收藏切换
Review and Outlook on the Renovation of Shanghai's Urban Rail Transit Operational Lines
收藏切换
PDF
Zhenbo WANG, Jing LU, Dongyan SHI
Urban Rapid Rail Transit | 2024, 37(1) : 22 - 27
Less
收藏切换
Urban Rapid Rail Transit | 2024, 37(1): 22-27
Upgrading of Existing Lines of Urban Rail Transit: A Featured Topic
Review and Outlook on the Renovation of Shanghai's Urban Rail Transit Operational Lines
Full
Zhenbo WANG, Jing LU, Dongyan SHI
Affiliations
  • Technical Center Shanghai Shentong Metro Group Co., Ltd. Shanghai 201103
doi: 10.3969/j.issn.1672-6073.2024.01.004
Outline
收藏切换

With the early opening of urban rail transit, Shanghai has been a forerunner in urban rail transit operatingline renovation in China. The experiences and lessons learned from Shanghai in operatingline renovations have reference value for other cities in China. First, the operatingline renovation process of the Shanghai urban rail transit was reviewed. Three main development trends indicate that the focus is on a gradual transition from individual conditions to overall conditions, that the renovation contents are gradually being diversified and systematized, and that the renovation demands that align with the development goals of the city and urban rail transit network are continuously deepening and expanding. Second, developing a renovation plan with systematic thinking, minimizing the impact on passengers while ensuring construction safety and quality during renovation, and active postevaluation after renovation are summarized as the key points in the operatingline renovation of Shanghai urban rail transit. The difficulties in operatingline renovation of Shanghai urban rail transit were analyzed in terms of limited financial support, highefficiency requirements for internal and external communication, challenges in project management, and insufficient technology. Important future works for operatingline renovations of Shanghai urban rail transit are discussed, including additional financing channels, research on improvement and innovation of construction plans and management mechanisms, deeper evaluation of the operational urban rail transit network, and the technology of nonclosure renovation of underground stations without prereserved conditions.

urban rail transit  /  operating-line renovation  /  renovation process  /  improving weaknesses  /  prospects
Zhenbo WANG, Jing LU, Dongyan SHI. Review and Outlook on the Renovation of Shanghai's Urban Rail Transit Operational Lines[J]. Urban Rapid Rail Transit, 2024 , 37 (1) : 22 -27 . DOI: 10.3969/j.issn.1672-6073.2024.01.004
Year 2024 volume 37 Issue 1
PDF
310
120
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1672-6073.2024.01.004
  • Receive Date:2023-07-31
  • Online Date:2025-07-09
Article Data
Affiliations
History
  • Received:2023-07-31
  • Revised:2023-10-20
Affiliations
    Technical Center Shanghai Shentong Metro Group Co., Ltd. Shanghai 201103
References
Share
https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2024.01.004
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT