Practice of Blast Furnace Restart after Unplanned Long-term Shutdown with Heavy Load in Ansteel
收藏切换
Xiang LI, Yuantong CHEN, Xingyu DUAN, Pan HU
Angang Technology | 2026, (4) : 58 - 62
Less
收藏切换
Angang Technology | 2026, (4): 58-62
• Production Practice •
Practice of Blast Furnace Restart after Unplanned Long-term Shutdown with Heavy Load in Ansteel
Full
Xiang LI, Yuantong CHEN, Xingyu DUAN, Pan HU
Affiliations
  • General Ironmaking Plant of Angang Steel Co., Ltd., Anshan 114021, Liaoning, China
doi: 10.3969/j.issn.1006-4613.2026.04.008
Outline
收藏切换

To achieve a smooth restart of the 2580 m³ blast furnace in General Ironmaking Plant of Angang Steel Co., Ltd. after unplanned long-term shutdown with heavy load for 31 days and 3 hours, a series of measures were implemented, including controlling temperature and cooling water in a staged and precise manner for furnace preservation, minimizing cooling water flow to the furnace body, adopting a concentrated and limited tuyere opening strategy during restart, setting key burden parameters with a total coke ratio of 1 000 kg/t and a final slag basicity of 1.0, and pre-injecting oxygen prior to blowing-in. The results showed that full tuyere opening was achieved 45 hours after restart, and the designed production capacity was reached within 5 days. The blast furnace productivity remained stable at 2.0 t/(m³·d), and the physical heat of hot metal exceeded 1 450 °C. Common issues encountered during hearth freezing treatment, such as tuyere slagging and damage were avoided, and the first iron tapping was accomplished smoothly. This practice provides a valuable reference for managing unplanned long-term shutdowns with heavy load and mitigating hearth freezing in blast furnaces.

blast furnace  /  unplanned shutdown  /  heavy load  /  hearth freezing  /  restart
李响, 陈原同, 段兴宇, 胡攀. 鞍钢高炉非计划长时间重负荷闷炉开炉实践. 鞍钢技术, 2026 , (4) : 58 -62 . DOI: 10.3969/j.issn.1006-4613.2026.04.008
Xiang LI, Yuantong CHEN, Xingyu DUAN, Pan HU. Practice of Blast Furnace Restart after Unplanned Long-term Shutdown with Heavy Load in Ansteel[J]. Angang Technology, 2026 , (4) : 58 -62 . DOI: 10.3969/j.issn.1006-4613.2026.04.008
Year 2026 volume Issue 4
198
33
Cite this Article
BibTeX
Article Info
doi: 10.3969/j.issn.1006-4613.2026.04.008
  • Online Date:2026-09-20
Article Data
Affiliations
History
  • Revised:2026-01-10
Affiliations
    General Ironmaking Plant of Angang Steel Co., Ltd., Anshan 114021, Liaoning, China
References
Share
https://castjournals.cast.org.cn/joweb/agjs/EN/10.3969/j.issn.1006-4613.2026.04.008
Share to
QR

Scan QR to access full text

Cite this article
BibTeX
Citations
表12种不同金属材料的力学参数
科
Family
属数
Number of
genus
种数
Number of
species
占总种数比例
Percentage of
total species (%)
属
Genus
种数
Number of
species
占总种数比例
Percentage of total
species (%)
鹅膏菌科Amanitaceae 2 11 5.26 鹅膏菌属 Amanita 10 4.78
小菇科 Mycenaceae 2 12 5.74 丝盖伞属 Inocybe 5 2.39
多孔菌科 Polyporaceae 8 14 6.70 蜡蘑属 Laccaria 5 2.39
红菇科 Russulaceae 3 23 11.00 小皮伞属 Marasmius 6 2.87
小菇属 Mycena 11 5.26
光柄菇属 Pluteus 5 2.39
红菇属 Russula 17 8.13
栓菌属 Trametes 5 2.39
关闭全屏
  • BibTeX
  • EndNote
  • RefWorks
  • TxT