Blasting Vibration Control on Freshly Poured Concrete of Intake Tower of Diversion Tunnel at DBDP Hydropower Station
收藏切换
PDF
Hong-tao NI1, Yue-jun HUANG2, Zhen-fu ZHAO1, Xue-zhong HU1, Ming CHEN2
Blasting | 2025, 42(1) : 10 - 17
Less
收藏切换
Blasting | 2025, 42(1): 10-17
THEORETICAL AND TECHNOLOGICAL EXPLORATION
Blasting Vibration Control on Freshly Poured Concrete of Intake Tower of Diversion Tunnel at DBDP Hydropower Station
Full
Hong-tao NI1, Yue-jun HUANG2, Zhen-fu ZHAO1, Xue-zhong HU1, Ming CHEN2
Affiliations
  • 1.Sinohydro Bureau 11 Co., Ltd., Zhengzhou 450001, China
  • 2.State Key Laboratory of Water Resources Engineering and Management, Wuhan University, Wuhan 430072, China
Published: 2025-06-20 doi: 10.3963/j.issn.1001-487X.2025.01.002
Outline
收藏切换

The DBDP Hydropower Station, the largest hydropower station under construction in Pakistan, faces challenges related to blasting vibration affecting freshly poured concrete of the proposed intake tower of the diversion tunnel. Finite element calculation parameters were adjusted based on on-site blasting vibration monitoring data to address this issue. A numerical simulation method was utilized to analyze the blasting vibration response of the water intake tower under various blasting conditions and to identify factors influencing peak particle velocity (PPV). The study proposes measures to control blasting vibration. The results indicated that the maximum charge per delay, the delay time between blast holes, the advancing direction, and the detonation position significantly impact the intake tower's vibration. It is recommended that the maximum charge per delay and the delay time between blast holes be controlled to mitigate vibration on the fresh concrete. Additionally, adopting a backward blasting advancing direction and hole-bottom initiation is advisable.

DBDP hydropower station  /  intake tower  /  freshly poured concrete  /  blasting vibration  /  safety control measures
Hong-tao NI, Yue-jun HUANG, Zhen-fu ZHAO, Xue-zhong HU, Ming CHEN. Blasting Vibration Control on Freshly Poured Concrete of Intake Tower of Diversion Tunnel at DBDP Hydropower Station[J]. Blasting, 2025 , 42 (1) : 10 -17 . DOI: 10.3963/j.issn.1001-487X.2025.01.002
  • Chinese National Natural Science Foundation(51979205)
Year 2025 volume 42 Issue 1
PDF
115
55
Cite this Article
BibTeX
Article Info
doi: 10.3963/j.issn.1001-487X.2025.01.002
  • Receive Date:2024-04-10
  • Online Date:2026-03-18
  • Published:2025-06-20
Article Data
Affiliations
History
  • Received:2024-04-10
Funding
Chinese National Natural Science Foundation(51979205)
Affiliations
    1.Sinohydro Bureau 11 Co., Ltd., Zhengzhou 450001, China
    2.State Key Laboratory of Water Resources Engineering and Management, Wuhan University, Wuhan 430072, China

Corresponding:

HUANG Yue-jun(2000-), female, master degree candidate, mainly engaged in the research work on blasting vibration, (E-mail) .
References
Share
https://castjournals.cast.org.cn/joweb/bp/EN/10.3963/j.issn.1001-487X.2025.01.002
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数

Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)

Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT