收藏切换
Optimization Research of Air Decking Charge Structure for Bench Blasting based on JKSimBlast
收藏切换
PDF
Zhang-chao LI1, Shuai XU1, Jin-ping LI2, Xu-bo JI1, 3
Blasting | 2023, 40(1) : 50 - 56
Less
收藏切换
Blasting | 2023, 40(1): 50-56
BLASTING IN ORE AND ROCK
Optimization Research of Air Decking Charge Structure for Bench Blasting based on JKSimBlast
Full
Zhang-chao LI1, Shuai XU1, Jin-ping LI2, Xu-bo JI1, 3
Affiliations
  • 1.Key Laboratory of Ministry of Education for Safe Mining of Deep Metal Mines, Northeastern University, Shenyang 110819, China
  • 2.Jiuquan Iron and Steel Group Co., Ltd., Jingtieshan Mining Co., Ltd., Jiayuguan 735100, China
  • 3.Shandong Hengbang Smelting Co., Ltd., Yantai 264109, China
Published: 2023-03-01 doi: 10.3963/j.issn.1001-487X.2023.01.007
Outline
收藏切换

Since continuous charge structure is adopted in the bench blasting of Heigou open-pit mining area, the boulder yield is high and the secondary crushing workload is large, which seriously affects the operation efficiency of the mine's subsequent production and loading shovel loading process. In order to optimize the open-pit blasting charge structure, the 2DBench module for open-pit mining in the blasting simulation software JKSimBlast is used. Taking the length and the position of the commonly used air decking as the research objects and the boulder yield as the evaluation index, 25 groups of experiments with two factors and five levels are designed with the hole depth of 17.5 m and the charge length of 10 m. The simulation results show that with the same air deck length, the boulder yield decreases first and then increases with the deck position moving down, and thus there is an optimal deck position. With the same deck position, the boulder yield decreases first and then increases with the increase of the air deck length. Furthermore, the optimal air deck length is determined as 2 m and the optimal deck position is 11.5 m from the orifice. Finally, field industrial tests with the optimized structure are carried out in 5 different blasting areas. The blasting muck pile photos before and after optimization in area 3 is selected as the reference group. By comparison, the results show that the optimized charge structure reduces the boulder yield by an average of 9.24% and effectively improves the blasting effect, which provides a useful reference for the selection and optimization of the charge structure in open pit mines.

open blasting  /  JKSimBlast  /  optimization of charging parameters  /  boulder yield
Zhang-chao LI, Shuai XU, Jin-ping LI, Xu-bo JI. Optimization Research of Air Decking Charge Structure for Bench Blasting based on JKSimBlast[J]. Blasting, 2023 , 40 (1) : 50 -56 . DOI: 10.3963/j.issn.1001-487X.2023.01.007
Year 2023 volume 40 Issue 1
PDF
147
67
Cite this Article
BibTeX
Article Info
doi: 10.3963/j.issn.1001-487X.2023.01.007
  • Receive Date:2022-10-22
  • Online Date:2026-03-19
  • Published:2023-03-01
Article Data
Affiliations
History
  • Received:2022-10-22
Funding
Affiliations
    1.Key Laboratory of Ministry of Education for Safe Mining of Deep Metal Mines, Northeastern University, Shenyang 110819, China
    2.Jiuquan Iron and Steel Group Co., Ltd., Jingtieshan Mining Co., Ltd., Jiayuguan 735100, China
    3.Shandong Hengbang Smelting Co., Ltd., Yantai 264109, China
References
Share
https://castjournals.cast.org.cn/joweb/bp/EN/10.3963/j.issn.1001-487X.2023.01.007
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT