Article(id=1222466553971467053, tenantId=1146029695717560320, journalId=1189982191388893191, issueId=1222466550314030044, articleNumber=null, orderNo=null, doi=10.16438/j.0513-4870.2018-1041, pmid=null, cstr=null, oa=null, hot=null, price=null, onlineType=0, articleFormat=0, articleType=null, articleTypeStr=research-article, receivedDate=1545235200000, receivedDateStr=2018-12-20, revisedDate=1545926400000, revisedDateStr=2018-12-28, acceptedDate=null, acceptedDateStr=null, onlineDate=1769388338796, onlineDateStr=2026-01-26, pubDate=1552320000000, pubDateStr=2019-03-12, doiRegisterDate=null, doiRegisterDateStr=null, onlineIssueDate=1769388338796, onlineIssueDateStr=2026-01-26, onlineJustAcceptDate=null, onlineJustAcceptDateStr=null, onlineFirstDate=null, onlineFirstDateStr=null, sourceXml=null, magXml=null, createTime=1769388338796, creator=13701087609, updateTime=1769388338796, updator=13701087609, issue=Issue{id=1222466550314030044, tenantId=1146029695717560320, journalId=1189982191388893191, year='2019', volume='54', issue='3', pageStart='393', pageEnd='586', issueExtLink='null', onlineDate='null', pubDate='1552320000000', pubDateStr='2019-03-12', beforeIssueId=null, nextIssueId=null, price=null, status=1, issueComplete=1, articleOrder=1, issueType=-1, specialIssue=null, createTime=1769388337923, creator='13701087609', updateTime=1769389281170, updator='13701087609', preIssue=null, nextIssue=null, articleTotal=null, ext={EN=IssueExt(id=1222470506633224654, tenantId=1146029695717560320, journalId=1189982191388893191, issueId=1222466550314030044, language=EN, specialIssueTitle=, coverIllustrator=null, specialIssueEditor=, specialIssueAbout=), CN=IssueExt(id=1222470506633224655, tenantId=1146029695717560320, journalId=1189982191388893191, issueId=1222466550314030044, language=CN, specialIssueTitle=, coverIllustrator=null, specialIssueEditor=, specialIssueAbout=)}, issueFiles=null, downloadFileDto=null}, startPage=555, endPage=564, ext={EN=ArticleExt(id=1222466554655138640, articleId=1222466553971467053, tenantId=1146029695717560320, journalId=1189982191388893191, language=EN, title=Liposomal melatonin dry powder inhalers for the treatment of primary lung cancer, columnId=1190335348761793317, journalTitle=Acta Pharmaceutica Sinica, columnName=Original Articles, runingTitle=null, highlight=null, articleAbstract=
Melatonin (MLT) is an endogenous chemical that has antitumor effects at high doses. However, it shows low oral bioavailability and short in vivo half-life, leading to drug resistance. Here, liposomal melatonin dry powder inhalers (LMD) were prepared, and were used for treatment of primary rat lung cancer by pulmonary delivery. Liposomal melatonin (LM) was prepared by the ethanol injection method to achieve an entrapment efficiency of 98.89%. LMD was obtained by freeze-drying after LM was mixed with mannitol. LMD appeared as spherical particles under a scanning electron microscope. The rehydrated liposomes had a small size of 65.15 nm and the zeta potential of -14.2 mV without change inentrapment efficiency. LMD had an aerodynamic particle size of 6.73 ±0.012 μm and a fine particle fraction (FPF < 8.06 μm) of 22.2%, suitable for pulmonary delivery. When administered with the same dose, LMD showed much higher inhibition on A549 lung cancer cells than MLT and gemcitabine. LMD of a large dose had no effect on the growth of normal lung epithelial cells (BEAS-2B). Rat lung cancer models were established after 45 days by instilling 3-methylcholanthrene (MCA) and N, N-dimethylnitrosamine (DEN) into the rat lungs once (the experiments had been approved by the ethics committee and carried out in accordance with relevant guidelines and regulations). Decreases of tumor nodules and inflammatory cells in the tumor-bearing rat lungs were observed after treatment of MLT, gemcitabine and LMD by pulmonary delivery compared with the models, wherein LMD was most effective. The efficiencies of inhibition of NF-κB p65, increase of Tunel detection (indicating enhancement of apoptosis), and decrease of malondialdehyde corresponded to LMD being most effective. Therefore, given the fact that LMD can deliver the drug into the tumor tissues of lungs, and it presents as a promising pulmonary inhalable regiment for treatment of lung cancer.
, authors=null, authorsList=Meng-meng ZHANG, Miao LI, Yuan-yuan GE, Tong-tong ZHANG, Yi-guang JIN, authorCompany=null, correspAuthors=Yi-guang JIN, authorNote=null, correspAuthorsNote=null, copyrightStatement=Copyright ©2019 Acta Pharmaceutica Sinica. All rights reserved., copyrightOwner=null, extLink=null, articleAbsUrl=null, sourceXml=null, magXml=null, pdfUrl=null, pdf=null, pdfFileSize=null, pdfExtLink=null, richHtmlUrl=null, mobilePdfUrl=null, reviewReport=null, pdfFirstPage=null, abstractGraph=null, abstractGraphContent=null, abstractVideo=null, citation=null, cebUrl=null, magXmlContent=null, mapNumber=null, fund=null), CN=ArticleExt(id=1222466557364658207, articleId=1222466553971467053, tenantId=1146029695717560320, journalId=1189982191388893191, language=CN, title=治疗原发性肺癌的美乐托宁脂质体粉雾剂研究, columnId=1190335348896011050, journalTitle=药学学报, columnName=研究论文, runingTitle=null, highlight=null, articleAbstract=
美乐托宁(melatonin,MLT)又称褪黑素,是人体内源性物质,大剂量给药时有抗肿瘤作用,但口服生物利用度低,体内半衰期短,成药性差。本文制备了美乐托宁脂质体粉雾剂(liposomal melatonin dry powder inhalers,LMD),经肺部给药治疗大鼠原发性肺癌。用乙醇注入法制备美乐托宁脂质体(liposomal melatonin,LM),包封率为98.9%,加入甘露醇冻干得到LMD,扫描电镜显示为类球形颗粒,加水复溶后粒径为65.15 nm,zeta电位为-14.2 mV。LMD的空气动力学粒径为6.73 μm,微细粒子比例(fine particle fraction,FPF < 8.06 μm)为22.2%,适合肺部给药。在相同药物浓度时,LMD对A549肺癌细胞抑制作用显著高于MLT原料和吉西他滨,因此脂质体增强了MLT药效。大剂量LMD不影响人正常支气管细胞(BEAS-2B)生长,安全性好。用3-甲基胆蒽及N,N-二甲基亚硝胺经气管喷入大鼠肺中,45天后得到原发性肺癌模型(动物实验经单位伦理委员会批准且实验均按照相关指导原则和规定进行)。将MLT、吉西他滨、LMD经气管喷入肺癌大鼠肺中,与模型组比较,治疗组均呈现明显少的肿瘤结节和炎性细胞数量,其中LMD的药效最强。治疗组NF-κB p65减少,以及Tunel检测表明细胞凋亡;丙二醛水平降低,其中LMD组的效果最强,与其他组有显著性差异。美乐托宁脂质体粉雾剂直接将药物递送至肺部肿瘤,是一种有前景的治疗肺癌的肺吸入给药剂型。
, authors=null, authorsList=张萌萌, 李淼, 葛媛媛, 张桐桐, 金义光, authorCompany=null, correspAuthors=金义光, authorNote=null, correspAuthorsNote=
, copyrightStatement=版权所有©《药学学报》编辑部2019, copyrightOwner=null, extLink=null, articleAbsUrl=null, sourceXml=nX5L5WVWh5wsD1nDmlKLpg==, magXml=HmWgFii0szYwHPc5igEk6A==, pdfUrl=null, pdf=OEIurWlMGK7rACJ4qpZFxw==, pdfFileSize=774227, pdfExtLink=null, richHtmlUrl=null, mobilePdfUrl=null, reviewReport=null, pdfFirstPage=null, abstractGraph=DsiLMkMZSPushPgr8iJqYQ==, abstractGraphContent=null, abstractVideo=null, citation=null, cebUrl=null, magXmlContent=3C/4Yyud2j4r40XB3XNI8w==, mapNumber=null, fund=null)}, authors=[Author(id=1222513645041472102, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1222513645267964550, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513645041472102, language=EN, stringName=Meng-meng ZHANG, firstName=Meng-meng, middleName=null, lastName=ZHANG, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 2, address=1. Pharmaceutical College of Henan University, Kaifeng 475004, China
2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1222513645406376595, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513645041472102, language=CN, stringName=张萌萌, firstName=萌萌, middleName=null, lastName=张, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 2, address=1.河南大学药学院, 河南 开封 475004
2.军事科学院军事医学研究院辐射医学研究所, 北京 100850, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1222513644571709992, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644588487211, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644571709992, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=1. Pharmaceutical College of Henan University, Kaifeng 475004, China), AuthorCompanyExt(id=1222513644596875821, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644571709992, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=1.河南大学药学院, 河南 开封 475004)]), AuthorCompany(id=1222513644701733440, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644714316354, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China), AuthorCompanyExt(id=1222513644718510659, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850)])]), Author(id=1222513645523817130, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, orderNo=1, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1222513645662229179, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513645523817130, language=EN, stringName=Miao LI, firstName=Miao, middleName=null, lastName=LI, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
2, address=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1222513645813224142, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513645523817130, language=CN, stringName=李淼, firstName=淼, middleName=null, lastName=李, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
2, address=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1222513644701733440, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644714316354, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China), AuthorCompanyExt(id=1222513644718510659, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850)])]), Author(id=1222513645943247585, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, orderNo=2, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1222513646098436852, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513645943247585, language=EN, stringName=Yuan-yuan GE, firstName=Yuan-yuan, middleName=null, lastName=GE, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
2, 3, address=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China
3. Anhui Medicine University, Hefei 230032, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1222513646220071679, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513645943247585, language=CN, stringName=葛媛媛, firstName=媛媛, middleName=null, lastName=葛, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
2, 3, address=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850
3.安徽医科大学, 安徽 合肥 230032, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1222513644701733440, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644714316354, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China), AuthorCompanyExt(id=1222513644718510659, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850)]), AuthorCompany(id=1222513644823368271, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644831756880, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3. Anhui Medicine University, Hefei 230032, China), AuthorCompanyExt(id=1222513644840145490, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3.安徽医科大学, 安徽 合肥 230032)])]), Author(id=1222513646358483725, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, orderNo=3, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1222513646492701472, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513646358483725, language=EN, stringName=Tong-tong ZHANG, firstName=Tong-tong, middleName=null, lastName=ZHANG, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
2, 3, address=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China
3. Anhui Medicine University, Hefei 230032, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1222513646610142003, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513646358483725, language=CN, stringName=张桐桐, firstName=桐桐, middleName=null, lastName=张, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
2, 3, address=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850
3.安徽医科大学, 安徽 合肥 230032, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1222513644701733440, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644714316354, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China), AuthorCompanyExt(id=1222513644718510659, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850)]), AuthorCompany(id=1222513644823368271, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644831756880, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3. Anhui Medicine University, Hefei 230032, China), AuthorCompanyExt(id=1222513644840145490, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3.安徽医科大学, 安徽 合肥 230032)])]), Author(id=1222513646714999618, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, orderNo=4, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=jinyg@sina.com, emailSecond=null, emailThird=null, correspondingAuthor=1, authorType=1, ext={EN=AuthorExt(id=1222513646878577498, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513646714999618, language=EN, stringName=Yi-guang JIN, firstName=Yi-guang, middleName=null, lastName=JIN, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 2, 3, *, address=1. Pharmaceutical College of Henan University, Kaifeng 475004, China
2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China
3. Anhui Medicine University, Hefei 230032, China, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1222513647084098411, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, authorId=1222513646714999618, language=CN, stringName=金义光, firstName=义光, middleName=null, lastName=金, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 2, 3, *, address=1.河南大学药学院, 河南 开封 475004
2.军事科学院军事医学研究院辐射医学研究所, 北京 100850
3.安徽医科大学, 安徽 合肥 230032, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1222513644571709992, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644588487211, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644571709992, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=1. Pharmaceutical College of Henan University, Kaifeng 475004, China), AuthorCompanyExt(id=1222513644596875821, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644571709992, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=1.河南大学药学院, 河南 开封 475004)]), AuthorCompany(id=1222513644701733440, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644714316354, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China), AuthorCompanyExt(id=1222513644718510659, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850)]), AuthorCompany(id=1222513644823368271, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644831756880, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3. Anhui Medicine University, Hefei 230032, China), AuthorCompanyExt(id=1222513644840145490, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3.安徽医科大学, 安徽 合肥 230032)])])], keywords=[Keyword(id=1222513647516111761, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, orderNo=1, keyword=melatonin), Keyword(id=1222513647662912416, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, orderNo=2, keyword=liposome), Keyword(id=1222513647788741551, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, orderNo=3, keyword=dry powder inhaler), Keyword(id=1222513647960708031, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, orderNo=4, keyword=lung neoplasm), Keyword(id=1222513648078148556, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, orderNo=5, keyword=gemcitabine), Keyword(id=1222513648237532126, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, orderNo=1, keyword=美乐托宁), Keyword(id=1222513648371749872, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, orderNo=2, keyword=脂质体), Keyword(id=1222513648501773313, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, orderNo=3, keyword=粉雾剂), Keyword(id=1222513648602435592, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, orderNo=4, keyword=肺癌), Keyword(id=1222513648728264726, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, orderNo=5, keyword=吉西他滨)], refs=[Reference(id=1222513653568491934, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.canlet.2014.07.047, pmid=null, pmcid=null, year=2014, volume=353, issue=null, pageStart=145, pageEnd=152, url=null, language=null, rfNumber=[1], rfOrder=0, authorNames=Liu RW, Wei S, Chen J, journalName=Cancer Lett, refType=null, unstructuredReference=
Liu RW ,
Wei S ,
Chen J et al . Mesenchymal stem cells in lung cancer tumor microenvironment:their biological properties, influence on tumor growth and therapeutic implications[J].
Cancer Lett,
2014,
353: 145-152., articleTitle=Mesenchymal stem cells in lung cancer tumor microenvironment:their biological properties, influence on tumor growth and therapeutic implications, refAbstract=null), Reference(id=1222513653681738154, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1371/journal.pone.0184412, pmid=null, pmcid=null, year=2017, volume=12, issue=null, pageStart=e0184412, pageEnd=null, url=null, language=null, rfNumber=[2], rfOrder=1, authorNames=Jin J, Hu KJ, Zhou YZ, journalName=PLoS One, refType=null, unstructuredReference=
Jin J ,
Hu KJ ,
Zhou YZ et al . Clinical utility of the modified glasgow prognostic score in lung cancer:a meta analysis[J].
PLoS One,
2017,
12: e0184412., articleTitle=Clinical utility of the modified glasgow prognostic score in lung cancer:a meta analysis, refAbstract=null), Reference(id=1222513653786595760, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1111/jpi.2012.53.issue-4, pmid=null, pmcid=null, year=2012, volume=53, issue=null, pageStart=335, pageEnd=343, url=null, language=null, rfNumber=[3], rfOrder=2, authorNames=Song N, Kim AJ, Kim HJ, journalName=J Pineal Res, refType=null, unstructuredReference=
Song N ,
Kim AJ ,
Kim HJ et al . Melatonin suppresses doxorubicin-induced premature senescence of A549 lung cancer cells by ameliorating mitochondrial dysfunction[J].
J Pineal Res,
2012,
53: 335-343., articleTitle=Melatonin suppresses doxorubicin-induced premature senescence of A549 lung cancer cells by ameliorating mitochondrial dysfunction, refAbstract=null), Reference(id=1222513653933396411, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=null, pmid=null, pmcid=null, year=2016, volume=7, issue=null, pageStart=46768, pageEnd=46784, url=http://cn.bing.com/academic/profile?id=cfa4a07fcf870dc7e8ae600cb971b71f&encoded=0&v=paper_preview&mkt=zh-cn, language=null, rfNumber=[4], rfOrder=3, authorNames=Ma ZQ, Yang Y, Fan CX, journalName=Oncotarget, refType=null, unstructuredReference=
Ma ZQ ,
Yang Y ,
Fan CX et al . Melatonin as a potential anticarcinogen for non-small-cell lung cancer[J].
Oncotarget,
2016,
7: 46768-46784., articleTitle=Melatonin as a potential anticarcinogen for non-small-cell lung cancer, refAbstract=null), Reference(id=1222513654059225536, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.3390/ijms19072033, pmid=null, pmcid=null, year=2018, volume=19, issue=null, pageStart=2033, pageEnd=null, url=null, language=null, rfNumber=[5], rfOrder=4, authorNames=Majka J, Wierdak M, Brzozowska I, journalName=Int J Mol Sci, refType=null, unstructuredReference=
Majka J ,
Wierdak M ,
Brzozowska I et al . Melatonin in prevention of the sequence from reflux esophagitis to barrett's esophagus and esophageal adenocarcinoma:experimental and clinical perspectives[J].
Int J Mol Sci,
2018,
19: 2033., articleTitle=Melatonin in prevention of the sequence from reflux esophagitis to barrett's esophagus and esophageal adenocarcinoma:experimental and clinical perspectives, refAbstract=null), Reference(id=1222513654168277446, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.jconrel.2015.07.024, pmid=null, pmcid=null, year=2015, volume=219, issue=null, pageStart=500, pageEnd=518, url=null, language=null, rfNumber=[6], rfOrder=5, authorNames=Kuzmov A, Minko T, journalName=J Control Release, refType=null, unstructuredReference=
Kuzmov A ,
Minko T . Nanotechnology approaches for inhalation treatment of lung diseases[J].
J Control Release,
2015,
219: 500-518., articleTitle=Nanotechnology approaches for inhalation treatment of lung diseases, refAbstract=null), Reference(id=1222513654285717970, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.ijpharm.2018.08.031, pmid=null, pmcid=null, year=2018, volume=550, issue=null, pageStart=114, pageEnd=122, url=null, language=null, rfNumber=[7], rfOrder=6, authorNames=Sørli JB, Sivars KB, Da Silva E, journalName=Int J Pharm, refType=null, unstructuredReference=
Sørli JB ,
Sivars KB ,
Da Silva E et al . Bile salt enhancers for inhalation:correlation between in vitro and in vivo lung effects[J].
Int J Pharm,
2018,
550: 114-122., articleTitle=Bile salt enhancers for inhalation:correlation between in vitro and in vivo lung effects, refAbstract=null), Reference(id=1222513654407352795, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.apsb.2016.09.006, pmid=null, pmcid=null, year=2017, volume=7, issue=null, pageStart=80, pageEnd=90, url=null, language=null, rfNumber=[8], rfOrder=7, authorNames=Zhu L, Li M, Liu X, journalName=Acta Pharm Sin B, refType=null, unstructuredReference=
Zhu L ,
Li M ,
Liu X et al . Inhalable oridonin-loaded poly(lactic-
co-glycolic)acid large porous microparticles for
in situ treatment of primary non-small cell lung cancer[J].
Acta Pharm Sin B,
2017,
7: 80-90., articleTitle=Inhalable oridonin-loaded poly(lactic-
co-glycolic)acid large porous microparticles for
in situ treatment of primary non-small cell lung cancer, refAbstract=null), Reference(id=1222513654528987623, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.apsb.2018.03.004, pmid=null, pmcid=null, year=2018, volume=8, issue=null, pageStart=440, pageEnd=448, url=null, language=null, rfNumber=[9], rfOrder=8, authorNames=Zhang T, Chen Y, Ge Y, journalName=Acta Pharm Sin B, refType=null, unstructuredReference=
Zhang T ,
Chen Y ,
Ge Y et al . Inhalation treatment of primary lung cancer using liposomal curcumin dry powder inhalers[J].
Acta Pharm Sin B,
2018,
8: 440-448., articleTitle=Inhalation treatment of primary lung cancer using liposomal curcumin dry powder inhalers, refAbstract=null), Reference(id=1222513654638039532, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=null, pmid=null, pmcid=null, year=2013, volume=37, issue=null, pageStart=692, pageEnd=695, url=http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=jsyxkxyyk201309013, language=null, rfNumber=[10], rfOrder=9, authorNames=Zhang J, Li Y, Xiang ML, journalName=Mil Med Sci (军事医学), refType=null, unstructuredReference=
Zhang J ,
Li Y ,
Xiang ML et al . Preparation and pharmacodynamic study of curcumin liposome dry powder inhalation[J].
Mil Med Sci (军事医学),
2013,
37: 692-695., articleTitle=Preparation and pharmacodynamic study of curcumin liposome dry powder inhalation, refAbstract=null), Reference(id=1222513654747091446, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.apsb.2016.07.009, pmid=null, pmcid=null, year=2016, volume=6, issue=null, pageStart=460, pageEnd=467, url=null, language=null, rfNumber=[11], rfOrder=10, authorNames=Shen H, Wang LF, Chen WQ, journalName=Acta Pharm Sin B, refType=null, unstructuredReference=
Shen H ,
Wang LF ,
Chen WQ et al . Tissue distribution and tumor uptake of folate receptor-targete depothilone folate conjugate, BMS-753493, in CD2F1 mice after systemic administration[J].
Acta Pharm Sin B,
2016,
6: 460-467., articleTitle=Tissue distribution and tumor uptake of folate receptor-targete depothilone folate conjugate, BMS-753493, in CD2F1 mice after systemic administration, refAbstract=null), Reference(id=1222513654864531965, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.ijpharm.2010.03.017, pmid=null, pmcid=null, year=2010, volume=392, issue=null, pageStart=1, pageEnd=19, url=null, language=null, rfNumber=[12], rfOrder=11, authorNames=Pilcer G, Amighi K, journalName=Int J Pharm, refType=null, unstructuredReference=
Pilcer G ,
Amighi K . Formulation strategy and use of excipients in pulmonary drug delivery[J].
Int J Pharm,
2010,
392: 1-19., articleTitle=Formulation strategy and use of excipients in pulmonary drug delivery, refAbstract=null), Reference(id=1222513654956806660, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=null, pmid=null, pmcid=null, year=2016, volume=51, issue=null, pageStart=1906, pageEnd=1912, url=http://www.yxxb.com.cn:8081/aps/CN/abstract/abstract16508.shtml, language=null, rfNumber=[13], rfOrder=12, authorNames=Hu YZ, Li M, Zhang TT, journalName=Acta Pharm Sin (药学学报), refType=null, unstructuredReference=
Hu YZ ,
Li M ,
Zhang TT et al . Preparation of liposomal artesunate dry powder inhalers and the effect on the acute lung injury of rats[J].
Acta Pharm Sin (药学学报),
2016,
51: 1906-1912., articleTitle=Preparation of liposomal artesunate dry powder inhalers and the effect on the acute lung injury of rats, refAbstract=null), Reference(id=1222513655061664270, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1023/A:1018910200420, pmid=null, pmcid=null, year=1999, volume=16, issue=null, pageStart=1735, pageEnd=1742, url=null, language=null, rfNumber=[14], rfOrder=13, authorNames=Vanbever R, Mintzes JD, Wang J, journalName=Pharm Res, refType=null, unstructuredReference=
Vanbever R ,
Mintzes JD ,
Wang J et al . Formulation and physical characterization of large porous particles for inhalation[J].
Pharm Res,
1999,
16: 1735-1742., articleTitle=Formulation and physical characterization of large porous particles for inhalation, refAbstract=null), Reference(id=1222513655183299095, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.ijpharm.2013.02.031, pmid=null, pmcid=null, year=2013, volume=447, issue=null, pageStart=251, pageEnd=280, url=null, language=null, rfNumber=[15], rfOrder=14, authorNames=Depreter F, Pilcer G, Amighi K, journalName=Int J Pharm, refType=null, unstructuredReference=
Depreter F ,
Pilcer G ,
Amighi K . Inhaled proteins:challenges and perspectives[J].
Int J Pharm,
2013,
447: 251-280., articleTitle=Inhaled proteins:challenges and perspectives, refAbstract=null), Reference(id=1222513655300739613, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1002/jps.10352, pmid=null, pmcid=null, year=2003, volume=92, issue=null, pageStart=900, pageEnd=910, url=null, language=null, rfNumber=[16], rfOrder=15, authorNames=Elversson J, Millqvist-Fureby A, Alderborn G, journalName=J Pharm Sci, refType=null, unstructuredReference=
Elversson J ,
Millqvist-Fureby A ,
Alderborn G et al . Droplet and particle size relationship and shell thickness of inhalable lactose particles during spray drying[J].
J Pharm Sci,
2003,
92: 900-910., articleTitle=Droplet and particle size relationship and shell thickness of inhalable lactose particles during spray drying, refAbstract=null), Reference(id=1222513655460123177, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.jenvrad.2007.08.009, pmid=null, pmcid=null, year=2008, volume=99, issue=null, pageStart=527, pageEnd=538, url=null, language=null, rfNumber=[17], rfOrder=16, authorNames=Sdraulig S, Franich R, Tinker RA, journalName=J Environ Radioact, refType=null, unstructuredReference=
Sdraulig S ,
Franich R ,
Tinker RA et al .
In vitro dissolution studies of uranium bearing material in simulated lung fluid[J].
J Environ Radioact,
2008,
99: 527-538., articleTitle=
In vitro dissolution studies of uranium bearing material in simulated lung fluid, refAbstract=null), Reference(id=1222513655590146607, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1080/10717544.2018.1444684, pmid=null, pmcid=null, year=2018, volume=25, issue=null, pageStart=690, pageEnd=702, url=null, language=null, rfNumber=[18], rfOrder=17, authorNames=Zhang L, Chen F, Zheng JT, journalName=Drug Deliv, refType=null, unstructuredReference=
Zhang L ,
Chen F ,
Zheng JT et al . Chitosan-based liposomal thermogels for the controlled delivery of pingyangmycin:design, optimization and
in vitro and
in vivo studies[J].
Drug Deliv,
2018,
25: 690-702., articleTitle=Chitosan-based liposomal thermogels for the controlled delivery of pingyangmycin:design, optimization and
in vitro and
in vivo studies, refAbstract=null), Reference(id=1222513655703392821, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1039/C3SM52064A, pmid=null, pmcid=null, year=2014, volume=10, issue=null, pageStart=206, pageEnd=213, url=null, language=null, rfNumber=[19], rfOrder=18, authorNames=Choi Y, Attwood SJ, Hoopes MI, journalName=Soft Matter, refType=null, unstructuredReference=
Choi Y ,
Attwood SJ ,
Hoopes MI et al . Melatonin directly interacts with cholesterol and alleviates cholesterol effects in dipalmitoylphosphatidylcholine monolayers[J].
Soft Matter,
2014,
10: 206-213., articleTitle=Melatonin directly interacts with cholesterol and alleviates cholesterol effects in dipalmitoylphosphatidylcholine monolayers, refAbstract=null), Reference(id=1222513655795667514, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.tiv.2016.09.003, pmid=null, pmcid=null, year=2016, volume=37, issue=null, pageStart=41, pageEnd=49, url=null, language=null, rfNumber=[20], rfOrder=19, authorNames=Choo WH, Park CH, Jung SE, journalName=Toxicol In Vitro, refType=null, unstructuredReference=
Choo WH ,
Park CH ,
Jung SE et al . Long-term exposures to low doses of silver nanoparticles enhanced
in vitro malignant cell transformation in non-tumorigenic BEAS-2B cells[J].
Toxicol In Vitro,
2016,
37: 41-49., articleTitle=Long-term exposures to low doses of silver nanoparticles enhanced
in vitro malignant cell transformation in non-tumorigenic BEAS-2B cells, refAbstract=null), Reference(id=1222513655900525124, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.apsb.2018.01.004, pmid=null, pmcid=null, year=2018, volume=8, issue=null, pageStart=261, pageEnd=271, url=null, language=null, rfNumber=[21], rfOrder=20, authorNames=Dai T, Jiang K, Lu W, journalName=Acta Pharma Sin B, refType=null, unstructuredReference=
Dai T ,
Jiang K ,
Lu W . Liposomes and lipid disks traverse the BBB and BBTB as intact forms as revealed by two-step Förster resonance energy transfer imaging[J].
Acta Pharma Sin B,
2018,
8: 261-271., articleTitle=Liposomes and lipid disks traverse the BBB and BBTB as intact forms as revealed by two-step Förster resonance energy transfer imaging, refAbstract=null), Reference(id=1222513656013771335, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.7314/APJCP.2015.16.14.5963, pmid=null, pmcid=null, year=2015, volume=16, issue=null, pageStart=5963, pageEnd=5966, url=null, language=null, rfNumber=[22], rfOrder=21, authorNames=Yang S, journalName=Asian Pac J Cancer Prev, refType=null, unstructuredReference=
Yang S . A pooled study on combination of gemcitabine and nedaplatin for treating patients with non-small cell lung cancer[J].
Asian Pac J Cancer Prev,
2015,
16: 5963-5966., articleTitle=A pooled study on combination of gemcitabine and nedaplatin for treating patients with non-small cell lung cancer, refAbstract=null), Reference(id=1222513656110240335, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1371/journal.pone.0101132, pmid=null, pmcid=null, year=2014, volume=9, issue=null, pageStart=e101132, pageEnd=null, url=null, language=null, rfNumber=[23], rfOrder=22, authorNames=Zhou QY, Gui SY, Zhou Q, journalName=PLoS One, refType=null, unstructuredReference=
Zhou QY ,
Gui SY ,
Zhou Q et al . Melatonin inhibits the migration of human lung adenocarcinoma A549 cell lines involving JNK/MAPK pathway[J].
PLoS One,
2014,
9: e101132., articleTitle=Melatonin inhibits the migration of human lung adenocarcinoma A549 cell lines involving JNK/MAPK pathway, refAbstract=null), Reference(id=1222513656236069463, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.tiv.2016.08.002, pmid=null, pmcid=null, year=2016, volume=36, issue=null, pageStart=164, pageEnd=171, url=null, language=null, rfNumber=[24], rfOrder=23, authorNames=Roursgaard M, Knudsen KB, Northeved H, journalName=Toxicol In Vitro, refType=null, unstructuredReference=
Roursgaard M ,
Knudsen KB ,
Northeved H et al .
In vitro toxicity of cationic micelles and liposomes in cultured human hepatocyte (HepG2) and lung epithelial (A549) cell lines[J].
Toxicol In Vitro,
2016,
36: 164-171., articleTitle=
In vitro toxicity of cationic micelles and liposomes in cultured human hepatocyte (HepG2) and lung epithelial (A549) cell lines, refAbstract=null), Reference(id=1222513656357704280, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1111/jpi.2013.54.issue-3, pmid=null, pmcid=null, year=2013, volume=54, issue=null, pageStart=264, pageEnd=270, url=null, language=null, rfNumber=[25], rfOrder=24, authorNames=Kim KJ, Choi JS, Kang I, journalName=J Pineal Res, refType=null, unstructuredReference=
Kim KJ ,
Choi JS ,
Kang I et al . Melatonin suppresses tumor progression by reducing angiogenesis stimulated by HIF-1 in a mouse tumor model[J].
J Pineal Res,
2013,
54: 264-270., articleTitle=Melatonin suppresses tumor progression by reducing angiogenesis stimulated by HIF-1 in a mouse tumor model, refAbstract=null), Reference(id=1222513656475144797, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.taap.2017.09.022, pmid=null, pmcid=null, year=2017, volume=335, issue=null, pageStart=56, pageEnd=63, url=null, language=null, rfNumber=[26], rfOrder=25, authorNames=Goradel NH, Asghari MH, Moloudizargari M, journalName=Toxicol Appl Pharmacol, refType=null, unstructuredReference=
Goradel NH ,
Asghari MH ,
Moloudizargari M et al . Melatonin as an angiogenesis inhibitor to combat cancer:mechanistic evidence[J].
Toxicol Appl Pharmacol,
2017,
335: 56-63., articleTitle=Melatonin as an angiogenesis inhibitor to combat cancer:mechanistic evidence, refAbstract=null), Reference(id=1222513656559030881, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1016/j.bbabio.2006.03.012, pmid=null, pmcid=null, year=2006, volume=1757, issue=null, pageStart=573, pageEnd=589, url=null, language=null, rfNumber=[27], rfOrder=26, authorNames=Anisimov VN, Popovich IG, Zabezhinski MA, journalName=Biochim Biophys Acta, refType=null, unstructuredReference=
Anisimov VN ,
Popovich IG ,
Zabezhinski MA et al . Melatonin as antioxidant, geroprotector and anticarcinogen[J].
Biochim Biophys Acta,
2006,
1757: 573-589., articleTitle=Melatonin as antioxidant, geroprotector and anticarcinogen, refAbstract=null), Reference(id=1222513656659694183, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=null, pmid=null, pmcid=null, year=2017, volume=2017, issue=null, pageStart=8494107, pageEnd=null, url=http://cn.bing.com/academic/profile?id=82fa5aa445fa854b9e88595149c8b7b3&encoded=0&v=paper_preview&mkt=zh-cn, language=null, rfNumber=[28], rfOrder=27, authorNames=Szewczyk-Golec K, Rajewski P, Gackowski M, journalName=Oxidat Med Cell Longev, refType=null, unstructuredReference=
Szewczyk-Golec K ,
Rajewski P ,
Gackowski M et al . Melatonin supplementation lowers oxidative stress and regulates adipokines in obese patients on a calorie-restricted diet[J].
Oxidat Med Cell Longev,
2017,
2017: 8494107., articleTitle=Melatonin supplementation lowers oxidative stress and regulates adipokines in obese patients on a calorie-restricted diet, refAbstract=null), Reference(id=1222513656760357486, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=null, pmid=null, pmcid=null, year=2017, volume=17, issue=null, pageStart=467, pageEnd=488, url=http://d.old.wanfangdata.com.cn/NSTLQK/NSTL_QKJJ0225757310/, language=null, rfNumber=[29], rfOrder=28, authorNames=Habtemariam S, Daglia M, Sureda A, journalName=Curr Top Med Chem, refType=null, unstructuredReference=
Habtemariam S ,
Daglia M ,
Sureda A et al . Melatonin and respiratory diseases:a review[J].
Curr Top Med Chem,
2017,
17: 467-488., articleTitle=Melatonin and respiratory diseases:a review, refAbstract=null), Reference(id=1222513656856826479, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=null, pmid=null, pmcid=null, year=2016, volume=7, issue=null, pageStart=2985, pageEnd=3001, url=null, language=null, rfNumber=[30], rfOrder=29, authorNames=Lu JJ, Fu LY, Tang ZP, journalName=Oncotarget, refType=null, unstructuredReference=
Lu JJ ,
Fu LY ,
Tang ZP et al . Melatonin inhibits AP-2
β/hTERT, NF-
κB/COX-2 and Akt/ERK and activates caspase/Cyto C signaling to enhance the antitumor activity of berberine in lung cancer cells[J].
Oncotarget,
2016,
7: 2985-3001., articleTitle=Melatonin inhibits AP-2
β/hTERT, NF-
κB/COX-2 and Akt/ERK and activates caspase/Cyto C signaling to enhance the antitumor activity of berberine in lung cancer cells, refAbstract=null), Reference(id=1222513656957489781, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1124/jpet.110.173146, pmid=null, pmcid=null, year=2010, volume=335, issue=null, pageStart=830, pageEnd=840, url=null, language=null, rfNumber=[31], rfOrder=30, authorNames=Tsai M, Kuo Y, Chiu Y, journalName=J Pharmacol Exp Ther, refType=null, unstructuredReference=
Tsai M ,
Kuo Y ,
Chiu Y et al . Down-regulation of rad51 expression overcomes drug resistance to gemcitabine in human non-small-cell lung cancer cells[J].
J Pharmacol Exp Ther,
2010,
335: 830-840., articleTitle=Down-regulation of rad51 expression overcomes drug resistance to gemcitabine in human non-small-cell lung cancer cells, refAbstract=null), Reference(id=1222513657049764475, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, doi=10.1111/jpi.12270, pmid=null, pmcid=null, year=2016, volume=60, issue=null, pageStart=3, pageEnd=15, url=null, language=null, rfNumber=[32], rfOrder=31, authorNames=Borin TF, Arbab AS, Gelaleti GB, journalName=J Pineal Res, refType=null, unstructuredReference=
Borin TF ,
Arbab AS ,
Gelaleti GB et al . Melatonin decreases breast cancer metastasis by modulating Rho-associated kinase protein-1 expression[J].
J Pineal Res,
2016,
60: 3-15., articleTitle=Melatonin decreases breast cancer metastasis by modulating Rho-associated kinase protein-1 expression, refAbstract=null)], funds=[Fund(id=1222513653266502023, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, awardId=81803453, language=CN, fundingSource=国家自然科学基金资助项目(81803453), fundOrder=null, country=null)], companyList=[AuthorCompany(id=1222513644571709992, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644588487211, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644571709992, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=1. Pharmaceutical College of Henan University, Kaifeng 475004, China), AuthorCompanyExt(id=1222513644596875821, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644571709992, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=1.河南大学药学院, 河南 开封 475004)]), AuthorCompany(id=1222513644701733440, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644714316354, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2. Department of Pharmaceutical Sciences, Beijing Institute of Radiation Medicine, Beijing 100850, China), AuthorCompanyExt(id=1222513644718510659, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644701733440, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=2.军事科学院军事医学研究院辐射医学研究所, 北京 100850)]), AuthorCompany(id=1222513644823368271, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, xref=null, ext=[AuthorCompanyExt(id=1222513644831756880, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3. Anhui Medicine University, Hefei 230032, China), AuthorCompanyExt(id=1222513644840145490, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, companyId=1222513644823368271, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=3.安徽医科大学, 安徽 合肥 230032)])], figs=[ArticleFig(id=1222513648967340081, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=BsonhcOrT8vF7/LqU99+4w==, figureFileBig=XEKw/pTJ4b7kGS8aQx3bUg==, tableContent=null), ArticleFig(id=1222513649076391997, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 1, caption=
Scanning electron microscopic (SEM) images of MLT powders and liposomal melatonin dry powder inhalers (LMD) , figureFileSmall=BsonhcOrT8vF7/LqU99+4w==, figureFileBig=XEKw/pTJ4b7kGS8aQx3bUg==, tableContent=null), ArticleFig(id=1222513649269330002, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=ldAYL2fjloeNTYo6e2paOw==, figureFileBig=GYEWfjwflDpaT3fijYcOmQ==, tableContent=null), ArticleFig(id=1222513649462268007, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 2, caption=
Transmission electron microscopic (TEM) images of reconstitution of LMD in phosphate buffered solutions (PBS) (A), and their particle size distribution (B), and zeta potential (C) , figureFileSmall=ldAYL2fjloeNTYo6e2paOw==, figureFileBig=GYEWfjwflDpaT3fijYcOmQ==, tableContent=null), ArticleFig(id=1222513649604874363, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=WaT+ObVybwT6nbbwILmjTQ==, figureFileBig=v511vBK2z6fGx4UGTA/KyQ==, tableContent=null), ArticleFig(id=1222513649730703495, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 3, caption=
Simulated drug lung deposition of MLT powders and LMD in the different compartments of next generation impactor (NGI). n = 4, $\bar{x}\pm s$ , figureFileSmall=WaT+ObVybwT6nbbwILmjTQ==, figureFileBig=v511vBK2z6fGx4UGTA/KyQ==, tableContent=null), ArticleFig(id=1222513649911058577, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=tWRv1puyDwEiwRiGPJnzyQ==, figureFileBig=4WGdmqWoqlfR9aD+nJOuaA==, tableContent=null), ArticleFig(id=1222513650083025052, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 4, caption=
Release of MLT from the MLT powders and LMD in the simulated lung fluids. n = 4, $\bar{x}\pm s$ , figureFileSmall=tWRv1puyDwEiwRiGPJnzyQ==, figureFileBig=4WGdmqWoqlfR9aD+nJOuaA==, tableContent=null), ArticleFig(id=1222513650238214310, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=R61O0id6NtOuz9Puz9XAoQ==, figureFileBig=evM7NFrRZfS9TMyG25Yg4w==, tableContent=null), ArticleFig(id=1222513650389209265, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 5, caption=
Cytotoxicity of MLT, LMD and gemcitabine on BEAS-2B cells depending on concentrations (A) and at 2.5 mmol·L-1 (B), and A549 cells depending on concentrations (C) and at 5 mmol·L-1 (D). n = 4, $\bar{x}\pm s$.**P < 0.01 vs MLT or gemcitabine; # #P < 0.01 vs MLT or LMD , figureFileSmall=R61O0id6NtOuz9Puz9XAoQ==, figureFileBig=evM7NFrRZfS9TMyG25Yg4w==, tableContent=null), ArticleFig(id=1222513650515038399, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=4iKssko/gyGZAg4HWfUBzg==, figureFileBig=GBI0GTCF3muLvgTePKHP/A==, tableContent=null), ArticleFig(id=1222513650930274522, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 6, caption=
Flow cytometric graphs of A549 cells after treatment with MLT and LMD , figureFileSmall=4iKssko/gyGZAg4HWfUBzg==, figureFileBig=GBI0GTCF3muLvgTePKHP/A==, tableContent=null), ArticleFig(id=1222513651085463779, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=Nbvinfi/mlsHTl1tk+EPCg==, figureFileBig=Lk2q8JpUmRuebRZWy2DFuw==, tableContent=null), ArticleFig(id=1222513651311956211, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 7, caption=
Appearance of lung tissues, the images of hematoxylin and eosin (H & E, 200×) and the expression of nuclear factor kappa B p65 (NF-κB p65) (200×). The scale bars indicate 100 μm. LMD* indicates administration of LMD earlier than other regimens for the lung cancer rats treated with LMD, once a week, 15 days post-administration of carcinogen , figureFileSmall=Nbvinfi/mlsHTl1tk+EPCg==, figureFileBig=Lk2q8JpUmRuebRZWy2DFuw==, tableContent=null), ArticleFig(id=1222513651404230913, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=n4L1OO1cRxcu7FSb3UpDig==, figureFileBig=A/zIxRmcsuIsJGpvHHxLaQ==, tableContent=null), ArticleFig(id=1222513651580391691, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 8, caption=
Expression of vascular endothelial growth factor(VEGF) in the lung tissues of healthy rats (a), tumor-bearing rats without treatment (b), tumor-bearing rats treated with blank liposomes (c), MLT (d), gemcitabine (e), LMD (f), and LMD* (g). n = 4, $\bar{x}\pm s$.**P < 0.01 vs MLT or gemcitabine , figureFileSmall=n4L1OO1cRxcu7FSb3UpDig==, figureFileBig=A/zIxRmcsuIsJGpvHHxLaQ==, tableContent=null), ArticleFig(id=1222513651718803737, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=wUp+hWbP50Mu2tVRdeSf4A==, figureFileBig=MVaTcz/Q9GNv425G5t0t/w==, tableContent=null), ArticleFig(id=1222513651886575913, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 9, caption=
Expression of total proteins (A) and malondialdehyde (MDA) (B) in the lung tissues. The meanings of a-g are referred to Figure 8. n = 4, $\bar{x}\pm s$.**P < 0.01 vs MLT (d) or tumor-bearing rats without treatment (b); #P < 0.05, # #P < 0.01 vs tumor-bearing rats without treatment (b) , figureFileSmall=wUp+hWbP50Mu2tVRdeSf4A==, figureFileBig=MVaTcz/Q9GNv425G5t0t/w==, tableContent=null), ArticleFig(id=1222513652016599348, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=vgE/3OuEhxi6AHxaIFI8kQ==, figureFileBig=woe72Yt8j2zZtMA6W026GA==, tableContent=null), ArticleFig(id=1222513652188565824, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Figure 10, caption=
Apoptosis indicated by Tunel staining (200×). The nuclei are shown by 4', 6'-diamidino-2-phenylindole (DAPI) staining (200×). The merged images of Tunel and DAPI staining show the apoptosis in the lung cells. The group names are referred to the text and LMD* indicates administration of LMD earlier than other regimens , figureFileSmall=vgE/3OuEhxi6AHxaIFI8kQ==, figureFileBig=woe72Yt8j2zZtMA6W026GA==, tableContent=null), ArticleFig(id=1222513652289229128, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=null, figureFileBig=null, tableContent=
| Level | Factor |
| A | | B | | C |
| Soy bean lecithin/cholesterol (w/w) | | Soy bean lecithin/ MLT (mol/mol) | | Water phase/organic phase (v/v) |
| 1 | 3:1 | | 1:1 | | 3:1 |
| 2 | 5:1 | 2:1 | 4:1 |
| 3 | 10:1 | | 3:1 | | 5:1 |
), ArticleFig(id=1222513652415058255, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Table 1, caption=
Factors and levels for the orthogonal design of liposomal melatonin (LM) formulations. MLT: Melatonin
, figureFileSmall=null, figureFileBig=null, tableContent=
| Level | Factor |
| A | | B | | C |
| Soy bean lecithin/cholesterol (w/w) | | Soy bean lecithin/ MLT (mol/mol) | | Water phase/organic phase (v/v) |
| 1 | 3:1 | | 1:1 | | 3:1 |
| 2 | 5:1 | 2:1 | 4:1 |
| 3 | 10:1 | | 3:1 | | 5:1 |
), ArticleFig(id=1222513652628967773, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=null, figureFileBig=null, tableContent=
| Ingredient | Content/g |
| Magnesium chloride hexahydrate | 0.203 3 |
| Sodium chloride | 6.019 3 |
| Potassium chloride | 0.298 2 |
| Disodium hydrogen phosphate dodecahydrate | 0.250 1 |
| Sodium sulfate | 0.071 0 |
| Calcium chloride | 0.277 5 |
| Sodium acetate | 0.574 4 |
| Sodium bicarbonate | 2.604 3 |
| Sodium citrate | 0.097 0 |
), ArticleFig(id=1222513652763185512, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Table 2, caption=
Formula of simulated lung fluids[17]
, figureFileSmall=null, figureFileBig=null, tableContent=
| Ingredient | Content/g |
| Magnesium chloride hexahydrate | 0.203 3 |
| Sodium chloride | 6.019 3 |
| Potassium chloride | 0.298 2 |
| Disodium hydrogen phosphate dodecahydrate | 0.250 1 |
| Sodium sulfate | 0.071 0 |
| Calcium chloride | 0.277 5 |
| Sodium acetate | 0.574 4 |
| Sodium bicarbonate | 2.604 3 |
| Sodium citrate | 0.097 0 |
), ArticleFig(id=1222513652893208943, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=EN, label=null, caption=null, figureFileSmall=null, figureFileBig=null, tableContent=
| Formula | Factor | Entrapment efficiency of MLT/% |
| A | B | C |
| 1 | 1 | 1 | 1 | 85.6 |
| 2 | 1 | 2 | 2 | 98.8 |
| 3 | 1 | 3 | 3 | 94.0 |
| 4 | 2 | 1 | 2 | 87.3 |
| 5 | 2 | 2 | 3 | 93.0 |
| 6 | 2 | 3 | 1 | 93.4 |
| 7 | 3 | 1 | 3 | 99.3 |
| 8 | 3 | 2 | 1 | 98.0 |
| 9 | 3 | 3 | 2 | 98.9 |
| K1 | 92.8 | 90.7 | 92.3 | |
| K2 | 91.2 | 96.6 | 95.0 | |
| K3 | 98.7 | 95.4 | 95.4 | |
| R | 7.5 | 5.8 | 3.1 | |
), ArticleFig(id=1222513653031620985, tenantId=1146029695717560320, journalId=1189982191388893191, articleId=1222466553971467053, language=CN, label=Table 3, caption=
Entrapment efficiencies of MLT according to the orthogonal design of LM formulations
, figureFileSmall=null, figureFileBig=null, tableContent=
| Formula | Factor | Entrapment efficiency of MLT/% |
| A | B | C |
| 1 | 1 | 1 | 1 | 85.6 |
| 2 | 1 | 2 | 2 | 98.8 |
| 3 | 1 | 3 | 3 | 94.0 |
| 4 | 2 | 1 | 2 | 87.3 |
| 5 | 2 | 2 | 3 | 93.0 |
| 6 | 2 | 3 | 1 | 93.4 |
| 7 | 3 | 1 | 3 | 99.3 |
| 8 | 3 | 2 | 1 | 98.0 |
| 9 | 3 | 3 | 2 | 98.9 |
| K1 | 92.8 | 90.7 | 92.3 | |
| K2 | 91.2 | 96.6 | 95.0 | |
| K3 | 98.7 | 95.4 | 95.4 | |
| R | 7.5 | 5.8 | 3.1 | |
)], attaches=null, journal=Journal(id=1189982048455397383, delFlag=0, nameCn=药学学报, nameEn=Acta Pharmaceutica Sinica, nameHistory1=null, nameHistory2=null, issn=0513-4870, eissn=null, cn=11-2163/R, coden=null, periodic=0, language=CN, oaType=null, ccby=null, superviseOffice=null, ownerOffice=null, pubOffice=null, editorOffice=null, officeType=null, aims=null, clcCode=null, officeProv=null, officeCity=null, officeAddr=null, officeZip=null, officeEmail=null, officePhone=null, editDirector=null, officeDirector=null, officeDirectorPhone=null, officeStaffNum=null, officeEmpNum=null, coverPicUrl=BTxjudbJDVO4PqdBR6On6Q==, journalPrice=null, startedYear=null, abbrevIsoEn=null, journalRemark=null, publicationField=null, createdTime=1761643429151, updatedTime=1788948913902, createdBy=18614031015, updatedBy=13041195026, firstLetterCn=Y, firstLetterEn=Y, subjectCode=Medical and Pharmaceutical Sciences, subjectName=Life Sciences, subjectCodeEn=Medical and Pharmaceutical Sciences, subjectNameEn=null, picCn=BTxjudbJDVO4PqdBR6On6Q==, picEn=c4l1ckL55nWbhl1KrFdWIA==, jcr=null, cjcr=null, exts=[JournalExt(id=1304509553505227679, language=CN, name=药学学报, nameHistory1=null, nameHistory2=null, managedBy=中国科学技术协会, sponsoredBy=中国药学会、中国医学科学院药物研究所, publishedBy=《药学学报》编辑委员会编辑出版, editorOffice=, officeProv=null, officeCity=null, officeAddr=, officeZip=, editDirector=, officeDirector=null, officePhone=null, coverPicUrl=null, journalRemark=, submitArticleUrl=null, websiteUrl=, createdTime=1788948914171, updatedTime=1788948914171, createdBy=13041195026, updatedBy=13041195026, submissionGuidelinesUrl=, submissionAuthorUrl=https://www.yxxb.com.cn/journalx_yxxb/authorLogOn.action, submissionEditorUrl=https://www.yxxb.com.cn/journalx_yxxb/editorLogOn.action, submissionReviewUrl=https://www.yxxb.com.cn/journalx_yxxb/expertLogOn.action, submissionCeEditorUrl=, submissionAeEditorUrl=, option={"copyright":""}), JournalExt(id=1304509553559753632, language=EN, name=Acta Pharmaceutica Sinica, nameHistory1=null, nameHistory2=null, managedBy=, sponsoredBy=, publishedBy=, editorOffice=, officeProv=null, officeCity=null, officeAddr=, officeZip=, editDirector=, officeDirector=null, officePhone=null, coverPicUrl=null, journalRemark=, submitArticleUrl=null, websiteUrl=, createdTime=1788948914184, updatedTime=1788948914184, createdBy=13041195026, updatedBy=13041195026, submissionGuidelinesUrl=, submissionAuthorUrl=https://www.yxxb.com.cn/journalx_yxxb/authorLogOn.action, submissionEditorUrl=https://www.yxxb.com.cn/journalx_yxxb/editorLogOn.action, submissionReviewUrl=https://www.yxxb.com.cn/journalx_yxxb/expertLogOn.action, submissionCeEditorUrl=, submissionAeEditorUrl=, option={"copyright":""})], databaseList=null, tenantJournalId=1189982191388893191, websiteList=[Website(id=1189982271588340489, webName=null, webTitle=null, webDomain=null, webCopyrigh=null, webIpcNo=null, seoTitle=null, seoKeywords=null, seoDescription=null, tenantJournalId=null, journalId=1189982191388893191, journalNameCn=null, journalNameEn=null, grayFlag=null, tenantId=1146029695717560320, platformId=null, journalGroupId=null, journalGroupNameCn=null, journalGroupNameEn=null, type=1, domain=https://castjournals.cast.org.cn/joweb/yxxb/CN, language=CN, createTime=1761643482348, createBy=18614031015, updateTime=1761643498101, updateBy=18614031015, name=药学学报-中文, tplId=1146099689490845704, title=药学学报, delFlag=0, indexPage=/home, props=[WebsiteProps(id=1189982873114448678, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=articleTextType, value=kx, createTime=1761643625763, updateTime=1761643625763, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873093477155, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=banner, value=null, createTime=1761643625758, updateTime=1761643625758, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873135420201, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=grayFlag, value=0, createTime=1761643625768, updateTime=1761643625768, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873085088546, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=logo, value=https://castjournals.cast.org.cn/joweb/yxxb/CN/file/pic?fileId=w+t2v8bJnX5lh3+hRRJcDA==, createTime=1761643625756, updateTime=1761643625756, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873152197419, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=minRunFlag, value=0, createTime=1761643625772, updateTime=1761643625772, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873110254373, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=picServerUrl, value=https://castjournals.cast.org.cn/joweb/yxxb/CN/file/pic, createTime=1761643625762, updateTime=1761643625762, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873143808810, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=silenceFlag, value=0, createTime=1761643625770, updateTime=1761643625770, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873101865764, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=staticResourcePath, value=https://castjournals.cast.org.cn/joweb/cast_kjdb_cn_619/, createTime=1761643625760, updateTime=1761643625760, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873122837287, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=themeColor, value=null, createTime=1761643625765, updateTime=1761643625765, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982873127031592, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271588340489, code=themeStyle, value=null, createTime=1761643625766, updateTime=1761643625766, creator=18614031015, updator=18614031015)]), Website(id=1189982271655449355, webName=null, webTitle=null, webDomain=null, webCopyrigh=null, webIpcNo=null, seoTitle=null, seoKeywords=null, seoDescription=null, tenantJournalId=null, journalId=1189982191388893191, journalNameCn=null, journalNameEn=null, grayFlag=null, tenantId=1146029695717560320, platformId=null, journalGroupId=null, journalGroupNameCn=null, journalGroupNameEn=null, type=1, domain=https://castjournals.cast.org.cn/joweb/yxxb/EN, language=EN, createTime=1761643482364, createBy=18614031015, updateTime=1761643514085, updateBy=18614031015, name=药学学报-英文, tplId=1146101810881728533, title=Acta Pharmaceutica Sinica, delFlag=0, indexPage=/home, props=[WebsiteProps(id=1189982903015633534, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=articleTextType, value=kx, createTime=1761643632892, updateTime=1761643632892, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982902990467707, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=banner, value=null, createTime=1761643632886, updateTime=1761643632886, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982903036605057, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=grayFlag, value=0, createTime=1761643632897, updateTime=1761643632897, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982902982079098, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=logo, value=https://castjournals.cast.org.cn/joweb/yxxb/EN/file/pic?fileId=w+t2v8bJnX5lh3+hRRJcDA==, createTime=1761643632884, updateTime=1761643632884, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982903053382275, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=minRunFlag, value=0, createTime=1761643632901, updateTime=1761643632901, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982903007244925, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=picServerUrl, value=https://castjournals.cast.org.cn/joweb/yxxb/EN/file/pic, createTime=1761643632890, updateTime=1761643632890, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982903044993666, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=silenceFlag, value=0, createTime=1761643632899, updateTime=1761643632899, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982902998856316, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=staticResourcePath, value=https://castjournals.cast.org.cn/joweb/cast_kjdb_en_623/, createTime=1761643632888, updateTime=1761643632888, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982903019827839, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=themeColor, value=null, createTime=1761643632893, updateTime=1761643632893, creator=18614031015, updator=18614031015), WebsiteProps(id=1189982903028216448, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1189982271655449355, code=themeStyle, value=null, createTime=1761643632895, updateTime=1761643632895, creator=18614031015, updator=18614031015)])], journalTitle=药学学报, weixinUrl=null, journalUrl=https://www.yxxb.com.cn/aps, iacademicId=null, status=1, seqNo=null, journalTitleEn=Acta Pharmaceutica Sinica, journalPhotoCn=BTxjudbJDVO4PqdBR6On6Q==, journalPhotoEn=c4l1ckL55nWbhl1KrFdWIA==, journalFirstLetter=Y, journalRecommend=null, journalNew=null, journalCollection=null, jcrJf=null, cjcrJf=null, jcrJfStr=null, cjcrJfStr=null, submissionFirstDecision=null, sciSubjectClassification=null, casSubjectClassification=null, citeScore=null, totalCitationFrequency=null, icpCode=null, psCode=null, advertisingLicenseCode=null, copyrightInformation=null, country=null, option=, provinceCode=null, provinceName=null, collectFlag=false, interPubPlatform=, interPubPlatformUrl=null), detailUrlCn=https://castjournals.cast.org.cn/joweb/yxxb/CN/10.16438/j.0513-4870.2018-1041, detailUrlEn=https://castjournals.cast.org.cn/joweb/yxxb/EN/10.16438/j.0513-4870.2018-1041, pdfUrlCn=https://castjournals.cast.org.cn/joweb/yxxb/CN/PDF/10.16438/j.0513-4870.2018-1041, pdfUrlEn=https://castjournals.cast.org.cn/joweb/yxxb/EN/PDF/10.16438/j.0513-4870.2018-1041, aliStartDate=null, aliEndDate=null, collectionFlag=false, citedCount=null, citedUrl=null, previewStatus=0, delFlag=0, hasFullText=1, orderTime=1552320000000, fullTextJson=null, articleText=null, reference=null)