical results, validating the reliability of the theoretical conclusions. The findings provide valuable reference for similar engineering projects.

urban rail transit  /  shield tunnel  /  ventilation shaft  /  proximity construction  /  numerical simulation  /  field monitoring
何永辉, 王春森, 申玉生. 盾构隧道下穿风井同步近接施工对比研究. 都市快轨交通, 2025 , 38 (5) : 93 -102 . DOI: 10.3969/j.issn.1672-6073.2025.05.012
Yonghui HE, Chunsen WANG, Yusheng SHEN. Comparative Study on Synchronous Close-Proximity Construction of a Shield Tunnel Underpassing a Ventilation Shaft[J]. Urban Rapid Rail Transit, 2025 , 38 (5) : 93 -102 . DOI: 10.3969/j.issn.1672-6073.2025.05.012
Year 2025 volume 38 Issue 5
76
17
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2025.05.012
  • Receive Date:2025-01-02
  • Online Date:2026-10-19
  • Published:2025-10-10
Article Data
Affiliations
History
  • Received:2025-01-02
  • Revised:2025-04-17
Funding
Affiliations
    1.Guangzhou Metro Design & Research Institute Co., Ltd., Dongguan, Guangdong 523123
    2.School of civil engineering, Southwest Jiaotong University, Chengdu 610031
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2025.05.012
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT