The design budget estimate is the important basis for investment cost control of metallurgical engineering. In this paper, it is briefly introduced as well as it is analyzed the common problems in the process of preparing design budget estimate for metallurgical engineering such as investors do not pay enough attention to the preliminary design budget estimate, content provided by designer is incomplete and level of budget estimate preparers is insufficient. Moreover, the corresponding improvement suggestions and several countermeasures to improve preparation quality of budget estimate are given-select accurate prices of materials and equipment, implement strict review and approval process as well as carry out comparative analysis with the feasibility estimate to ensure the accuracy and completeness of budget estimate.
| 科 Family | 属数 Number of genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) | 属 Genus | 种数 Number of species | 占总种数比例 Percentage of total species (%) |
|---|---|---|---|---|---|---|
| 鹅膏菌科Amanitaceae | 2 | 11 | 5.26 | 鹅膏菌属 Amanita | 10 | 4.78 |
| 小菇科 Mycenaceae | 2 | 12 | 5.74 | 丝盖伞属 Inocybe | 5 | 2.39 |
| 多孔菌科 Polyporaceae | 8 | 14 | 6.70 | 蜡蘑属 Laccaria | 5 | 2.39 |
| 红菇科 Russulaceae | 3 | 23 | 11.00 | 小皮伞属 Marasmius | 6 | 2.87 |
| 小菇属 Mycena | 11 | 5.26 | ||||
| 光柄菇属 Pluteus | 5 | 2.39 | ||||
| 红菇属 Russula | 17 | 8.13 | ||||
| 栓菌属 Trametes | 5 | 2.39 |