In view of the underground powerhouse excavation work by blasting at the Baihetan Hydropower Station Project, in order to reduce the blasting-involved damage to the rock mass, numerical simulation and field test were carried out to analyze the influence of the initiation delay time and the distance between later detonated holes on the blasting and the cracking with time sequence controlled pre-splitting blasting, and the reasonable delay time and the optimum distance between post-detonated holes were obtained. The results show that when the hole diameter is 42 mm and the distance between the pre-detonated holes is 35 cm, the reasonable initiation delay time is 75~100 μs, and the optimum distance between the post-detonated holes is 70cm, with joint consideration of the blasting energy's utilization ratio and blasting effect. It is found that time sequence controlled pre-splitting blasting, used scientifically, is a safe and efficient method to excavate the rock mass close to the underground powerhouse wall, which can reduce the load of blasting, cut down on the explosives used, and limit the blasting-involved damage to rock mass.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |