Article(id=1149729528840368499, tenantId=1146029695717560320, journalId=1146123302524792850, issueId=1149729524688007450, articleNumber=null, orderNo=null, doi=10.3969/j.issn.1672-6073.2025.02.020, pmid=null, cstr=null, oa=null, hot=null, price=null, onlineType=0, articleFormat=0, articleType=null, articleTypeStr=null, receivedDate=1711468800000, receivedDateStr=2024-03-27, revisedDate=1716480000000, revisedDateStr=2024-05-24, acceptedDate=null, acceptedDateStr=null, onlineDate=1752046480617, onlineDateStr=2025-07-09, pubDate=1743436800000, pubDateStr=2025-04-01, doiRegisterDate=null, doiRegisterDateStr=null, onlineIssueDate=1752046480617, onlineIssueDateStr=2025-07-09, onlineJustAcceptDate=null, onlineJustAcceptDateStr=null, onlineFirstDate=null, onlineFirstDateStr=null, sourceXml=null, magXml=null, createTime=1752046480617, creator=13701087609, updateTime=1752046480617, updator=13701087609, issue=Issue{id=1149729524688007450, tenantId=1146029695717560320, journalId=1146123302524792850, year='2025', volume='38', issue='2', pageStart='1', pageEnd='177', issueExtLink='null', onlineDate='null', pubDate='null', beforeIssueId=null, nextIssueId=null, price=null, status=1, issueComplete=1, articleOrder=1, issueType=-1, specialIssue=null, createTime=1752046479627, creator=13701087609, updateTime=1753780095764, updator=13701087609, preIssue=null, nextIssue=null, ext={EN=IssueExt(id=1157000837835870332, tenantId=1146029695717560320, journalId=1146123302524792850, issueId=1149729524688007450, language=EN, specialIssueTitle=, coverIllustrator=, specialIssueEditor=, specialIssueAbout=), CN=IssueExt(id=1157000837835870333, tenantId=1146029695717560320, journalId=1146123302524792850, issueId=1149729524688007450, language=CN, specialIssueTitle=, coverIllustrator=, specialIssueEditor=, specialIssueAbout=)}, issueFiles=null}, startPage=140, endPage=146, ext={EN=ArticleExt(id=1149729529146552703, articleId=1149729528840368499, tenantId=1146029695717560320, journalId=1146123302524792850, language=EN, title=Key Method for Automatic Generation of Acceptance Test Sequences in Urban Rail Transit Signal System, columnId=1152669334582243706, journalTitle=Urban Rapid Rail Transit, columnName=Electrical and Mechanical Engineering, runingTitle=null, highlight=null, articleAbstract=
This paper addresses the challenges in onsite engineering acceptance testing of urban rail transit signaling systems in China, which currently face issues such as singlemethod approaches, lengthy cycle times, low efficiency, high costs, and heavy workloads. A method for automatic generation of onsite engineering acceptance test sequences is proposed. The methodology involves three main steps: First, analyzing the constraints of interconnection test case sets for urban rail signal systems; second, dividing the line into independent test sections; and third, converting line characteristics into computerrecognizable formal language to enhance editing efficiency and humancomputer interaction. The proposed method employs an “auxiliary generation tool" to automatically generate fieldexecutable engineering acceptance test sequences. The effectiveness of this approach is validated through tests on actual railway lines. Results demonstrate that test sequences designed using formal language meet engineering acceptance requirements, achieve 100% coverage of interconnection test cases, and significantly reduce field testing time while improving efficiency compared to traditional manual test sequence design methods.
, correspAuthors=Rui ZHANG, authorNote=null, correspAuthorsNote=null, copyrightStatement=null, copyrightOwner=null, extLink=null, articleAbsUrl=null, sourceXml=null, magXml=null, pdfUrl=null, pdf=null, pdfFileSize=null, pdfExtLink=null, richHtmlUrl=null, mobilePdfUrl=null, reviewReport=null, pdfFirstPage=null, abstractGraph=null, abstractGraphContent=null, abstractVideo=null, citation=null, cebUrl=null, magXmlContent=null, mapNumber=null, authorCompany=null, fund=null, authors=null, authorsList=Rui ZHANG, Xinyue SI, Chengzhi WANG), CN=ArticleExt(id=1149729555885241059, articleId=1149729528840368499, tenantId=1146029695717560320, journalId=1146123302524792850, language=CN, title=城市轨道交通信号系统测试序列自动生成方法研究, columnId=1152669334955536763, journalTitle=都市快轨交通, columnName=机电工程, runingTitle=null, highlight=null, articleAbstract=
针对目前国内城市轨道交通信号系统现场工程验收测试方法单一、周期长、效率低、成本高、任务重和工作量大等问题,研究一种适用于现场工程验收测试序列自动生成的方法。首先分析城轨信号系统互联互通测试案例集约束条件,将线路划分成若干独立测试区段;其次将线路特征量转化为计算机能够识别的形式化语言,提高编辑效率和人机交互体验;然后应用辅助生成工具自动生成若干条现场可执行的工程验收测试序列;最后选取真实线路作为测试对象,验证工程验收测试效率。研究表明:相较于传统的人工设计测试序列的方法,通过形式化语言设计的测试序列,满足工程验收要求,覆盖互联互通测试案例,能够缩短现场测试时间,提高测试效率。
, correspAuthors=张锐, authorNote=null, correspAuthorsNote=null, copyrightStatement=null, copyrightOwner=null, extLink=null, articleAbsUrl=null, sourceXml=et9pp2XRO8pyT7N4WSar6A==, magXml=3OcZKJrLkqNKiYVMLub+GA==, pdfUrl=null, pdf=wzyFrhwpRmyyAZFfcfRxcw==, pdfFileSize=null, pdfExtLink=null, richHtmlUrl=null, mobilePdfUrl=null, reviewReport=null, pdfFirstPage=null, abstractGraph=null, abstractGraphContent=null, abstractVideo=null, citation=null, cebUrl=null, magXmlContent=Tv6meYeVnkMEjpv0bZIqOg==, mapNumber=null, authorCompany=null, fund=null, authors=
, authorsList=张锐, 司鑫悅, 王成志)}, authors=[Author(id=1154050942044463859, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, orderNo=0, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=zhangruilju@126.com, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1154050942459699971, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, authorId=1154050942044463859, language=EN, stringName=Rui ZHANG, firstName=Rui, middleName=null, lastName=ZHANG, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 2, address=
1 Gansu Industry Technology Center of Evaluation and Testing of Rail Transportation Signal and Control Lanzhou 730070
2 Gansu Zhongyihe Technology Co., Ltd. Lanzhou 730070, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1154050942526808839, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, authorId=1154050942044463859, language=CN, stringName=张锐, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 2, address=
1 兰州交通大学 甘肃省轨道交通信号与控制评测行业技术中心 兰州 730070
2 甘肃众一合技术有限公司 兰州 730070, bio={"content":"
张锐,男,硕士,高级工程师,研究方向为轨道交通信号控制、工程设计,zhangruilju@126.com
"}, bioImg=null, bioContent=
张锐,男,硕士,高级工程师,研究方向为轨道交通信号控制、工程设计,zhangruilju@126.com
, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1154050941662782168, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=1, ext=[AuthorCompanyExt(id=1154050941666976473, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941662782168, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
1 Gansu Industry Technology Center of Evaluation and Testing of Rail Transportation Signal and Control Lanzhou 730070), AuthorCompanyExt(id=1154050941675365082, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941662782168, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
1 兰州交通大学 甘肃省轨道交通信号与控制评测行业技术中心 兰州 730070)]), AuthorCompany(id=1154050941725696734, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=2, ext=[AuthorCompanyExt(id=1154050941734085343, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941725696734, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
2 Gansu Zhongyihe Technology Co., Ltd. Lanzhou 730070), AuthorCompanyExt(id=1154050941738279648, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941725696734, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
2 甘肃众一合技术有限公司 兰州 730070)])]), Author(id=1154050942589723404, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, orderNo=1, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1154050943265006375, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, authorId=1154050942589723404, language=EN, stringName=Xinyue SI, firstName=Xinyue, middleName=null, lastName=SI, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 3, address=
1 Gansu Industry Technology Center of Evaluation and Testing of Rail Transportation Signal and Control Lanzhou 730070
3 China Academy of Railway Sciences (Beijing) Engineering Consulting Co., Ltd. Beijing 100081, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1154050943348892458, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, authorId=1154050942589723404, language=CN, stringName=司鑫悅, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
1, 3, address=
1 兰州交通大学 甘肃省轨道交通信号与控制评测行业技术中心 兰州 730070
3 铁科院(北京)工程咨询有限公司 北京 100081, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1154050941662782168, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=1, ext=[AuthorCompanyExt(id=1154050941666976473, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941662782168, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
1 Gansu Industry Technology Center of Evaluation and Testing of Rail Transportation Signal and Control Lanzhou 730070), AuthorCompanyExt(id=1154050941675365082, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941662782168, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
1 兰州交通大学 甘肃省轨道交通信号与控制评测行业技术中心 兰州 730070)]), AuthorCompany(id=1154050941805388516, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=3, ext=[AuthorCompanyExt(id=1154050941813777124, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941805388516, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
3 China Academy of Railway Sciences (Beijing) Engineering Consulting Co., Ltd. Beijing 100081), AuthorCompanyExt(id=1154050941817971429, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941805388516, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
3 铁科院(北京)工程咨询有限公司 北京 100081)])]), Author(id=1154050943407612718, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, orderNo=2, firstName=null, middleName=null, lastName=null, nameCn=null, orcid=null, stid=null, country=null, authorPic=null, dead=0, email=null, emailSecond=null, emailThird=null, correspondingAuthor=0, authorType=1, ext={EN=AuthorExt(id=1154050943906734903, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, authorId=1154050943407612718, language=EN, stringName=Chengzhi WANG, firstName=Chengzhi, middleName=null, lastName=WANG, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
4, address=
4 Jinan Design Institute China Railway Engineering Design Consulting Group Co., Ltd. Jinan 250022, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null), CN=AuthorExt(id=1154050943990620985, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, authorId=1154050943407612718, language=CN, stringName=王成志, firstName=null, middleName=null, lastName=null, prefix=null, suffix=null, authorComment=null, nameInitials=null, affiliation=null, department=null, xref=
4, address=
4 中铁工程设计咨询集团有限公司 济南设计院 济南 250022, bio=null, bioImg=null, bioContent=null, aboutCorrespAuthor=null)}, companyList=[AuthorCompany(id=1154050941922829035, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=4, ext=[AuthorCompanyExt(id=1154050941927023339, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941922829035, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
4 Jinan Design Institute China Railway Engineering Design Consulting Group Co., Ltd. Jinan 250022), AuthorCompanyExt(id=1154050941935411949, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941922829035, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
4 中铁工程设计咨询集团有限公司 济南设计院 济南 250022)])])], keywords=[Keyword(id=1154050944376496962, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, orderNo=1, keyword=urban rail transit), Keyword(id=1154050944447800132, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, orderNo=2, keyword=signal system), Keyword(id=1154050944527491911, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, orderNo=3, keyword=communication based train control), Keyword(id=1154050944602989385, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, orderNo=4, keyword=interconnection and interoperability), Keyword(id=1154050944678486860, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, orderNo=5, keyword=engineering test), Keyword(id=1154050944737207119, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, orderNo=6, keyword=formal methods), Keyword(id=1154050944816898897, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, orderNo=7, keyword=test sequence), Keyword(id=1154050944930145106, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, orderNo=1, keyword=城市轨道交通), Keyword(id=1154050945039197011, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, orderNo=2, keyword=信号系统), Keyword(id=1154050945093722965, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, orderNo=3, keyword=CBTC), Keyword(id=1154050945160831829, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, orderNo=4, keyword=互联互通), Keyword(id=1154050945232134998, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, orderNo=5, keyword=工程测试), Keyword(id=1154050945357964121, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, orderNo=6, keyword=形式化语言), Keyword(id=1154050945429267291, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, orderNo=7, keyword=测试顺序)], refs=[Reference(id=1154050948847625099, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2021, volume=156, issue=null, pageStart=107290, pageEnd=null, url=null, language=null, rfNumber=[1], rfOrder=0, authorNames=DAI Xiaohu, GONG Wenyin, GU Qiong, journalName=Computers & industrial engineering, refType=null, unstructuredReference=
DAI Xiaohu ,
GONG Wenyin ,
GU Qiong . Automated test case generation based on differential evolution with node branch archive[J].
Computers & industrial engineering,
2021,
156: 107290., articleTitle=Automated test case generation based on differential evolution with node branch archive, refAbstract=null), Reference(id=1154050948918928268, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2019, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[2], rfOrder=1, authorNames=SONG Haifeng, SCHNIEDER E, journalName=IEEE transactions on intelligent transportation systems, refType=null, unstructuredReference=
SONG Haifeng ,
SCHNIEDER E . Availability and performance analysis of train-to-train data communication system[J].
IEEE transactions on intelligent transportation systems,
2019., articleTitle=Availability and performance analysis of train-to-train data communication system, refAbstract=null), Reference(id=1154050948969259917, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[3], rfOrder=2, authorNames=中国轨道交通协会, journalName=城市轨道交通 基于通信的列车运行控制系统(CBTC)互联互通测试规范第1部分:系统总体要求: T/CAMET 04010.1—2018, refType=null, unstructuredReference=中国轨道交通协会.
城市轨道交通 基于通信的列车运行控制系统(CBTC)互联互通测试规范第1部分:系统总体要求: T/CAMET 04010.1—2018[S]. 北京: 中国轨道交通协会,
2018., articleTitle=null, refAbstract=null), Reference(id=1154050949040563086, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[3], rfOrder=3, authorNames=China Association of Metros, journalName=Urban rail transit-System specification for interoperability of communication based train control system Part 1: General system requirements: T/CAMET 04010.1—2018, refType=null, unstructuredReference=China Association of Metros.
Urban rail transit-System specification for interoperability of communication based train control system Part 1: General system requirements: T/CAMET 04010.1—2018[S]. Beijing: China Association of Metros,
2018., articleTitle=null, refAbstract=null), Reference(id=1154050949116060559, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[4], rfOrder=4, authorNames=中国轨道交通协会, journalName=城市轨道交通 基于通信的列车运行控制系统(CBTC)互联互通测试规范第1部分:CBTC 部分测试及验证:T/CAMET 04012.1—2018, refType=null, unstructuredReference=中国轨道交通协会.
城市轨道交通 基于通信的列车运行控制系统(CBTC)互联互通测试规范第1部分:CBTC 部分测试及验证:T/CAMET 04012.1—2018[S]. 北京: 中国轨道交通协会,
2018., articleTitle=null, refAbstract=null), Reference(id=1154050949241889680, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[4], rfOrder=5, authorNames=China Association of Metros, journalName=Urban rail transit-Test specification for interoperability of communication based train control system Part 1: Test and verification of CBTC part: T/CAMET 04012.1—2018, refType=null, unstructuredReference=China Association of Metros.
Urban rail transit-Test specification for interoperability of communication based train control system Part 1: Test and verification of CBTC part: T/CAMET 04012.1—2018[S]. Beijing: China Association of Metros,
2018., articleTitle=null, refAbstract=null), Reference(id=1154050949342552977, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[5], rfOrder=6, authorNames=中国轨道交通协会, journalName=城市轨道交通 基于通信的列车运行控制系统(CBTC)互联互通测试规范第2部分:点式部分测试及验证:T/CAMET 04012.2—2018, refType=null, unstructuredReference=中国轨道交通协会.
城市轨道交通 基于通信的列车运行控制系统(CBTC)互联互通测试规范第2部分:点式部分测试及验证:T/CAMET 04012.2—2018[S]. 北京: 中国轨道交通协会,
2018., articleTitle=null, refAbstract=null), Reference(id=1154050949422244754, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[5], rfOrder=7, authorNames=China Association of Metros, journalName=Urban rail transit-Test specification for interoperability of communication based train control system Part 2: Test and verification of intermittent control part: T/CAMET 04012.2—2018, refType=null, unstructuredReference=China Association of Metros.
Urban rail transit-Test specification for interoperability of communication based train control system Part 2: Test and verification of intermittent control part: T/CAMET 04012.2—2018[S]. Beijing: China Association of Metros,
2018., articleTitle=null, refAbstract=null), Reference(id=1154050949501936531, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2011, volume=35, issue=5, pageStart=50, pageEnd=56, url=null, language=null, rfNumber=[6], rfOrder=8, authorNames=燕飞, 郜春海, 唐涛, journalName=北京交通大学学报, refType=null, unstructuredReference=燕飞, 郜春海, 唐涛. 国产 CBTC 系统安全认证模式探索[J].
北京交通大学学报,
2011,
35(5): 50-56., articleTitle=国产 CBTC 系统安全认证模式探索, refAbstract=null), Reference(id=1154050949548073876, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2011, volume=35, issue=5, pageStart=50, pageEnd=56, url=null, language=null, rfNumber=[6], rfOrder=9, authorNames=YAN Fei, GAO Chunhai, TANG Tao, journalName=Journal of Beijing Jiaotong university, refType=null, unstructuredReference=
YAN Fei ,
GAO Chunhai ,
TANG Tao . Safety assessment mode research for autonomous innovation CBTC system[J].
Journal of Beijing Jiaotong university,
2011,
35(5): 50-56., articleTitle=Safety assessment mode research for autonomous innovation CBTC system, refAbstract=null), Reference(id=1154050949606794133, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=62, issue=8, pageStart=168, pageEnd=173, url=null, language=null, rfNumber=[7], rfOrder=10, authorNames=宋爽, 刘伯鸿, 周科, journalName=铁道标准设计, refType=null, unstructuredReference=宋爽, 刘伯鸿, 周科, 等. 一种基于时间自动机模型的区域控制器测试序列生成方法[J].
铁道标准设计,
2018,
62(8): 168-173., articleTitle=一种基于时间自动机模型的区域控制器测试序列生成方法, refAbstract=null), Reference(id=1154050949673902998, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=62, issue=8, pageStart=168, pageEnd=173, url=null, language=null, rfNumber=[7], rfOrder=11, authorNames=SONG Shuang, LIU Bohong, ZHOU Ke, journalName=Railway standard design, refType=null, unstructuredReference=
SONG Shuang ,
LIU Bohong ,
ZHOU Ke , et al. A test sequence generation method of zone controller based on timed automata[J].
Railway standard design,
2018,
62(8): 168-173., articleTitle=A test sequence generation method of zone controller based on timed automata, refAbstract=null), Reference(id=1154050949741011863, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=42, issue=6, pageStart=97, pageEnd=103, url=null, language=null, rfNumber=[8], rfOrder=12, authorNames=赵天时, journalName=北京交通大学学报, refType=null, unstructuredReference=赵天时. 基于有色Petri网的测试案例生成方法及其在 CTCS-3 车地通信中的应用[J].
北京交通大学学报,
2018,
42(6): 97-103., articleTitle=基于有色Petri网的测试案例生成方法及其在 CTCS-3 车地通信中的应用, refAbstract=null), Reference(id=1154050949799732120, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2018, volume=42, issue=6, pageStart=97, pageEnd=103, url=null, language=null, rfNumber=[8], rfOrder=13, authorNames=ZHAO Tianshi, journalName=Journal of Beijing Jiaotong University, refType=null, unstructuredReference=
ZHAO Tianshi . Test case generation method based on colored Petri net and its application in OnBoard-Trackside communication of CTCS-3[J].
Journal of Beijing Jiaotong University,
2018,
42(6): 97-103., articleTitle=Test case generation method based on colored Petri net and its application in OnBoard-Trackside communication of CTCS-3, refAbstract=null), Reference(id=1154050949892006809, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2021, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[9], rfOrder=14, authorNames=司鑫悅, journalName=null, refType=null, unstructuredReference=司鑫悅. 城市轨道交通CBTC 系统工程测试序列生成方法研究与实现[D]. 兰州: 兰州交通大学,
2021., articleTitle=城市轨道交通CBTC 系统工程测试序列生成方法研究与实现, refAbstract=null), Reference(id=1154050949942338458, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2021, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[9], rfOrder=15, authorNames=SI Xinyue, journalName=null, refType=null, unstructuredReference=
SI Xinyue . Research and implementation of engineering test sequence generation method for CBTC system of urban rail transit[D]. Lanzhou: Lanzhou Jiaotong University,
2021., articleTitle=Research and implementation of engineering test sequence generation method for CBTC system of urban rail transit, refAbstract=null), Reference(id=1154050950034613147, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2011, volume=24, issue=4, pageStart=33, pageEnd=36, url=null, language=null, rfNumber=[10], rfOrder=16, authorNames=王伟, 张建明, journalName=都市快轨交通, refType=null, unstructuredReference=王伟, 张建明. 基于最小系统的CBTC仿真测试平台[J].
都市快轨交通,
2011,
24(4): 33-36., articleTitle=基于最小系统的CBTC仿真测试平台, refAbstract=null), Reference(id=1154050950089139100, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2011, volume=24, issue=4, pageStart=33, pageEnd=36, url=null, language=null, rfNumber=[10], rfOrder=17, authorNames=WANG Wei, ZHANG Jianming, journalName=Urban rapid rail transit, refType=null, unstructuredReference=
WANG Wei ,
ZHANG Jianming . Study on CBTC simulation test platform based on the minimum system[J].
Urban rapid rail transit,
2011,
24(4): 33-36., articleTitle=Study on CBTC simulation test platform based on the minimum system, refAbstract=null), Reference(id=1154050950206579613, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2022, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[11], rfOrder=18, authorNames=中华人民共和国交通运输部, journalName=null, refType=null, unstructuredReference=中华人民共和国交通运输部. 城市轨道交通初期运营前安全评估管理暂行办法:交运规〔2022〕4号[A]. 北京: 中华人民共和国交通运输部,
2022., articleTitle=城市轨道交通初期运营前安全评估管理暂行办法:交运规〔2022〕4号, refAbstract=null), Reference(id=1154050950294659998, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2022, volume=null, issue=null, pageStart=null, pageEnd=null, url=null, language=null, rfNumber=[11], rfOrder=19, authorNames=Ministry of Transport of the People’s Republic of China, journalName=null, refType=null, unstructuredReference=Ministry of Transport of the People’s Republic of China. Interim methods for the management of safety assessment in initial period before operation of urban rail transit: Jiao YunGui[2022](4)[A]. Beijing: Ministry of Transport of the People's Republic of China,
2022., articleTitle=Interim methods for the management of safety assessment in initial period before operation of urban rail transit: Jiao YunGui[2022](4), refAbstract=null), Reference(id=1154050950378546079, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2023, volume=36, issue=1, pageStart=156, pageEnd=167, url=null, language=null, rfNumber=[12], rfOrder=20, authorNames=王皓, journalName=都市快轨交通, refType=null, unstructuredReference=王皓. 基于LTE-M的下一代列控数据通信系统设计与可用性评估[J].
都市快轨交通,
2023,
36(1): 156-167., articleTitle=基于LTE-M的下一代列控数据通信系统设计与可用性评估, refAbstract=null), Reference(id=1154050950462432160, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2023, volume=36, issue=1, pageStart=156, pageEnd=167, url=null, language=null, rfNumber=[12], rfOrder=21, authorNames=WANG Hao, journalName=Urban rapid rail transit, refType=null, unstructuredReference=
WANG Hao . Design and availability evaluation of next generation train control data communications system based on LTE-M[J].
Urban rapid rail transit,
2023,
36(1): 156-167., articleTitle=Design and availability evaluation of next generation train control data communications system based on LTE-M, refAbstract=null), Reference(id=1154050950525346721, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2023, volume=20, issue=9, pageStart=3525, pageEnd=3535, url=null, language=null, rfNumber=[13], rfOrder=22, authorNames=覃瑶, 张亚东, 饶畅, journalName=铁道科学与工程学报, refType=null, unstructuredReference=覃瑶, 张亚东, 饶畅, 等. 基于约束求解的城市轨道交通CBTC 系统事件序列测试用例生成方法[J].
铁道科学与工程学报,
2023,
20(9): 3525-3535., articleTitle=基于约束求解的城市轨道交通CBTC 系统事件序列测试用例生成方法, refAbstract=null), Reference(id=1154050950596649890, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2023, volume=20, issue=9, pageStart=3525, pageEnd=3535, url=null, language=null, rfNumber=[13], rfOrder=23, authorNames=QIN Yao, ZHANG Yadong, RAO Chang, journalName=Journal of railway science and engineering, refType=null, unstructuredReference=
QIN Yao ,
ZHANG Yadong ,
RAO Chang , et al. An event sequence test generation approach for urban rail transit CBTC system based on constraint solving[J].
Journal of railway science and engineering,
2023,
20(9): 3525-3535., articleTitle=An event sequence test generation approach for urban rail transit CBTC system based on constraint solving, refAbstract=null), Reference(id=1154050950663758755, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2023, volume=null, issue=null, pageStart=1, pageEnd=7, url=null, language=null, rfNumber=[14], rfOrder=24, authorNames=KALENDER A, EFEND1OĞLU B, GEZMEZ C, journalName=2023 IEEE AUTOTESTCON, refType=null, unstructuredReference=
KALENDER A ,
EFEND1OĞLU B ,
GEZMEZ C , et al. Development of an automated test environment for the verification of CBTC on-board system[C]//
2023 IEEE AUTOTESTCON,
2023: 1-7., articleTitle=Development of an automated test environment for the verification of CBTC on-board system, refAbstract=null), Reference(id=1154050950726673316, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2021, volume=34, issue=1, pageStart=144, pageEnd=148, url=null, language=null, rfNumber=[15], rfOrder=25, authorNames=陈静梅, journalName=都市快轨交通, refType=null, unstructuredReference=陈静梅. CBTC信号系统智能化故障分析[J].
都市快轨交通,
2021,
34(1): 144-148., articleTitle=CBTC信号系统智能化故障分析, refAbstract=null), Reference(id=1154050950777004965, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2021, volume=34, issue=1, pageStart=144, pageEnd=148, url=null, language=null, rfNumber=[15], rfOrder=26, authorNames=CHEN Jingmei, journalName=Urban rapid rail transit, refType=null, unstructuredReference=
CHEN Jingmei . Intelligent fault analysis of CBTC signal system[J].
Urban rapid rail transit,
2021,
34(1): 144-148., articleTitle=Intelligent fault analysis of CBTC signal system, refAbstract=null), Reference(id=1154050950848308134, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2020, volume=33, issue=4, pageStart=117, pageEnd=122, url=null, language=null, rfNumber=[16], rfOrder=27, authorNames=陈琦, 张冲, 陈静梅, journalName=都市快轨交通, refType=null, unstructuredReference=陈琦, 张冲, 陈静梅. 城市轨道交通CBTC信号系统互联互通接口与调试[J].
都市快轨交通,
2020,
33(4): 117-122., articleTitle=城市轨道交通CBTC信号系统互联互通接口与调试, refAbstract=null), Reference(id=1154050950907028392, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, doi=null, pmid=null, pmcid=null, year=2020, volume=33, issue=4, pageStart=117, pageEnd=122, url=null, language=null, rfNumber=[16], rfOrder=28, authorNames=CHEN Qi, ZHANG Chong, CHEN Jingmei, journalName=Urban rapid rail transit, refType=null, unstructuredReference=
CHEN Qi ,
ZHANG Chong ,
CHEN Jingmei . Interconnection interface and debugging of a CBTC signal system for urban rail transit[J].
Urban rapid rail transit,
2020,
33(4): 117-122., articleTitle=Interconnection interface and debugging of a CBTC signal system for urban rail transit, refAbstract=null)], funds=[Fund(id=1154050948520469383, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, awardId=U2268206, language=CN, fundingSource=国家自然科学基金(U2268206), fundOrder=null, country=null), Fund(id=1154050948587578248, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, awardId=22CX3GA059, language=CN, fundingSource=甘肃省科技计划项目(22CX3GA059), fundOrder=null, country=null), Fund(id=1154050948646298505, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, awardId=2022RCXM014, language=CN, fundingSource=甘肃省重点人才项目(2022RCXM014), fundOrder=null, country=null), Fund(id=1154050948705018762, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, awardId=2024-8-49, language=CN, fundingSource=兰州市科技计划项目(2024-8-49), fundOrder=null, country=null)], companyList=[AuthorCompany(id=1154050941662782168, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=1, ext=[AuthorCompanyExt(id=1154050941666976473, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941662782168, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
1 Gansu Industry Technology Center of Evaluation and Testing of Rail Transportation Signal and Control Lanzhou 730070), AuthorCompanyExt(id=1154050941675365082, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941662782168, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
1 兰州交通大学 甘肃省轨道交通信号与控制评测行业技术中心 兰州 730070)]), AuthorCompany(id=1154050941725696734, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=2, ext=[AuthorCompanyExt(id=1154050941734085343, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941725696734, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
2 Gansu Zhongyihe Technology Co., Ltd. Lanzhou 730070), AuthorCompanyExt(id=1154050941738279648, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941725696734, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
2 甘肃众一合技术有限公司 兰州 730070)]), AuthorCompany(id=1154050941805388516, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=3, ext=[AuthorCompanyExt(id=1154050941813777124, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941805388516, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
3 China Academy of Railway Sciences (Beijing) Engineering Consulting Co., Ltd. Beijing 100081), AuthorCompanyExt(id=1154050941817971429, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941805388516, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
3 铁科院(北京)工程咨询有限公司 北京 100081)]), AuthorCompany(id=1154050941922829035, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, xref=4, ext=[AuthorCompanyExt(id=1154050941927023339, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941922829035, language=EN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
4 Jinan Design Institute China Railway Engineering Design Consulting Group Co., Ltd. Jinan 250022), AuthorCompanyExt(id=1154050941935411949, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, companyId=1154050941922829035, language=CN, country=null, province=null, city=null, postcode=null, companyName=null, departmentName=null, remark=
4 中铁工程设计咨询集团有限公司 济南设计院 济南 250022)])], figs=[ArticleFig(id=1154050947018908528, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 1, caption=
Relationships between basic concepts, figureFileSmall=cyQt1Yr4fY2RaE5n/DAaVw==, figureFileBig=eXHCYWRq5OORgLhKzLfKzQ==, tableContent=null), ArticleFig(id=1154050947077628785, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图1, caption=
基本概念关系, figureFileSmall=cyQt1Yr4fY2RaE5n/DAaVw==, figureFileBig=eXHCYWRq5OORgLhKzLfKzQ==, tableContent=null), ArticleFig(id=1154050947127960434, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 2, caption=
Relationship Diagram Between Test Section Features and Constraints, figureFileSmall=SeKPh193GDcxfTIEKRD7yA==, figureFileBig=S0nWUKgiZUmIUOR6yx6PUQ==, tableContent=null), ArticleFig(id=1154050947178292083, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图2, caption=
测试区段特征与约束条件的关系, figureFileSmall=SeKPh193GDcxfTIEKRD7yA==, figureFileBig=S0nWUKgiZUmIUOR6yx6PUQ==, tableContent=null), ArticleFig(id=1154050947232818036, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 3, caption=
Flowchart of matching algorithm, figureFileSmall=+T6fABUnV3rnMN+oLTJGiQ==, figureFileBig=xNpPzGcF7Tf/XX8KYmE4MQ==, tableContent=null), ArticleFig(id=1154050947283149685, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图3, caption=
匹配算法流程, figureFileSmall=+T6fABUnV3rnMN+oLTJGiQ==, figureFileBig=xNpPzGcF7Tf/XX8KYmE4MQ==, tableContent=null), ArticleFig(id=1154050947341869942, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 4, caption=
Generation of test sequences, figureFileSmall=GdTiZSrOklJRv6bunMsf3Q==, figureFileBig=2vi8HcXgiqoklWi8RS6TzQ==, tableContent=null), ArticleFig(id=1154050947429950327, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图4, caption=
测试序列的生成, figureFileSmall=GdTiZSrOklJRv6bunMsf3Q==, figureFileBig=2vi8HcXgiqoklWi8RS6TzQ==, tableContent=null), ArticleFig(id=1154050947484476280, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 5, caption=
Overall System Operation Process Framework, figureFileSmall=6w3oSJ9WPeQhmMamnzTvHA==, figureFileBig=RlYMtDSR663lP1k/7L3cjQ==, tableContent=null), ArticleFig(id=1154050947530613625, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图5, caption=
系统整体运行流程框架, figureFileSmall=6w3oSJ9WPeQhmMamnzTvHA==, figureFileBig=RlYMtDSR663lP1k/7L3cjQ==, tableContent=null), ArticleFig(id=1154050947593528186, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 6, caption=
XML description of test cases, figureFileSmall=hQYcJSY8BZiFdkEMw5fJ9g==, figureFileBig=OepPQlFgq1Xs3cnPcB2WKA==, tableContent=null), ArticleFig(id=1154050947677414268, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图6, caption=
测试案例的 XML 描述, figureFileSmall=hQYcJSY8BZiFdkEMw5fJ9g==, figureFileBig=OepPQlFgq1Xs3cnPcB2WKA==, tableContent=null), ArticleFig(id=1154050947757106045, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 7, caption=
Test sequence assisted generation tool human-machine interface, figureFileSmall=7NG/Xy/LD+ULX7Wcxk2E1w==, figureFileBig=OuSLLKeKrloUMaSZnotOnw==, tableContent=null), ArticleFig(id=1154050947811631998, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图7, caption=
测试序列辅助生成工具人机交互界面, figureFileSmall=7NG/Xy/LD+ULX7Wcxk2E1w==, figureFileBig=OuSLLKeKrloUMaSZnotOnw==, tableContent=null), ArticleFig(id=1154050947861963647, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 8, caption=
Test report Excel spreadsheet, figureFileSmall=l+2/e+qbGJ1Lu0SLMpFC5g==, figureFileBig=+wYEY0ymbH/o+KQvxap83Q==, tableContent=null), ArticleFig(id=1154050947929072512, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图8, caption=
测试报告 Excel 表格, figureFileSmall=l+2/e+qbGJ1Lu0SLMpFC5g==, figureFileBig=+wYEY0ymbH/o+KQvxap83Q==, tableContent=null), ArticleFig(id=1154050947996181377, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 9, caption=
Test lines, figureFileSmall=/PA0kJDNO9YAU6RP1UKgjw==, figureFileBig=9F9XNnACYttrvSP55OZiew==, tableContent=null), ArticleFig(id=1154050948075873154, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图9, caption=
测试线路, figureFileSmall=/PA0kJDNO9YAU6RP1UKgjw==, figureFileBig=9F9XNnACYttrvSP55OZiew==, tableContent=null), ArticleFig(id=1154050948147176323, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 10, caption=
Excel spreadsheet for exporting test sequences, figureFileSmall=yADr8CO10rIxSxf1D+buQQ==, figureFileBig=OUCsJnyEhqDHa+oZBT8Lpg==, tableContent=null), ArticleFig(id=1154050948231062404, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图10, caption=
测试序列导出的 Excel 表, figureFileSmall=yADr8CO10rIxSxf1D+buQQ==, figureFileBig=OUCsJnyEhqDHa+oZBT8Lpg==, tableContent=null), ArticleFig(id=1154050948285588357, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=EN, label=Figure 11, caption=
T3 terminal ATS test monitoring interface, figureFileSmall=4aplRJbixAdCpUePtbWrKw==, figureFileBig=zcvuU99zRS6innSZE7zdaw==, tableContent=null), ArticleFig(id=1154050948348502918, tenantId=1146029695717560320, journalId=1146123302524792850, articleId=1149729528840368499, language=CN, label=图11, caption=
T3 航站楼站 ATS 测试监控界面, figureFileSmall=4aplRJbixAdCpUePtbWrKw==, figureFileBig=zcvuU99zRS6innSZE7zdaw==, tableContent=null)], attaches=null, journal=Journal(id=1146119287908970507, delFlag=0, nameCn=都市快轨交通, nameEn=Urban Rapid Rail Transit, nameHistory1=null, nameHistory2=null, issn=1672-6073, eissn=, cn=11-5144/U, coden=null, periodic=1, language=CN, oaType=0, ccby=null, superviseOffice=null, ownerOffice=null, pubOffice=null, editorOffice=null, officeType=null, aims=null, clcCode=null, officeProv=null, officeCity=null, officeAddr=null, officeZip=null, officeEmail=null, officePhone=null, editDirector=null, officeDirector=null, officeDirectorPhone=null, officeStaffNum=null, officeEmpNum=null, coverPicUrl=P1a+Ek/jjjHf/jufN8hKnw==, journalPrice=null, startedYear=null, abbrevIsoEn=Urban Rap Rail Trans, journalRemark=null, publicationField=null, createdTime=null, updatedTime=1756899235814, createdBy=null, updatedBy=18614031015, firstLetterCn=U, firstLetterEn=U, subjectCode=Engineering, subjectName=工程, subjectCodeEn=Engineering, subjectNameEn=null, picCn=P1a+Ek/jjjHf/jufN8hKnw==, picEn=Ml/zvLJzYsu7AhRo5kg9VQ==, jcr=null, cjcr=null, exts=[JournalExt(id=1158448607830827008, language=CN, name=都市快轨交通, nameHistory1=null, nameHistory2=null, managedBy=中国科学技术协会, sponsoredBy=中国技术经济学会, publishedBy=, editorOffice=, officeProv=null, officeCity=null, officeAddr=北京市西直门外北京交通大学机械工程楼D905室, officeZip=100044, editDirector=null, officeDirector=null, officePhone=null, coverPicUrl=null, journalRemark=, submitArticleUrl=null, websiteUrl=http://www.urt.cn, createdTime=1754125271042, updatedTime=1754125271042, createdBy=13701087609, updatedBy=13701087609, submissionGuidelinesUrl=http://dskgjt.ijournals.cn/dskgjt/site/menu/20200615141511001, submissionAuthorUrl=http://dskgjt.ijournals.cn/dskgjt/author/login, submissionEditorUrl=http://dskgjt.ijournals.cn/dskgjt/editor/login, submissionReviewUrl=http://dskgjt.ijournals.cn/dskgjt/reviewer/login, submissionCeEditorUrl=, submissionAeEditorUrl=, option={"copyright":""}), JournalExt(id=1158448607931490305, language=EN, name=Urban Rapid Rail Transit, nameHistory1=null, nameHistory2=null, managedBy=, sponsoredBy=, publishedBy=, editorOffice=, officeProv=null, officeCity=null, officeAddr=, officeZip=, editDirector=null, officeDirector=null, officePhone=null, coverPicUrl=null, journalRemark=, submitArticleUrl=null, websiteUrl=, createdTime=1754125271065, updatedTime=1754125271065, createdBy=13701087609, updatedBy=13701087609, submissionGuidelinesUrl=http://dskgjt.ijournals.cn/dskgjten/site/menu/20241120152535001, submissionAuthorUrl=http://dskgjt.ijournals.cn/dskgjt/author/login, submissionEditorUrl=http://dskgjt.ijournals.cn/dskgjt/editor/login, submissionReviewUrl=http://dskgjt.ijournals.cn/dskgjt/reviewer/login, submissionCeEditorUrl=, submissionAeEditorUrl=, option={"copyright":""})], databaseList=null, tenantJournalId=1146123302524792850, websiteList=[Website(id=1148243202399789480, webName=null, webTitle=null, webDomain=null, webCopyrigh=null, webIpcNo=null, seoTitle=null, seoKeywords=null, seoDescription=null, tenantJournalId=null, journalId=1146123302524792850, journalNameCn=null, journalNameEn=null, grayFlag=null, tenantId=1146029695717560320, platformId=null, journalGroupId=null, journalGroupNameCn=null, journalGroupNameEn=null, type=1, domain=https://castjournals.cast.org.cn/joweb/dskgjt/CN, language=CN, createTime=1751692112779, createBy=18614031015, updateTime=1753522796719, updateBy=18614031015, name=都市快轨交通-中文站点, tplId=1146099689490845704, title=都市快轨交通, delFlag=0, indexPage=/home, props=[WebsiteProps(id=1155921926926229709, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1148243202399789480, code=articleTextType, value=kx, createTime=1753522863370, updateTime=1753522863370, creator=18614031015, updator=18614031015), WebsiteProps(id=1155921926905258186, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1148243202399789480, code=banner, value=null, createTime=1753522863365, updateTime=1753522863365, creator=18614031015, updator=18614031015), WebsiteProps(id=1155921926896869577, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1148243202399789480, code=logo, value=https://castjournals.cast.org.cn/joweb/kjdb/CN/file/pic?fileId=AqFiyT4buOvVaL3FTbHG1g==, createTime=1753522863363, updateTime=1753522863363, creator=18614031015, updator=18614031015), WebsiteProps(id=1155921926917841100, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1148243202399789480, code=picServerUrl, value=https://castjournals.cast.org.cn/joweb/kjdb/CN/file/pic, createTime=1753522863368, updateTime=1753522863368, creator=18614031015, updator=18614031015), WebsiteProps(id=1155921926913646795, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1148243202399789480, code=staticResourcePath, value=https://castjournals.cast.org.cn/joweb/cast_kjdb_cn_619/, createTime=1753522863367, updateTime=1753522863367, creator=18614031015, updator=18614031015)]), Website(id=1155921810454626336, webName=null, webTitle=null, webDomain=null, webCopyrigh=null, webIpcNo=null, seoTitle=null, seoKeywords=null, seoDescription=null, tenantJournalId=null, journalId=1146123302524792850, journalNameCn=null, journalNameEn=null, grayFlag=null, tenantId=1146029695717560320, platformId=null, journalGroupId=null, journalGroupNameCn=null, journalGroupNameEn=null, type=1, domain=https://castjournals.cast.org.cn/joweb/dskgjt/EN, language=EN, createTime=1753522835604, createBy=18614031015, updateTime=1753522835604, updateBy=18614031015, name=都市快轨交通-英文站点, tplId=1146101810881728533, title=Urban Rapid Rail Transit, delFlag=0, indexPage=/home, props=[WebsiteProps(id=1155922050809192658, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1155921810454626336, code=articleTextType, value=kx, createTime=1753522892906, updateTime=1753522892906, creator=18614031015, updator=18614031015), WebsiteProps(id=1155922050792415439, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1155921810454626336, code=banner, value=null, createTime=1753522892902, updateTime=1753522892902, creator=18614031015, updator=18614031015), WebsiteProps(id=1155922050788221134, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1155921810454626336, code=logo, value=https://castjournals.cast.org.cn/joweb/kjdb/CN/file/pic?fileId=AqFiyT4buOvVaL3FTbHG1g==, createTime=1753522892901, updateTime=1753522892901, creator=18614031015, updator=18614031015), WebsiteProps(id=1155922050804998353, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1155921810454626336, code=picServerUrl, value=https://castjournals.cast.org.cn/joweb/kjdb/CN/file/pic, createTime=1753522892905, updateTime=1753522892905, creator=18614031015, updator=18614031015), WebsiteProps(id=1155922050796609744, tenantId=1146029695717560320, journalId=null, journalGroupId=null, siteId=1155921810454626336, code=staticResourcePath, value=https://castjournals.cast.org.cn/joweb/cast_kjdb_cn_619/, createTime=1753522892903, updateTime=1753522892903, creator=18614031015, updator=18614031015)])], journalTitle=都市快轨交通, weixinUrl=null, journalUrl=null, iacademicId=null, status=0, seqNo=null, journalTitleEn=Urban Rapid Rail Transit, journalPhotoCn=P1a+Ek/jjjHf/jufN8hKnw==, journalPhotoEn=Ml/zvLJzYsu7AhRo5kg9VQ==, journalFirstLetter=U, journalRecommend=null, journalNew=null, journalCollection=null, jcrJf=null, cjcrJf=null, jcrJfStr=null, cjcrJfStr=null, submissionFirstDecision=null, sciSubjectClassification=null, casSubjectClassification=null, citeScore=null, totalCitationFrequency=null, icpCode=null, psCode=null, advertisingLicenseCode=null, copyrightInformation=null, country=null, option=null, provinceCode=null, provinceName=null, collectFlag=false), detailUrlCn=https://castjournals.cast.org.cn/joweb/dskgjt/CN/10.3969/j.issn.1672-6073.2025.02.020, detailUrlEn=https://castjournals.cast.org.cn/joweb/dskgjt/EN/10.3969/j.issn.1672-6073.2025.02.020, pdfUrlCn=https://castjournals.cast.org.cn/joweb/dskgjt/CN/PDF/10.3969/j.issn.1672-6073.2025.02.020, pdfUrlEn=https://castjournals.cast.org.cn/joweb/dskgjt/EN/PDF/10.3969/j.issn.1672-6073.2025.02.020, aliStartDate=null, aliEndDate=null, collectionFlag=false, citedCount=null, citedUrl=null, reference=null)